HubSpot CMS for Marketers study materials
HubSpot CMS for Marketers study resources

HubSpot CMS for Marketers study plan

HubSpot CMS for Marketers · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

CMS content creation and management

  • Configure a HubSpot CMS sandbox portal and create a page, a blog post, and a landing page from scratch to map the content-creation workflow

  • Create and reuse global content (header, footer, CTA module) across at least three pages to practice content reuse

  • Organize content with a naming and folder convention, then move and clone assets to test management operations

  • Build a draft-to-publish workflow using a staging domain or preview link and document the steps

Your checkpoint

A one-page workflow map plus three published sandbox assets (page, blog post, landing page) sharing one reusable global module

Week 2

CMS content creation and management & Website pages and templates

  • Identify the difference between website pages, landing pages, and blog posts and create one of each in the sandbox

  • Edit a page template's editable regions and modules to understand how editors constrain content authors

  • Apply a theme's style fields and settings to restyle an existing page without touching code

  • Audit one page for module bloat and remove unused modules to simplify authoring

Your checkpoint

A comparison table of the three page types with screenshots-free written notes, plus one simplified page template with annotated editable regions

Week 3

Website pages and templates

  • Draft and build a reusable page template with a hero, flexible column section, and CTA area

  • Configure module fields so a marketer can change text, image, and link without editing source

  • Create a custom module and test it in the page editor across at least two pages

  • Document template versioning and rollback steps for safe changes

Your checkpoint

A working custom module plus template used on two live sandbox pages, with a short field-reference sheet

Week 4

Website pages and templates & Blog and content strategy

  • Structure a blog with categories and tags and assign existing posts to the taxonomy

  • Configure blog templates and listing page settings including author and tag views

  • Set up a content calendar covering four weeks of posts with target keywords and CTAs

  • Create a content repurposing checklist linking blog posts to landing pages and CTAs

Your checkpoint

A four-week editorial calendar in a spreadsheet plus a blog with categorized posts and working tag and author listing pages

Week 5

Blog and content strategy

  • Write and publish two blog posts optimized for distinct search intents

  • Build a gated landing page with a form and thank-you page tied to one blog post

  • Set up a subscription or follow-up email workflow triggered by the form submission

  • Review blog performance metrics and adjust the calendar based on what performed

Your checkpoint

Two published posts plus one landing page and form workflow, with a written adjustment to the editorial calendar

Week 6

SEO and on-page optimization

  • Audit five pages for title tags, meta descriptions, and heading hierarchy and fix the issues

  • Configure canonical URLs, redirects, and a sitemap setting for the sandbox site

  • Add structured data or schema settings where supported and validate the output

  • Run a page-level on-page checklist covering internal links, image alt text, and URL structure

Your checkpoint

A completed on-page audit sheet for five pages listing each issue found and the fix applied

Week 7

SEO and on-page optimization & Reporting and analytics

  • Set up an analytics dashboard tracking traffic sources, page views, and conversions

  • Create a report comparing two blog posts and two landing pages by conversion rate

  • Configure campaign tracking parameters and verify attribution in reports

  • Interpret one report and write two prioritized optimization recommendations

Your checkpoint

A dashboard plus a two-page report with conversion comparisons and two prioritized recommendations

Week 8

Reporting and analytics & CMS content creation and management

  • Review all five domains and list weak spots with a remediation action for each

  • Build a full-funnel report from page view to form submission to contact

  • Re-audit the sandbox site for content, template, SEO, and reporting gaps and close the top three

  • Complete a timed practice set covering all domains and review every missed item

Your checkpoint

A full-funnel report plus a remediation log showing three closed gaps and a scored practice set summary

Milestones

Week 2: Can create, edit, and publish a page, blog post, and landing page from scratch without notes, and explain how templates constrain editing

Week 4: Can build and reuse a custom module and template across multiple pages, and has a categorized blog with a four-week calendar

Week 6: Can complete an on-page SEO audit for five pages and correctly configure redirects, canonicals, and sitemap settings

Week 8: Can build a full-funnel report, explain conversion differences between assets, and score at least 80% on a mixed-domain practice set