ICC F3 · Keep the key ideas within reach.

Quick reference

Plan Reading

  • Scale is a ratio: 1/8" = 1'-0" is 1:96, 1/4" = 1'-0" is 1:48, 1/16" = 1'-0" is 1:192, 3/32" = 1'-0" is 1:128, and 1" = 20' (site plans) is 1:240.

  • Sheet prefixes identify the discipline: A architectural, S structural, M mechanical, E electrical, P plumbing, FP fire protection, FA fire alarm, C civil, L landscape.

  • Written dimensions govern; scaled measurements are indicative only, and details marked NTS cannot be measured at all.

  • Revision clouds enclose changed work and carry a delta symbol plus a number that matches the revision block entry (date and description).

  • Line conventions: solid = visible, dashed = hidden or overhead (ducts, beams, soffits), dashed-dot = centerline, heavy/broken = section cut line.

  • A compliant title block states occupancy classification, construction type, code edition, gross floor area per story, and the designer of record.

  • Detail and section callouts take the form detail number / sheet number, e.g., 3/A-501, and must resolve to an actual detail on the referenced sheet.

  • Fire department access checks on the site plan: 20 ft minimum width, 13 ft 6 in vertical clearance, within 150 ft of all exterior walls at grade, grade not exceeding 10 percent.

  • Cross-check the floor plan against the reflected ceiling plan and the fire protection plan for sprinkler spacing, detector locations and ceiling obstructions.

Quick reference

Documentation and Reporting

  • A plan review comment states four things in order: the code section violated, the sheet/detail location, the condition found, and the correction required.

  • Every inspection entry is a legal record and must include date, time, inspector name, permit number, code edition applied, and the disposition (approved, conditionally approved, disapproved).

  • Correction notices are itemized, cite code sections, and state whether re-inspection requires a new request or fee.

  • A stop work order is issued in writing, states the reason and the corrective action, and is posted at the site.

  • A certificate of occupancy is issued only after all final inspections are approved and required test reports, certifications and as-built documents are in the permit file.

  • Approved, stamped plan sets are retained in the permit record; field changes require revised plans rather than handwritten annotations.

  • Contractor test documents required before acceptance include the NFPA 13 material and test certificate, fire alarm acceptance test records, and firestop system documentation.

  • Reports should state findings and code citations, not personal opinion, and should record who was present and what was witnessed.

Quick reference

Code Compliance and Inspection Procedures

  • Inspection sequence: underground/buried piping, then rough-in of concealed work, then final; concealment is not permitted before the rough-in is approved.

  • Sprinkler piping is hydrostatically tested at 200 psi for 2 hours, or at 50 psi above the maximum working pressure where that pressure exceeds 150 psi.

  • Underground supply mains are flushed and, where required, flow tested before connection to aboveground piping.

  • Sprinkler deflectors are located 1 in to 12 in below the ceiling and must be kept clear of obstructions that would block the spray pattern.

  • Two separate exits are required where the occupant load exceeds 49 in most occupancies; a single exit for Group B is limited to 49 occupants with travel distance not exceeding 75 ft.

  • Egress width: 0.2 in per occupant for corridors and doors, 0.3 in per occupant for stairs (unsprinklered); reduced to 0.15 in and 0.2 in where the building is sprinklered and has an approved voice alarm.

  • Minimum clear widths: 32 in for doors, 44 in for corridors (36 in permitted where the occupant load is under 50).

  • Exit access travel distance in Group B is 200 ft unsprinklered and 250 ft sprinklered.

  • High-rise threshold: an occupied floor more than 75 ft above the lowest level of fire department vehicle access, triggering standpipe, sprinkler and fire alarm requirements.

Quick reference

Materials, Methods and Testing

  • ASTM E119 is the fire-resistance test that produces hourly ratings for walls, floors, columns and beams; ratings are assembly-specific, not material-specific.

  • ASTM E84 yields flame spread and smoke developed indexes: Class A is 0-25 flame spread, Class B is 26-75, Class C is 76-200.

  • ASTM E136 identifies noncombustible materials; Types I and II construction require noncombustible structural elements.

  • Through-penetration firestop systems are qualified by ASTM E814 (UL 1479); joint systems by ASTM E1966 (UL 2079); both must match the listed system, including annular space and fill material.

  • Fire door assemblies are qualified by NFPA 252 or UL 10C and carry a label stating the hourly rating; NFPA 80 requires annual inspection and maintenance.

  • Spray-applied fire-resistive materials must be applied at the listed thickness and density for the required hourly rating, with thickness verified by gauge and density by the manufacturer's method.

  • Construction types: Type IA = 3-hour structural, IB = 2-hour, IIA = 1-hour, IIB = unprotected, IIIA = 1-hour exterior, IV = heavy timber, V = combustible.

  • Duct smoke detectors are required by NFPA 90A for air-handling systems above the listed capacity, and fire dampers protect rated assembly penetrations.

  • Fireblocking stops concealed air movement in stud and joist spaces; draftstopping divides concealed combustible spaces in floor/ceiling assemblies.

Quick reference

Administration

  • A permit is required for new construction, alteration, repair beyond ordinary maintenance, change of use, and installation of regulated fire protection systems.

  • Under IBC Section 105.5, a permit becomes invalid if work does not commence within 180 days of issuance or is suspended or abandoned for 180 days.

  • Alternative materials and methods are approved under the code section permitting equivalents when the official finds performance, quality, strength and safety equivalent to the prescribed requirement.

  • The board of appeals hears challenges to code official decisions; it may reverse or modify a decision but cannot arbitrarily set aside code requirements.

  • Deferred submittals must be identified on the approved plans with a submission deadline and are not approved until reviewed separately.

  • Permit fees are typically calculated from declared construction valuation or from floor area by occupancy group, per the adopted fee schedule.

  • A temporary certificate of occupancy may be issued for a stated period with conditions that protect life safety until all work is complete.

  • The code official has authority to enter and inspect premises at reasonable times to enforce the code; refusal may be addressed through legal process.

Quick reference

Rules and Policies

  • The edition of the code and referenced standards adopted by ordinance governs the review, not the most recent published edition.

  • Referenced standards (NFPA 13, NFPA 72, ASTM E84, etc.) are enforceable as part of the code, including the specific edition referenced.

  • A code official has no authority to waive a code requirement; relief comes only through a documented modification, variance or appeal.

  • Conflict of interest: an official must disclose any financial interest, family relationship or outside employment involving the project and recuse from review and inspection.

  • Proprietary or confidential design information in submitted plans is released only as required by open-records law or for enforcement proceedings.

  • Ex parte contact about a pending permit or appeal should be documented and placed in the file so the record remains complete and defensible.

  • Violation and stop work notices are served in writing as prescribed by the code, and the file records the date, method and recipient.

  • Consistency rule: the same interpretation is applied to comparable conditions across projects, and significant interpretations are documented for future reference.