CSSC Green Belt key terms
CSSC Green Belt · Get comfortable with the vocabulary.
- Voice of the Customer (VOC)
- Related: Critical to Quality (CTQ), Project Charter
The structured collection and analysis of what customers need, want, and expect from a product or service, including needs they never state. It converts customer language into requirements a project can measure and act on.
- Critical to Quality (CTQ)
- Related: Voice of the Customer (VOC), Operational Definition
A product or process characteristic that measurably affects what the customer values, derived from customer input. CTQs translate broad wants into specific, testable requirements with defined targets and specification limits.
- Project Charter
- Related: Problem Statement, Tollgate Review
A document that formally authorizes a Six Sigma project and states the problem, scope, goal, team, timeline, and expected benefit. It is the team's agreement with the sponsor and changes only with sponsor approval.
- Problem Statement
- Related: Project Charter, Baseline Performance
A short, factual description of a performance gap: what is wrong, where and when it occurs, and how large the gap is. It contains data, avoids naming a cause, and does not propose a solution.
- SIPOC Diagram
- Related: Process Map, Project Charter
A one-page view of a process showing its Suppliers, Inputs, Process steps, Outputs, and Customers. Teams use it at the start of a project to agree on scope and boundaries before detailed mapping.
- Process Map
- Related: SIPOC Diagram, Value Stream Map
A diagram of the steps a process actually follows, including decisions, handoffs, and rework loops. The deployment version also shows who performs each step, which exposes delays and non-value-adding work.
- Y = f(x)
- Related: Critical to Quality (CTQ), Root Cause
The shorthand for a process relationship: the output Y is a function of input and process variables x. Green Belts define and measure Y first, then use data to find which x variables drive it.
- Business Case
- Related: Project Charter, Problem Statement
The financial and strategic justification for a project, such as cost reduction, capacity gained, risk lowered, or customer retention improved. It explains why the organization should spend resources on this effort.
- Tollgate Review
- Related: Project Charter
A scheduled checkpoint at the end of each DMAIC phase where the team presents its deliverables and evidence to sponsors and reviewers. Passing the gate confirms quality and releases resources for the next phase.
- Operational Definition
- Related: Measurement System Analysis (MSA), Data Collection Plan
A precise written description of how a characteristic is measured: the instrument, the procedure, and what counts and does not count. It makes data consistent across people, shifts, and sites.
- Measurement System Analysis (MSA)
- Related: Gage R&R, Operational Definition
A set of studies that estimates how much of the variation in data comes from the measurement system rather than the process. It examines resolution, bias, stability, repeatability, and reproducibility before data are trusted.
- Gage R&R
- Related: Measurement System Analysis (MSA)
A study that separates measurement variation into repeatability (one person measuring the same item twice) and reproducibility (different people measuring the same items). Results are judged against total or process variation.
- Data Collection Plan
- Related: Operational Definition, Sampling
A document that specifies what data will be collected, why, from which sources, by whom, how often, and how it will be recorded and verified. It prevents teams from analyzing whatever data happen to be available.
- Sampling
- Related: Data Collection Plan, Baseline Performance
Choosing a subset of units, transactions, or time periods to represent a larger population. Random selection is what allows conclusions from the sample to be extended to the population with known confidence.
- Baseline Performance
- Related: Problem Statement, Control Chart
The measured level of process performance before any improvement is made. A trustworthy baseline uses valid data over a representative period so that later gains can be proven rather than merely asserted.
- Process Capability (Cp, Cpk)
- Related: Control versus Specification Limits, Control Chart
Indices that compare the spread of a stable process with its specification limits. Cp uses only the spread, while Cpk also reflects how far the process mean sits from the nearest specification limit.
- DPMO (Defects Per Million Opportunities)
- Related: Rolled Throughput Yield (RTY)
A normalized defect rate calculated as defects divided by the product of units and opportunities per unit, then multiplied by one million. It allows processes of differing complexity to be compared on a single scale.
- Rolled Throughput Yield (RTY)
- Related: DPMO (Defects Per Million Opportunities), Process Map
The probability that a unit passes through every step of a process without a defect, obtained by multiplying the first-pass yields of all steps. It exposes hidden rework that an average final yield conceals.
- Normality Test
- Related: Process Capability (Cp, Cpk), Hypothesis Test
A statistical check, such as Anderson-Darling or Shapiro-Wilk, of whether sample data are consistent with a normal distribution. The outcome guides which capability indices and hypothesis tests are appropriate.
