ICDL Project Planning (ICDL) flashcards
ICDL Project Planning · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Project
- A temporary endeavor with a defined start and end, undertaken to create a unique product, service or result, constrained by scope, time, cost and quality.
- Triple constraint
- The interdependent relationship among scope, time and cost, usually with quality at the centre: changing any one constraint normally requires adjusting at least one of the others.
- Project life cycle
- The sequence of phases a project passes through from initiation to closure, such as define, plan, execute and close, each typically ending in a review or gate.
- Project charter
- A document that formally authorizes the project, names the project manager, and records objectives, high-level scope, budget, milestones, constraints and the sponsoring authority.
- Progressive elaboration
- The ongoing refinement of project plans, scope and estimates as more accurate information becomes available; detail is developed in waves rather than fixed at the start.
- Phase gate
- A formal review at the end of a phase where governance decides to continue, revise or terminate the project; money already spent is not a valid reason to continue.
- Work breakdown structure
- A deliverable-oriented hierarchical decomposition of total project scope; its lowest elements are work packages that can be estimated, scheduled, assigned and controlled.
- Work package
- The lowest level of the work breakdown structure, scoped small enough to estimate cost and duration reliably, commonly sized at roughly eight to eighty hours of effort.
- 100 percent rule
- The rule that a work breakdown structure must include all project scope and nothing extra: the child elements of every node sum exactly to the parent's scope.
- Scope statement
- A document describing product and project scope, deliverables, acceptance criteria, exclusions, assumptions and constraints; it becomes the baseline for controlling scope changes.
- Stakeholder power-interest grid
- A classification of stakeholders by influence and interest; high power and high interest are managed closely, while low power and low interest need only monitoring.
- RACI matrix
- A responsibility assignment chart giving each activity exactly one Accountable owner and marking others as Responsible for doing work, Consulted two-way, or Informed one-way.
- Precedence diagramming method
- A scheduling technique that draws activities as nodes connected by arrows representing finish-to-start, start-to-start, finish-to-finish or start-to-finish logical relationships.
- Finish-to-start dependency
- A relationship in which the successor activity cannot begin until the predecessor has finished; it is the most common dependency type found in project networks.
- Lead and lag
- Adjustments applied to dependencies: lag inserts waiting time between predecessor and successor, while lead allows overlap by starting the successor before the predecessor finishes.
- Critical path
- The longest sequence of dependent activities through the network, which sets the shortest possible project duration; activities on it have zero total float.
- Total float
- The time an activity can be delayed without delaying the project completion date, calculated as late start minus early start or late finish minus early finish.
- Crashing
- A schedule compression technique that adds resources, overtime or cost to critical-path activities to shorten duration, usually reducing quality or increasing risk.
- Resource leveling
- Rescheduling activities to resolve resource over-allocation or conflicts within set limits; it frequently extends the project duration and can change the critical path.
- Analogous estimating
- A top-down technique that estimates using actual data from a similar past project; it is quick and inexpensive but less accurate than detailed estimating methods.
- Parametric estimating
- Estimating by multiplying a unit rate by a quantity, such as cost per square metre or hours per unit, producing scalable and statistically based results.
- Three-point estimating
- An uncertainty-aware method using optimistic, most likely and pessimistic values; the PERT expected value equals O plus four times M plus P, divided by six.
- Contingency reserve
- Budget set aside for identified risks, the known unknowns; it is included in the approved cost baseline and is controlled by the project manager.
- Management reserve
- Budget held for unidentified risks, the unknown unknowns; it sits outside the cost baseline and can only be released by senior management or the sponsor.
- Risk register
- A living log recording each risk's identifier, description, cause, probability, impact, score, owner, response strategy, trigger and current status.
- Expected monetary value
- The probability of a risk multiplied by its monetary impact; summed across all identified risks it gives a quantified basis for the contingency budget.
- Earned value management
- A performance measurement method integrating scope, schedule and cost by comparing planned value, earned value and actual cost at a given status date.
- Schedule variance
- SV equals EV minus PV; a negative result shows the work completed is behind the planned schedule, while a positive result shows it is ahead.
- Cost performance index
- CPI equals EV divided by AC; a value below one means more money was spent than value earned, while a value above one indicates cost efficiency.
- Estimate at completion
- The forecast total cost of the project; commonly EAC equals BAC divided by CPI when current cost performance is expected to continue until the end.
- Change control board
- A formal group that reviews change requests, assesses their impact on scope, schedule, cost and risk, and then approves, rejects or defers them.
- Lessons learned
- Knowledge captured during and after the project about what worked and what did not, stored for reuse so that later projects avoid repeating mistakes.