ICC S1 Structural Steel and Bolting key terms
ICC S1 Structural Steel and Bolting · Get comfortable with the vocabulary.
- Approved Construction Documents
- Related: Deferred Submittal, Referenced Standard
Drawings and specifications that the building official has reviewed and released for construction. Work must follow them, and any field change needs documented approval before it is built.
- Deferred Submittal
- Related: Approved Construction Documents, Shop Drawing
A portion of the design, such as connection details or pre-engineered components, identified in the permit documents for separate approval after the permit is issued but before that work is installed.
- Referenced Standard
- Related: Approved Construction Documents
A published document, such as AISC 360 or the RCSC Specification, that the building code adopts by citation, making its requirements enforceable for the scope the code states.
- Request for Information
- Related: Shop Drawing, Approved Construction Documents
A written question sent to the designer asking for clarification of drawings or specifications. The answer becomes part of the contract documents and should be logged and shared with affected parties.
- Shop Drawing
- Related: Erection Drawing, Request for Information, Weld Symbol
Fabricator-prepared detail drawings showing member sizes, piece marks, connection geometry, bolt and weld details, and dimensions used to build the work; they are reviewed against the design before fabrication begins.
- Erection Drawing
- Related: Shop Drawing, Temporary Bracing
Plans and elevations prepared for field use showing piece marks, connection locations, erection sequence, and temporary bracing needs so the erector can plan lifts and maintain stability.
- Weld Symbol
- Related: Shop Drawing, Fillet Weld
A standard drawing notation placed on a reference line with an arrow that states weld type, size, length, spacing, and location, and may add process or finish requirements.
- Mill Test Report
- Related: ASTM A992, Yield Stress
A producer's certified record of the chemical analysis and mechanical test results for a heat or lot of steel, used to confirm the material meets the specified ASTM standard.
- ASTM A992
- Related: Mill Test Report, Yield Stress, Carbon Equivalent
The preferred specification for rolled structural wide-flange shapes, requiring 50 ksi minimum yield, 65 ksi minimum tensile strength, and a yield-to-tensile ratio no greater than 0.85.
- Yield Stress
- Related: ASTM A992, Mill Test Report
The stress at which steel stops behaving elastically and begins permanent deformation; for steel without a distinct yield plateau it is found by the 0.2 percent offset method.
- Charpy V-Notch Toughness
- Related: ASTM A992, Heat Input
The impact energy a notched specimen absorbs when struck at a stated temperature, used to specify notch-tough steel where brittle fracture, seismic yielding, or cold service is a concern.
- Carbon Equivalent
- Related: ASTM A992, Heat Input, Prequalified Joint
A number calculated from carbon and other alloying elements that estimates how readily a steel will crack during welding; higher values call for preheat or specially qualified procedures.
- Camber
- Related: Fabrication Tolerance, Shop Drawing
Deliberate curvature built into a beam or girder to offset expected dead-load deflection. It is shown on drawings and checked against permitted fabrication deviation from the theoretical curve.
- Fabrication Tolerance
- Related: Camber, Trial Assembly
The permitted dimensional variation in shop work, covering member length, straightness, hole location, and camber, as defined in AISC 303; exceeding it requires evaluation before acceptance.
- Trial Assembly
- Related: Fabrication Tolerance, Shop Drawing
A shop fit-up of mating members to confirm holes align and geometry closes before shipping, usually required where the specification calls for it on complex or heavily stressed connections.
- High-Strength Structural Bolt
- Related: Pretensioned Connection, Snug-Tight, Skidmore-Wilhelm Calibrator
A bolt made to ASTM F3125 in grades that include the former A325 and A490, supplied with a matched nut and washer and installed to develop the clamping force the design requires.
- Snug-Tight
- Related: Pretensioned Connection, Turn-of-Nut Method
The condition where connected plies are brought into firm contact by a few impacts of an impact wrench or the full effort of an ironworker with an ordinary spud wrench; no tension is specified.
- Pretensioned Connection
- Related: Turn-of-Nut Method, Direct Tension Indicator, Slip-Critical Connection
A joint in which bolts are installed to a required minimum tension so the clamped plies resist load by friction at service level; the tightening is verified by a specified method.
- Turn-of-Nut Method
- Related: Pretensioned Connection, Direct Tension Indicator
Pretensioning by turning the nut or bolt head a specified fraction of a turn beyond snug-tight, with the amount depending on bolt length and whether the bolt is held from rotating.