- Root Cause
- Related: Cause and Effect Diagram, Hypothesis Test
The underlying, controllable reason a defect or variation occurs, which if removed would stop the problem from recurring. It is confirmed with data rather than assumed from experience or opinion.
- Cause and Effect Diagram
- Related: Root Cause, Failure Mode and Effects Analysis (FMEA)
A team diagram that sorts possible causes of a problem into branches such as people, machine, method, material, measurement, and environment. It widens the search for causes before any are tested with data.
- Hypothesis Test
- Related: p-value, Type I and Type II Error
A statistical procedure that weighs sample evidence against a stated assumption about a population. The result is a probability used to decide whether an observed difference is real or plausibly due to chance.
- p-value
- Related: Hypothesis Test, Type I and Type II Error
The probability of seeing a result at least as extreme as the one observed if the null hypothesis were true. It is not the probability that the null hypothesis itself is correct.
- Type I and Type II Error
- Related: Hypothesis Test, p-value
A Type I error is rejecting a true null hypothesis, a false alarm controlled by alpha. A Type II error is failing to detect a real effect, controlled by beta; power equals one minus beta.
- ANOVA (Analysis of Variance)
- Related: Hypothesis Test, p-value
A test that compares the means of three or more groups by splitting total variation into between-group and within-group portions. A significant result indicates that at least one group mean differs.
- Regression Analysis
- Related: Hypothesis Test, Design of Experiments (DOE)
A method for modeling the relationship between one or more input variables and a continuous output, producing an equation plus measures of fit and significance. It supports prediction and estimates the size of each input's effect.
- Failure Mode and Effects Analysis (FMEA)
- Related: Root Cause, Control Plan
A structured team review that lists how a process or product could fail, then rates each failure's severity, likelihood of occurrence, and chance of detection to set improvement priorities by risk priority number.
- Design of Experiments (DOE)
- Related: Regression Analysis, Pilot
A planned set of trials in which several input factors are varied together so that their individual effects and interactions on the output can be estimated efficiently, with fewer runs than one-factor-at-a-time testing.
- Plan-Do-Check-Act (PDCA)
- Related: Kaizen, Pilot
An iterative improvement cycle: plan a change and how it will be measured, do it on a small scale, check the result against expectation, then act by standardizing or adjusting. It suits rapid learning at limited risk.
- Poka-yoke
- Related: Control Plan, Kaizen
A design feature or device that either prevents an error from being made or makes it obvious immediately, so a defect cannot pass to the next step. Good poka-yokes work without relying on operator attention.
- Kaizen
- Related: Plan-Do-Check-Act (PDCA), Poka-yoke
Continuous, incremental improvement driven by the people who do the work, often through short focused events aimed at removing waste, simplifying steps, and shortening cycle time.
- Value Stream Map
- Related: Process Map, Kaizen
A diagram of all steps, both value-adding and not, plus the information and material flows needed to deliver a product or service. It shows where time is spent and where waste and delay accumulate.
- Pilot
- Related: Plan-Do-Check-Act (PDCA), Design of Experiments (DOE)
A limited trial of a proposed change, run on a small scale or in a single area, to confirm the expected benefit and reveal side effects before full deployment across the organization.
- Control Plan
- Related: Statistical Process Control (SPC), Out-of-Control Action Plan (OCAP)
A document listing what will be monitored, the measurement method, sample size and frequency, control limits or acceptance criteria, and the action to take when a signal occurs. It sustains the gain and transfers ownership.
- Statistical Process Control (SPC)
- Related: Control Chart, Control versus Specification Limits
The use of control charts and decision rules to separate routine common-cause variation from special-cause signals, so the team reacts only when the process has genuinely changed.
- Control Chart
- Related: Statistical Process Control (SPC), Out-of-Control Action Plan (OCAP)
A time-ordered plot of a process statistic with a center line and statistically calculated control limits. Points outside the limits or non-random patterns indicate special-cause variation that needs investigation.
- Control versus Specification Limits
- Related: Process Capability (Cp, Cpk), Control Chart
Control limits are calculated from the process's own variation and describe what it is doing. Specification limits come from the customer and describe what is required; capability indices compare the two.
- Out-of-Control Action Plan (OCAP)
- Related: Control Chart, Control Plan
A pre-agreed checklist telling the operator or process owner what to check and do when a control chart shows a special-cause signal, so responses are fast, correct, and consistent.
- Process Owner
- Related: Control Plan, Tollgate Review
The person accountable for a process's ongoing performance after the project closes, responsible for maintaining the control plan, keeping documentation current, and sustaining the gains.