Occupant Load

The number of people a space is designed to hold, calculated from its floor area and use. It sets required egress width, the number of exits, and fixture counts shown on the plans.

Related: Means of Egress, Occupancy Classification, Travel Distance
Travel Distance

The measured length along the path of egress travel from the most remote point in a space to the nearest exit. Plans must show it stays within the limit for the occupancy and sprinkler status.

Related: Common Path of Egress Travel, Exit Access
Common Path of Egress Travel

The portion of exit access where occupants have only one route to follow before reaching a point with two separate ways out. Long common paths are limited because one blockage could trap people.

Related: Travel Distance, Exit Access
Plot Plan

A site drawing showing the building footprint, property lines, setbacks, access roads, fire hydrants, and grading. Inspectors use it to confirm separation distances and site access match the approved design.

Related: Scale, Plan Review
Scale

The ratio on a drawing that relates a measured distance to the real dimension it represents, such as one-quarter inch equals one foot. An incorrect scale can make a detail look compliant when it is not.

Related: Plot Plan, Plan Review
As-Built Drawings

Drawings revised during construction to record the conditions actually installed rather than what was originally designed. They support final approval, future maintenance, and later alteration work.

Related: Addendum, Request for Information
Addendum

A written change issued during bidding or construction that modifies the plans or specifications. It carries the same authority as the original documents it amends and must be reflected in the field.

Related: Request for Information, As-Built Drawings
Request for Information

A formal written question from the contractor asking the designer to clarify or confirm something in the construction documents. The answer becomes part of the project record and may lead to a change order.

Related: Addendum, As-Built Drawings
Inspection Report

A written record of what an inspector observed, measured, and tested at a site, including deficiencies and the code sections they violate. It should be factual, dated, and clear enough to support later enforcement.

Related: Notice of Violation, Re-inspection
Notice of Violation

A formal written notice telling a responsible party that a code violation exists, citing the section, describing the condition, and setting a deadline for correction along with appeal rights.

Related: Inspection Report, Re-inspection, Stop Work Order
Means of Egress

The continuous, unobstructed route from any point in a building to a public way, made up of exit access, the exit itself, and exit discharge.

Related: Exit Access, Exit Discharge
Exit Access

The part of the egress system that leads from an occupied space to an exit. It includes aisles, corridors, and doorways, and is where most egress problems are found.

Related: Means of Egress, Travel Distance
Exit Discharge

The portion of the egress path between the exit and the public way, such as an exterior court or sidewalk. It must remain open and unobstructed all the way to the street.

Related: Means of Egress
Occupancy Classification

The use group assigned to a building or space, such as assembly, business, or storage, based on how it is occupied. The classification drives most other code requirements for that building.

Related: Occupant Load, Certificate of Occupancy
Listed

Equipment or materials included in a published list by an approved testing agency, showing they meet a recognized standard. Inspectors verify listing before accepting an installation in the field.

Related: Labeled, Fire Damper
Labeled

Bearing a manufacturer's label, symbol, or tag showing the product was produced under a listing agency's follow-up program. The label ties the item installed on site to the product that was tested.

Related: Listed, Spray-Applied Fire-Resistive Material
Re-inspection

A follow-up visit to confirm that previously cited deficiencies have been corrected. A fee may apply, and repeated failures can trigger escalated enforcement such as a stop work order.

Related: Inspection Report, Notice of Violation
Panic Hardware

A door-latching assembly that releases with a single push in the direction of travel without a key or special knowledge. It is required on many doors serving assembly and other high-occupancy spaces.

Related: Means of Egress, Exit Access
Plan Review

The office review of submitted drawings and calculations against the adopted code before a permit is issued. Reviewers note deficiencies and mark the set approved, approved as noted, or denied.

Related: Permit, As-Built Drawings
Fire-Resistance Rating

The period, in hours or minutes, that a building element withstands a standard fire test while continuing to serve its structural or separating function. It is stated on plans for walls, floors, and shafts.

Related: ASTM E119, Firestopping, Fire Damper
Flame Spread Index

A number from a standard surface-burning test that rates how quickly flame spreads across a material's surface. Interior finish limits are set using this index together with smoke development.

Related: ASTM E119
Firestopping

Approved materials installed to seal openings and joints in fire-rated construction so the assembly keeps its rating. It must match a tested system for the specific penetrating item and substrate.

Related: Fireblocking, Fire-Resistance Rating
Fireblocking

Concealed building materials installed in hidden spaces such as stud cavities and furred spaces to stop the concealed spread of fire and smoke. It is not the same as firestopping, which seals rated assemblies.

Related: Firestopping, Draftstopping
Draftstopping

Materials used in concealed floor or ceiling spaces of large open areas to subdivide them into smaller compartments, limiting the horizontal movement of smoke and fire through the void.

Related: Fireblocking
Fire Damper

A listed device installed in an air duct where it passes through a rated assembly, closing on heat to protect the rating. Access for inspection and testing must be provided.

Related: Firestopping, Fire-Resistance Rating
ASTM E119

The standard fire test method for building construction and materials, used to establish fire-resistance ratings for walls, floors, columns, and beams. Ratings accepted by the code are based on this test.

Related: Fire-Resistance Rating, Spray-Applied Fire-Resistive Material
Spray-Applied Fire-Resistive Material

A cementitious or fibrous coating sprayed onto structural steel to insulate it and achieve a required fire-resistance rating. Thickness and density must be verified in the field against the tested design.

Related: ASTM E119, Fire-Resistance Rating, Labeled
Hydraulic Calculation

The engineering method that computes pressure and flow at each sprinkler head and through the piping to prove the system delivers the required density. Inspectors compare the installed system to the approved calculation.

Related: Water Flow Test, Plan Review
Water Flow Test

A field test measuring static pressure, residual pressure, and available flow from a hydrant or test valve. Results support sprinkler design and show whether the water supply is adequate.

Related: Hydraulic Calculation
Authority Having Jurisdiction

The organization or official responsible for enforcing the code, approving materials and methods, and issuing permits. The code grants this authority discretion to interpret requirements and to require tests.

Related: Permit, Board of Appeals, Referenced Standard
Permit

The written authorization issued before construction or installation begins. Working without one, or beyond its stated scope, is a violation and can result in a stop work order.

Related: Certificate of Occupancy, Plan Review, Stop Work Order
Certificate of Occupancy

A document issued after final inspection confirming the building complies with the code and may be occupied for a stated use. A change of use or major alteration usually requires a new one.

Related: Permit, Occupancy Classification
Referenced Standard

A technical standard adopted by reference in the code, such as an installation or test standard. It carries the force of code, and inspectors cite it alongside the code section.

Related: Authority Having Jurisdiction, Listed
Stop Work Order

A written directive halting work that is proceeding without a permit, contrary to approved plans, or in an unsafe manner. Work may not resume until the cited condition is resolved and released.

Related: Permit, Notice of Violation
Variance

A grant of relief from a specific code requirement because of practical difficulty or unnecessary hardship, issued by an authorized body after application and hearing. It applies only to that property.

Related: Board of Appeals, Authority Having Jurisdiction
Board of Appeals

A panel established under the code to hear appeals of decisions by the code official, such as a denied permit or a notice of violation. Its decisions are binding, subject to law.

Related: Variance, Authority Having Jurisdiction
Conflict of Interest

A situation where an inspector's personal, financial, or family interest could influence official judgment, such as inspecting work for a relative's company. It must be disclosed and avoided.

Related: Authority Having Jurisdiction