CSSC Green Belt flashcards
CSSC Green Belt · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- SIPOC diagram
- A high-level process map listing Suppliers, Inputs, Process steps, Outputs, and Customers; used in Define to set project scope before any detailed mapping.
- CTQ tree
- A tool that translates broad Voice of Customer statements into specific, measurable Critical to Quality requirements that a project can target.
- Project charter
- A document that authorizes a Six Sigma project and defines the problem statement, business case, goal, scope, team, and timeline.
- COPQ
- Cost of Poor Quality; the money lost to internal failures, external failures, and appraisal, as contrasted with prevention spending.
- DMAIC versus DMADV
- DMAIC improves an existing process, while DMADV (Design for Six Sigma) creates a new process or product when none exists or a redesign is required.
- Kano model
- Classifies customer requirements as must-be, performance, or delighter attributes, showing where added features do or do not raise satisfaction.
- Gage R&R
- A measurement system study quantifying repeatability (equipment) and reproducibility (appraiser) variation; percent GRR under 10 is acceptable, over 30 is not.
- DPMO
- Defects Per Million Opportunities, computed as defects divided by the product of units and opportunities per unit, then multiplied by one million.
- Cp
- Process capability ratio equal to the specification width (USL minus LSL) divided by six sigma; it measures potential capability and ignores centering.
- Cpk
- Capability index equal to the smaller of (USL minus mean) or (mean minus LSL) divided by three sigma; it accounts for an off-center process.
- Rolled throughput yield
- The product of the first-pass yields of every step in a process; it shows the real probability a unit passes without rework.
- Central Limit Theorem
- The sampling distribution of the mean approaches normality as sample size grows, so means can be tested even when the population is not normal.
- Attribute versus variable data
- Variable data is continuous and measured, while attribute data is discrete counts or classifications and needs different charts and hypothesis tests.
- Type I error
- Rejecting a true null hypothesis; its probability is alpha, the significance level chosen for the test, and it is called the producer's risk.
- Type II error
- Failing to reject a false null hypothesis; its probability is beta, and the power of a test equals one minus beta.
- ANOVA
- An analysis of variance test comparing means of three or more groups by splitting total variation into between-group and within-group components.
- RPN
- Risk Priority Number in FMEA, calculated as Severity times Occurrence times Detection, each scored one to ten; higher values get priority for action.
- Chi-square test
- A hypothesis test for categorical data that compares observed counts with expected counts to assess independence or goodness of fit.
- R-squared
- The proportion of variation in the response explained by a regression model; adjusted R-squared penalizes the value when predictors are added.
- 5 Whys
- A root cause technique that repeatedly asks why a problem occurred until the underlying systemic cause rather than a symptom is identified.
- Poka-yoke
- Error proofing; a device or design change that prevents a mistake from being made or makes the error immediately obvious to the operator.
- Full factorial design
- A designed experiment testing every combination of factor levels, requiring 2^k runs for k two-level factors and estimating all interactions.
- TIMWOOD
- The seven lean wastes: Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, and Defects; adding unused talent gives TIMWOODS.
- Takt time
- Available production time divided by customer demand; it sets the pace a process must achieve to satisfy the customer.
- OEE
- Overall Equipment Effectiveness, the product of availability, performance, and quality rates; it expresses how much scheduled time is truly productive.
- 5S
- A workplace organization method with five steps, Sort, Set in order, Shine, Standardize, and Sustain, that removes clutter and exposes abnormal conditions.
- Control chart
- A time-ordered plot with a center line and upper and lower three-sigma limits, used to separate common-cause from special-cause variation.
- X-bar and R chart
- A pair of variables control charts tracking subgroup means and subgroup ranges, used for continuous data collected in small subgroups.
- p chart
- An attribute control chart for the proportion of defective units per subgroup, used when the subgroup sample size varies.
- Control plan
- A document specifying the metric, monitoring method, frequency, owner, and reaction plan for keeping an improved process in a state of control.
- Common cause variation
- Inherent random variation from many small sources inside a stable process; it can only be reduced by changing the process itself.
- Ppk versus Cpk
- Cpk uses within-subgroup sigma for short-term capability, while Ppk uses overall long-term sigma and is typically the smaller of the two values.