ICDL Project Planning · Get comfortable with the vocabulary.

Project

A temporary effort with a defined start and end, undertaken to create a unique product, service, or result. It has specific objectives, constraints, and resources.

Related: Project Life Cycle, Project Charter
Project Life Cycle

The sequence of phases a project passes through from initiation to closure. Common phases include initiating, planning, executing, monitoring and controlling, and closing.

Related: Project, Project Charter
Project Charter

A formal document that authorizes the project and gives the project manager authority to apply resources. It states the project purpose, objectives, and high-level requirements.

Related: Project, Stakeholder
Stakeholder

Any individual, group, or organization that can affect, be affected by, or perceive itself to be affected by a project decision or outcome. Stakeholders may be internal or external.

Related: Project Charter, Project Scope Statement
Project Scope Statement

A document that describes the project deliverables, boundaries, and acceptance criteria in detail. It clarifies what is included and excluded from the project.

Related: Work Breakdown Structure, Scope Creep
Work Breakdown Structure (WBS)

A hierarchical decomposition of the total scope of work into smaller, manageable components. The lowest level items are called work packages.

Related: Work Package, Project Scope Statement
Work Package

The smallest deliverable or component at the bottom of a work breakdown structure. It can be estimated, scheduled, and assigned to a person or team.

Related: Work Breakdown Structure (WBS), Activity
Scope Creep

Uncontrolled changes or additions to project scope without corresponding adjustments to time, cost, or resources. It often leads to delays and budget overruns.

Related: Project Scope Statement, Change Control
Activity

A distinct, scheduled unit of work performed during the project. Activities are derived from work packages and have estimated durations and resource needs.

Related: Work Package, Milestone
Milestone

A significant point or event in the project with zero duration. It marks the completion of a key deliverable or phase and is used to track progress.

Related: Activity, Baseline
Dependency

A relationship between two activities where one must start or finish before the other can start or finish. Dependencies can be mandatory, discretionary, or external.

Related: Predecessor, Successor
Predecessor

An activity that must occur before another activity in a dependency relationship. The predecessor's timing affects when the successor can begin or end.

Related: Successor, Dependency
Successor

An activity that depends on the completion or start of another activity. Its start or finish is constrained by the predecessor.

Related: Predecessor, Dependency
Finish-to-Start (FS)

A dependency where the successor activity cannot start until the predecessor activity has finished. It is the most common type of dependency.

Related: Dependency, Predecessor
Lead

The amount of time a successor activity can be advanced relative to a predecessor. It allows overlapping of activities that would otherwise be sequential.

Related: Lag, Dependency
Lag

The amount of time a successor activity is delayed after a predecessor. It is inserted into a dependency to account for waiting time or required gaps.

Related: Lead, Dependency
Estimate

A quantitative assessment of the likely amount of time, cost, or resources needed to complete an activity or project. Estimates are based on available information and assumptions.

Related: Analogous Estimating, Three-Point Estimating
Analogous Estimating

A technique that uses historical data from similar past projects to estimate duration or cost. It is quick but less accurate than detailed methods.

Related: Estimate, Parametric Estimating
Parametric Estimating

An estimating technique that uses a statistical relationship between historical data and other variables to calculate estimates. For example, cost per square meter multiplied by area.

Related: Analogous Estimating, Three-Point Estimating
Three-Point Estimating

A technique that uses three estimates-optimistic, pessimistic, and most likely-to calculate an expected duration or cost. It accounts for uncertainty and risk.

Related: Estimate, Parametric Estimating
Resource

Any person, equipment, material, or facility needed to complete project activities. Resources have limited availability and may need to be scheduled and leveled.

Related: Resource Allocation, Resource Leveling
Schedule

A plan that shows when activities will be performed and how long they will take. It includes start and finish dates, dependencies, and milestones.

Related: Critical Path, Gantt Chart
Critical Path

The longest sequence of dependent activities that determines the shortest possible project duration. Any delay on the critical path delays the entire project.

Related: Float, Schedule
Float (Slack)

The amount of time an activity can be delayed without delaying the project finish date or a subsequent activity. Activities on the critical path have zero float.

Related: Critical Path, Schedule
Gantt Chart

A horizontal bar chart that displays project activities against a calendar timeline. It shows start and end dates, durations, and dependencies.

Related: Schedule, Critical Path
Resource Allocation

The process of assigning available resources to project activities. It ensures that the right resources are available when needed to perform the work.

Related: Resource Leveling, Resource
Resource Leveling

A technique that adjusts the schedule to resolve resource over-allocation or conflicts. It may change the critical path and extend the project duration.

Related: Resource Allocation, Critical Path
Resource Smoothing

A technique that adjusts activities within their float to balance resource usage without changing the critical path or project finish date. It does not extend the schedule.

Related: Resource Leveling, Float (Slack)
Baseline

An approved version of the project plan, including scope, schedule, and cost, used to compare actual performance. Changes to the baseline require formal approval.

Related: Variance, Change Control
Variance

The difference between planned and actual performance, such as schedule variance or cost variance. It indicates whether the project is ahead or behind plan.

Related: Baseline, Earned Value Management
Earned Value Management (EVM)

A technique that integrates scope, schedule, and cost to measure project performance and progress. It compares planned value, earned value, and actual cost.

Related: Variance, Baseline
Progress Report

A document that communicates project status, accomplishments, issues, and upcoming work to stakeholders. It is typically produced at regular intervals.

Related: Baseline, Variance
Change Control

A formal process for reviewing, approving, and managing changes to project scope, schedule, or cost. It prevents uncontrolled changes and scope creep.

Related: Scope Creep, Baseline
Assumption

A factor that is considered true for planning purposes without proof. If an assumption proves false, it can affect project scope, schedule, or cost.

Related: Constraint, Estimate
Constraint

A limitation or restriction that affects project execution, such as limited budget, fixed deadline, or scarce resources. Constraints must be managed and balanced.

Related: Assumption, Resource