ICDL Project Planning study materials
ICDL Project Planning study resources

ICDL Project Planning (ICDL) study plan

ICDL Project Planning · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Project Planning Fundamentals & Scheduling and Critical Path

  • Define the five project process groups and map each to a concrete planning activity

  • Identify the three schedule constraints (scope, time, cost) and explain how a change to one affects the others

  • Compute the critical path for a 10-activity network diagram by hand, including forward and backward pass

  • Calculate total float for every activity in that network and flag the zero-float activities

Your checkpoint

A one-page reference sheet with the process group map plus a fully worked 10-activity network showing early/late start and finish, total float, and the critical path highlighted

Week 2

Scheduling and Critical Path & Task Dependencies and Sequencing

  • Distinguish finish-to-start, start-to-start, finish-to-finish, and start-to-finish relationships with a real example of each

  • Apply lead and lag values to a dependency chain and recompute the affected dates

  • Identify near-critical paths and explain why a path with small float still carries schedule risk

  • Perform a forward and backward pass on a network that includes at least two non-finish-to-start links

Your checkpoint

A worked dependency exercise: a 12-activity network with mixed dependency types, leads and lags, showing recalculated dates and a written note on the near-critical path

Week 3

Project Scope and Work Breakdown & Estimating Duration and Resources

  • Decompose a sample project into a three-level work breakdown structure with a unique identifier for every work package

  • Write a scope statement containing deliverables, exclusions, and acceptance criteria

  • Select an estimating technique (analogous, parametric, three-point) for four different task types and justify each choice

  • Compute a PERT expected duration and standard deviation from optimistic, most likely, and pessimistic estimates

Your checkpoint

A complete WBS for a realistic 20-30 task project plus a duration estimate table showing the technique used and PERT calculations for at least five tasks

Week 4

Scheduling and Critical Path & Estimating Duration and Resources

  • Build a full schedule from the WBS and dependency network, assigning durations and calendar dates

  • Crash two critical-path activities and calculate the cost per unit of time saved

  • Fast-track a dependency chain and identify the added risk it introduces

  • Explain how resource availability assumptions can invalidate a duration estimate

Your checkpoint

A dated project schedule with critical path identified, plus a one-page compression analysis comparing crashing and fast-tracking options with their cost and risk trade-offs

Week 5

Resource Allocation and Leveling & Task Dependencies and Sequencing

  • Assign named resources to every task in the schedule and identify overallocations

  • Apply resource leveling to resolve overallocations and document the resulting schedule delay

  • Distinguish resource leveling from resource smoothing and state when each is appropriate

  • Recompute the critical path after leveling and explain any change in float

Your checkpoint

A before-and-after resource histogram with a written leveling log recording each overallocation, the resolution chosen, and the schedule impact

Week 6

Project Tracking, Baselines and Progress Reporting & Resource Allocation and Leveling

  • Establish a baseline from the approved schedule and record baseline start, finish, and duration for every task

  • Calculate schedule variance and schedule performance index from sample progress data

  • Apply the percent-complete and remaining-duration update rules to a mid-project status snapshot

  • Draft a progress report containing status, variance, forecast, and issues

Your checkpoint

A baseline-versus-actual variance report for a sample project with computed schedule variance, schedule performance index, and a forecast completion date

Week 7

Project Planning Fundamentals & Project Scope and Work Breakdown & Project Tracking, Baselines and Progress Reporting

  • Trace a scope change through impact analysis, approval, and baseline update

  • Identify the planning errors that most often cause schedule slippage and describe a preventive control for each

  • Reconcile a WBS to the schedule to confirm every work package maps to at least one activity

  • Summarize how earned value, milestone tracking, and percent-complete reporting differ in what they reveal

Your checkpoint

A change control case study: one scope change analyzed end to end, with revised schedule, revised baseline, and a written justification for the approval decision

Week 8

Scheduling and Critical Path & Project Tracking, Baselines and Progress Reporting & Project Planning Fundamentals

  • Complete two full-length timed practice exams and score each by domain

  • Re-derive the critical path and float calculations from memory without reference material

  • Review every missed question and write the underlying rule it tested

  • State the key definitions for all seven domains in a self-quiz without notes

Your checkpoint

A scored practice exam log by domain with a written error analysis for every missed item and a final one-page formula and definitions sheet

Milestones

Week 2: Can compute forward pass, backward pass, total float, and critical path on an unseen 12-activity network in under 20 minutes with no notes

Week 4: Can produce a complete WBS-to-schedule chain for a new project scenario and pass a 20-question self-quiz on scope and estimating at 80 percent or better

Week 6: Can resolve a resource overallocation and calculate schedule variance and schedule performance index from raw progress data without reference material

Week 8: Score 80 percent or higher on two timed practice exams, with no domain below 70 percent