ICC F3 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plan Reading, Documentation and Reporting & Code Compliance and Inspection Procedures

  • Label the sheet types in a sample plan set (site plan, floor plans, reflected ceiling, elevations, sections, details, schedules) and state the information each sheet type normally carries

  • Trace three separate drawing callouts to their specification section and the governing code section

  • Extract the occupancy classification and construction type from a set of plan notes and record both on a review cover sheet

  • Convert three scaled dimensions from an architectural scale (e.g., 1/8 in = 1 ft) into actual feet and inches

  • Separate what is shown graphically from what is only stated in notes or schedules on the same sheet

Your checkpoint

A one-page plan-set index plus a callout-tracing log covering a complete sample plan set, self-checked against an answer key with every miss corrected.

Week 2

Code Compliance and Inspection Procedures & Plan Reading, Documentation and Reporting

  • Compute occupant load for five rooms using the correct floor-area factors and the net-versus-gross distinction

  • Verify number of exits, egress width, and travel distance on a sample floor plan against code minimums

  • Diagram the full means-of-egress path (exit access, exit, exit discharge) on a marked-up floor plan

  • Detect three seeded plan-review deficiencies in a practice plan and write the code citation for each

  • Check door swing, hardware, and opening-protection requirements for four doors on the plan

Your checkpoint

A completed egress review worksheet for one sample floor plan with occupant loads, required versus provided exits, measured travel distances, and three written code citations.

Week 3

Code Compliance and Inspection Procedures & Materials, Methods and Testing

  • Classify ten fire-resistance-rated assemblies by hourly rating and match each to its permitted use in a given occupancy

  • Sequence the inspection steps for a rated assembly from rough-in to final and name who verifies each step

  • Distinguish listed from non-listed materials and state the test documentation you would require for each

  • Identify the required separation between rated elements and the openings or penetrations that pass through them

  • Explain how a rating is compromised and what a plans examiner should reject at review

Your checkpoint

A rated-assembly matrix of ten assemblies, each with rating, code basis, verification method, and required supporting documentation.

Week 4

Materials, Methods and Testing

  • Describe the standard test method, specimen, and acceptance criteria for concrete compressive strength, structural steel welding, and firestop penetration testing

  • Interpret a materials test report and mark each result pass or fail against the specified criteria

  • List the inspection hold points for three common building elements and state what must be visible at each

  • State what a special inspector must submit, to whom, and when, including the final report

  • Name the documentation that must exist before an element is covered or concealed

Your checkpoint

A two-page testing and inspection summary covering five test types, each with method, acceptance criteria, and reporting requirement.

Week 5

Administration, Rules and Policies

  • Map the permit lifecycle from submittal through certificate of occupancy and name the decision point at each step

  • Distinguish the authority and duties of the code official, plans examiner, and field inspector under the administrative provisions

  • Outline the procedure for a modification request, an alternative-materials request, and a formal appeal

  • Apply recordkeeping, retention, and confidentiality rules to a sample case file

  • Identify the limits on a plans examiner's authority when a design professional disagrees with a comment

Your checkpoint

A one-page permit-process flowchart with the code basis and applicable timeframes annotated at every step.

Week 6

Administration, Rules and Policies & Code Compliance and Inspection Procedures

  • Draft written plan-review comments that each cite the code section, state the deficiency, and specify the required correction

  • Script responses to three common applicant objections (alternate method, existing-building argument, phased permit)

  • Explain how code adoption, local amendments, and ordinances change what you actually enforce on a given project

  • Reconcile a conflict between a drawing detail and a specification section and decide which controls

  • Apply a citation/deficiency/correction rubric to your own written comments and score them

Your checkpoint

Five written plan-review comments in agency format, each scored against the citation/deficiency/correction rubric with revisions noted.

Week 7

Plan Reading, Documentation and Reporting & Code Compliance and Inspection Procedures & Materials, Methods and Testing & Administration, Rules and Policies

  • Complete two timed 50-question practice sets under exam conditions with no notes

  • Tabulate every missed question by domain and by error type (knowledge gap, misread, calculation, time pressure)

  • Re-work the ten most frequently missed concepts directly from code text and record the exact section

  • Practice locating a cited section in the code book within 30 seconds

  • Adjust your pacing plan based on the per-question time recorded in both sets

Your checkpoint

An error log of every missed question listing domain, cause, and the code section that resolves it, plus a revised pacing plan.

Week 8

Materials, Methods and Testing & Administration, Rules and Policies & Plan Reading, Documentation and Reporting & Code Compliance and Inspection Procedures

  • Re-drill the two lowest-scoring domains identified in the Week 7 error log

  • Recite from memory the plan-review workflow and the inspection sequence for a rated assembly

  • Complete one full-length timed simulation and review every miss before leaving the session

  • Condense all remaining weak points into a single sheet you will review the morning of the exam

  • Confirm exam-day logistics: allowed references, identification, and time allocation

Your checkpoint

A final scorecard showing domain-by-domain accuracy on the full-length simulation plus a one-page personal weak-spot sheet.

Milestones

Week 2: Complete one sample floor plan end-to-end (occupant load through egress discharge) with no more than two citation errors against the answer key.

Week 4: Score at least 75% on a 40-question mixed quiz covering Domains 1-3; log any domain below 70% for extra drills in Weeks 5-7.

Week 6: Submit five plan-review comments that each pass the citation/deficiency/correction rubric without a rewrite.

Week 8: Score at least 80% overall on the full-length timed simulation with no single domain below 70%.