ICC F3 study plan
ICC F3 · Give each week a clear focus.
8 weeks · About 7 hours per week
Plan Reading, Documentation and Reporting & Code Compliance and Inspection Procedures
Label the sheet types in a sample plan set (site plan, floor plans, reflected ceiling, elevations, sections, details, schedules) and state the information each sheet type normally carries
Trace three separate drawing callouts to their specification section and the governing code section
Extract the occupancy classification and construction type from a set of plan notes and record both on a review cover sheet
Convert three scaled dimensions from an architectural scale (e.g., 1/8 in = 1 ft) into actual feet and inches
Separate what is shown graphically from what is only stated in notes or schedules on the same sheet
Your checkpoint
A one-page plan-set index plus a callout-tracing log covering a complete sample plan set, self-checked against an answer key with every miss corrected.
Code Compliance and Inspection Procedures & Plan Reading, Documentation and Reporting
Compute occupant load for five rooms using the correct floor-area factors and the net-versus-gross distinction
Verify number of exits, egress width, and travel distance on a sample floor plan against code minimums
Diagram the full means-of-egress path (exit access, exit, exit discharge) on a marked-up floor plan
Detect three seeded plan-review deficiencies in a practice plan and write the code citation for each
Check door swing, hardware, and opening-protection requirements for four doors on the plan
Your checkpoint
A completed egress review worksheet for one sample floor plan with occupant loads, required versus provided exits, measured travel distances, and three written code citations.
Code Compliance and Inspection Procedures & Materials, Methods and Testing
Classify ten fire-resistance-rated assemblies by hourly rating and match each to its permitted use in a given occupancy
Sequence the inspection steps for a rated assembly from rough-in to final and name who verifies each step
Distinguish listed from non-listed materials and state the test documentation you would require for each
Identify the required separation between rated elements and the openings or penetrations that pass through them
Explain how a rating is compromised and what a plans examiner should reject at review
Your checkpoint
A rated-assembly matrix of ten assemblies, each with rating, code basis, verification method, and required supporting documentation.
Materials, Methods and Testing
Describe the standard test method, specimen, and acceptance criteria for concrete compressive strength, structural steel welding, and firestop penetration testing
Interpret a materials test report and mark each result pass or fail against the specified criteria
List the inspection hold points for three common building elements and state what must be visible at each
State what a special inspector must submit, to whom, and when, including the final report
Name the documentation that must exist before an element is covered or concealed
Your checkpoint
A two-page testing and inspection summary covering five test types, each with method, acceptance criteria, and reporting requirement.
Administration, Rules and Policies
Map the permit lifecycle from submittal through certificate of occupancy and name the decision point at each step
Distinguish the authority and duties of the code official, plans examiner, and field inspector under the administrative provisions
Outline the procedure for a modification request, an alternative-materials request, and a formal appeal
Apply recordkeeping, retention, and confidentiality rules to a sample case file
Identify the limits on a plans examiner's authority when a design professional disagrees with a comment
Your checkpoint
A one-page permit-process flowchart with the code basis and applicable timeframes annotated at every step.
Administration, Rules and Policies & Code Compliance and Inspection Procedures
Draft written plan-review comments that each cite the code section, state the deficiency, and specify the required correction
Script responses to three common applicant objections (alternate method, existing-building argument, phased permit)
Explain how code adoption, local amendments, and ordinances change what you actually enforce on a given project
Reconcile a conflict between a drawing detail and a specification section and decide which controls
Apply a citation/deficiency/correction rubric to your own written comments and score them
Your checkpoint
Five written plan-review comments in agency format, each scored against the citation/deficiency/correction rubric with revisions noted.
Plan Reading, Documentation and Reporting & Code Compliance and Inspection Procedures & Materials, Methods and Testing & Administration, Rules and Policies
Complete two timed 50-question practice sets under exam conditions with no notes
Tabulate every missed question by domain and by error type (knowledge gap, misread, calculation, time pressure)
Re-work the ten most frequently missed concepts directly from code text and record the exact section
Practice locating a cited section in the code book within 30 seconds
Adjust your pacing plan based on the per-question time recorded in both sets
Your checkpoint
An error log of every missed question listing domain, cause, and the code section that resolves it, plus a revised pacing plan.
Materials, Methods and Testing & Administration, Rules and Policies & Plan Reading, Documentation and Reporting & Code Compliance and Inspection Procedures
Re-drill the two lowest-scoring domains identified in the Week 7 error log
Recite from memory the plan-review workflow and the inspection sequence for a rated assembly
Complete one full-length timed simulation and review every miss before leaving the session
Condense all remaining weak points into a single sheet you will review the morning of the exam
Confirm exam-day logistics: allowed references, identification, and time allocation
Your checkpoint
A final scorecard showing domain-by-domain accuracy on the full-length simulation plus a one-page personal weak-spot sheet.
Milestones
Week 2: Complete one sample floor plan end-to-end (occupant load through egress discharge) with no more than two citation errors against the answer key.
Week 4: Score at least 75% on a 40-question mixed quiz covering Domains 1-3; log any domain below 70% for extra drills in Weeks 5-7.
Week 6: Submit five plan-review comments that each pass the citation/deficiency/correction rubric without a rewrite.
Week 8: Score at least 80% overall on the full-length timed simulation with no single domain below 70%.