ICC CBO study plan
ICC CBO · Give each week a clear focus.
8 weeks · About 7 hours per week
Legal and Administrative Provisions
Outline the statutory chain of authority that gives a code official the power to adopt, interpret, and enforce a construction code
Define 25 core administrative terms (permit, owner, registered design professional, stop-work order, substantial damage) in your own words
Map the adoption-to-amendment process for a local code, including how local amendments and appeals boards are created
Distinguish the roles of the code official, the board of appeals, and the governing body in writing
Your checkpoint
A one-page authority flowchart plus a 25-term glossary scored against the source text, with any missed term redefined
Legal and Administrative Provisions & Permitting and Plan Review
Summarize the legal limits on inspections and entry, including warrant/consent concepts and right of entry provisions
Compare the permit types and when each is required versus exempt
Sequence the permit application intake process from submittal to completeness review
Identify the record-keeping and public-records obligations attached to permit files
Your checkpoint
A two-column table matching 12 permit scenarios to 'permit required' or 'exempt' with the governing provision cited for each
Permitting and Plan Review
Break down a plan review into its component checks: use group, occupancy load, egress, fire-resistance, and accessibility
Compute occupant load and required egress width for three worked examples
Draft a plan review comment that cites the specific code section, states the deficiency, and requests a correction
Explain the conditions that can be attached to a permit and how revisions are processed
Your checkpoint
Three completed plan review worksheets with occupancy calculations, plus six sample correction comments in proper citation form
Permitting and Plan Review & Inspection and Field Enforcement
Explain the permit issuance workflow, including issuance after review, conditional permits, and permit expiration and extension
List the inspection milestones in a typical project and what must be verified at each
Describe how approved plans and permit documents govern what the inspector verifies in the field
Practice writing a field observation note that is factual, dated, and code-referenced
Your checkpoint
A permit lifecycle timeline from application through certificate of occupancy, annotated with the inspection gate at each stage
Inspection and Field Enforcement
Distinguish the purposes of progress, final, and specialized inspections and when each is triggered
Outline how to conduct an inspection: preparation, entry, observation, testing, documentation, and notification
State the criteria and procedure for issuing a stop-work order and for removing a hazardous condition
Describe how to handle a request for inspection that cannot be approved, including re-inspection and approval conditions
Your checkpoint
A field inspection checklist covering 15 verifiable items with pass/fail criteria, tested against two hypothetical site scenarios
Code Enforcement and Violations
Classify violations by severity and select the appropriate initial response for each class
Draft a notice of violation that identifies the property, the provision violated, the corrective action, and the compliance deadline
Sequence the enforcement ladder from notice through hearing, penalty, and abatement, noting the due-process step at each stage
Explain the standards for unsafe or imminently dangerous structures and the emergency measures available
Your checkpoint
A full enforcement case file for one hypothetical violation: notice, escalation log, and hearing summary, internally consistent with the enforcement ladder
Department Management and Administration & Code Enforcement and Violations
Outline the department's budget cycle, fee schedule rationale, and staffing/coverage model
Describe personnel practices including training records, conflict-of-interest limits, and performance documentation
Explain how records, reporting metrics, and interagency coordination support enforcement outcomes
Re-test the violation-notice drafting from week 6 and correct any weak citations
Your checkpoint
A one-page department operations brief covering budget, staffing, records, and reporting, plus a corrected notice of violation scored above your week 6 attempt
Legal and Administrative Provisions & Permitting and Plan Review & Inspection and Field Enforcement & Code Enforcement and Violations & Department Management and Administration
Synthesize all five domains into a single process map from adoption through enforcement
Complete a timed 60-question mixed practice set and categorize every miss by domain
Rewrite the weakest three domain summaries from memory and compare against your notes
Identify the top five remaining gaps and schedule targeted review before exam day
Your checkpoint
Scored mixed practice set at 80% or better, with a written gap list and a review schedule for each remaining weak area
Milestones
Week 2: Can define the legal authority chain and permit-required criteria from memory with 90% accuracy on a self-quiz
Week 4: Complete a plan review worksheet end-to-end, including occupancy and egress calculations, within 45 minutes
Week 6: Draft a notice of violation from a scenario in under 20 minutes with correct provision citation and a defensible deadline
Week 8: Score 80% or higher on the timed 60-question mixed set with no domain below 60%