ICC S1 Structural Steel and Bolting flashcards
ICC S1 Structural Steel and Bolting · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Special inspector authority
- The special inspector has authority to inspect all structural steel work, access fabrication and erection sites, and must report nonconforming work to the contractor and the building official.
- Approved plans requirement
- Work must conform to approved construction documents; any deviation requires approval of the building official and the registered design professional before the affected work proceeds.
- Preconstruction meeting purpose
- A meeting among contractor, fabricator, erector, inspector, and engineer of record held before steel work begins to establish inspection procedures, hold points, and reporting lines.
- Weld symbol elements
- An AWS A2.4 symbol conveys weld type, size, length, spacing, groove preparation, finish contour, all-around and field designations, and tail references such as process or specification.
- Standard hole size
- Standard holes are bolt diameter plus 1/16 in. for bolts 1 in. and smaller, and bolt diameter plus 1/8 in. for bolts larger than 1 in.
- Slip-critical connection callout
- Detailing that identifies slip-critical joints, the required faying-surface class, and hole type, because these govern surface preparation, pretensioning method, and bolting inspection.
- ASTM A992 properties
- A992 is the standard grade for rolled W-shapes, with minimum yield strength of 50 ksi, minimum tensile strength of 65 ksi, and maximum yield of 65 ksi for ductility.
- ASTM A36 properties
- A36 carbon steel has a minimum yield strength of 36 ksi and tensile strength from 58 to 80 ksi, commonly used for plates, angles, and miscellaneous members.
- Mill test report purpose
- Certified mill test reports record heat number, chemical composition, and mechanical properties, allowing the inspector to confirm delivered steel matches the specified ASTM designation.
- ASTM F3125 bolt grades
- F3125 consolidates the former A325 and A490 standards; Grade A325 has 120 ksi minimum tensile strength up to 1 in. diameter, and Grade A490 has 150 ksi.
- Punched hole limitation
- Full-size holes may be punched only in material 3/4 in. thick or less; thicker material must be drilled, or subpunched and reamed, per AISC 360.
- Piece mark function
- Each fabricated member receives a unique mark matching the shop and erection drawings so it can be identified, shipped, and erected in the correct location.
- Galvanizing vent and drain
- Galvanized members must be detailed with vent and drain holes so molten zinc can flow, and coating thickness per ASTM A123 increases with base metal thickness.
- Snug tight definition
- A condition where plies are in firm contact, produced by a few impacts of an impact wrench or the full effort of an ironworker on an ordinary spud wrench.
- Turn-of-nut rotation
- For bolt lengths up to four diameters, turn 1/3 turn for bolts 1 in. and smaller and 1/2 turn for larger bolts, measured from the snug-tight condition.
- DTI gap acceptance
- A direct tension indicator is properly tightened when the gap under the indicator is 0.005 in. or less, confirmed by refusal of a feeler gauge.
- Skidmore-Wilhelm device use
- A tension-calibrating device that measures actual bolt tension, used to verify turned-element and torque-wrench methods and confirm the pretension achieved.
- Minimum bolt pretension values
- Per AISC Table J3.1: 1/2-in. A325 is 12 kips, 3/4-in. is 28 kips, 7/8-in. is 39 kips, and 1-in. is 51 kips; A490 values are higher.
- WPS and PQR relationship
- The WPS states the welding variables used in production and must be supported by a PQR documenting mechanical test results of a coupon welded with those same variables.
- Welder qualification continuity
- A welder's performance qualification lapses after six months without welding with that process, and requalification is required before production welding resumes.
- Low-hydrogen electrode storage
- E7018 electrodes must be stored in heated holding ovens and kept in portable rod ovens in the field to prevent moisture absorption and hydrogen cracking.
- Fillet weld gauge use
- A gauge used to measure the leg size and throat thickness of a completed fillet weld to verify conformance with the size shown on the drawings.
- Column plumbing tolerance
- Per the AISC Code of Standard Practice, individual columns must be plumb within 1:500 of their height, measured between working points during erection.
- Temporary bracing responsibility
- The erector is responsible for providing temporary guying, bracing, and shoring needed to keep the partially completed structure stable until permanent connections are finished.
- Drift pin use
- Steel pins used to align bolt holes during fit-up; they may bring members into alignment but may not be used to enlarge or distort holes.
- Quality control versus assurance
- Quality control is the fabricator's or erector's own inspection of its work; quality assurance is independent verification that the required quality control is being performed and effective.
- Coating thickness verification
- Dry film thickness is measured with a magnetic gauge following SSPC-PA 2 procedures, averaging readings over defined areas and comparing them to the specified thickness.
- Faying surface classes
- Class A faying surfaces have a mean slip coefficient of 0.33; Class B surfaces, such as blast-cleaned steel, have a mean slip coefficient of 0.50.
- IBC structural steel inspection
- IBC Section 1705.2 requires special inspection of structural steel, covering welding and bolt installation and verification that member sizes and connections match approved drawings.
- Continuous versus periodic inspection
- Continuous inspection requires the inspector to be present at all times work is in progress; periodic inspection requires presence only at specified intervals or hold points.
- Nonconformance report content
- A written record of a deviation from approved documents stating its location, description, disposition, required corrective action, and sign-off when the item is closed.
- Final inspection report
- The special inspector's closing report to the building official summarizing inspections performed, tests conducted, discrepancies found, and how each discrepancy was resolved.