- Direct Tension Indicator
- Related: Pretensioned Connection, Turn-of-Nut Method
A hardened washer with raised bumps that flatten as the bolt is tensioned. A feeler gauge checks the remaining gap, and the specified gap closure confirms the required tension is reached.
- Skidmore-Wilhelm Calibrator
- Related: Pretensioned Connection, High-Strength Structural Bolt
A hydraulic device that measures the tension a bolt actually develops when tightened, used for pre-installation verification and for calibrating installation tools on the project site.
- Faying Surface
- Related: Slip-Critical Connection, Pretensioned Connection
The contact face between plies in a bolted joint. In slip-critical connections it must be free of oil, paint, and loose scale as specified so the required slip resistance is achieved.
- Slip-Critical Connection
- Related: Faying Surface, Pretensioned Connection
A bolted joint proportioned so that no slip occurs between plies at service loads, achieved with pretensioned bolts and faying surfaces prepared to give a stated slip coefficient.
- Welding Procedure Specification
- Related: Procedure Qualification Record, Prequalified Joint
A written document listing the essential variables for a production weld, including process, filler metal, current range, preheat, and technique, so welds of consistent quality are produced.
- Procedure Qualification Record
- Related: Welding Procedure Specification, Prequalified Joint
The documented record of the test weld made to support a welding procedure specification, showing the variables used and mechanical test results that demonstrate acceptable weld properties.
- Prequalified Joint
- Related: Welding Procedure Specification, Complete Joint Penetration Weld
A joint detail listed in AISC 360 Chapter J that may be used without procedure qualification when the welding procedure stays within the essential variable limits the code states.
- Complete Joint Penetration Weld
- Related: Prequalified Joint, Ultrasonic Testing, Fillet Weld
A groove weld in which sound weld metal extends through the full thickness of the joined parts, developing base metal strength and usually requiring detailed edge preparation and nondestructive testing.
- Fillet Weld
- Related: Weld Symbol, Complete Joint Penetration Weld
A roughly triangular weld joining two surfaces that meet at an angle, sized by its leg, with strength calculated on the throat area resisting shear across the weld.
- Heat Input
- Related: Welding Procedure Specification, Charpy V-Notch Toughness
Energy delivered per unit length of weld, calculated from current, voltage, and travel speed; it controls cooling rate and therefore toughness, distortion, and preheat requirements.
- Ultrasonic Testing
- Related: Complete Joint Penetration Weld, Acceptance Criteria
A volumetric nondestructive method that sends high-frequency sound through a weld to find internal discontinuities such as lack of fusion, cracks, or slag, judged against stated acceptance limits.
- Anchor Rod
- Related: Plumbness, Shop Drawing
A threaded steel rod cast in or post-installed into concrete that ties a column base plate to the foundation and carries uplift, shear, and bending into the concrete.
- Plumbness
- Related: Temporary Bracing, Erection Drawing
The verticality of erected columns and frames measured against a true vertical line. Erection tolerances cap how far out of plumb a member may be before correction is required.
- Temporary Bracing
- Related: Erection Drawing, Plumbness
Guys, cables, or temporary members that hold a partly erected frame stable until enough permanent connections and framing exist to resist all loads, including wind.
- Shear Stud
- Related: Welding Procedure Specification, Special Inspection
A headed steel stud welded through the deck to a beam to create composite action with the concrete slab; it is installed and tested under a qualified stud welding procedure.
- Acceptance Criteria
- Related: Ultrasonic Testing, Nonconformance Report
The limits in the governing code that decide whether an observed discontinuity must be rejected, commonly stated as maximum sizes for porosity, undercut, or lack of fusion.
- Nonconformance Report
- Related: Acceptance Criteria, Final Report
A written record describing work that does not meet the contract documents, the disposition chosen, and the corrective action taken, kept open until the item is resolved.
- Statement of Special Inspections
- Related: Special Inspection, Final Report
A document prepared by the registered design professional that lists each special inspection and test, its frequency, and the responsible party, filed with the permit application.
- Special Inspection
- Related: Statement of Special Inspections, Final Report
Inspection and testing of designated structural work by an approved agency independent of the contractor, required by the code where failure would endanger life or public safety.
- Final Report
- Related: Statement of Special Inspections, Nonconformance Report
The inspection agency's closing summary of the special inspections and tests performed, listing nonconformances and how they were resolved, submitted to the building official at project completion.