ICDL Project Planning study materials
ICDL Project Planning study resources

ICDL Project Planning (ICDL) study plan

ICDL Project Planning · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Project planning fundamentals and the project life cycle & Scheduling, activities, dependencies and resource allocation

  • Map each of the five process groups to a phase of the project life cycle and name the decision gate that closes each phase

  • Distinguish project, program and portfolio work by writing three original examples of each and stating the boundary test used

  • Decompose a small sample project (office relocation) into 15 activities and draw them as a precedence diagram

  • Label all four dependency types (finish-to-start, start-to-start, finish-to-finish, start-to-finish) on that diagram and justify the two leads or lags you introduce

Your checkpoint

One-page life-cycle map plus a 15-activity precedence diagram with all four dependency types labelled and a 150-word written justification of the leads and lags used

Week 2

Scheduling, activities, dependencies and resource allocation

  • Perform forward and backward passes on the 15-activity network to derive early and late start and finish dates for every activity

  • Identify the critical path and compute both total float and free float for each activity

  • Compress the schedule by three days using crashing and fast-tracking, recording the cost or risk trade-off for each option considered

  • Level the resource histogram so two over-allocated roles sit within their stated capacity

Your checkpoint

Solved network schedule showing the critical path, a complete float table for all 15 activities, and a before-and-after resource histogram that keeps both roles within capacity

Week 3

Cost estimation, budgeting and risk planning

  • Apply analogous, parametric, bottom-up and three-point estimating to the same work package and tabulate how far the four results diverge

  • Calculate a PERT weighted estimate and state the conditions under which it beats a simple average

  • Build a time-phased cost baseline that keeps a 10% contingency reserve separate from management reserve

  • Plot a cumulative S-curve and mark the funding limit and the point at which the reserve is released

Your checkpoint

Cost estimate workbook containing four estimating methods for one work package, a worked PERT calculation, and a cumulative S-curve budget baseline with contingency shown as its own line

Week 4

Cost estimation, budgeting and risk planning

  • Score ten project risks on probability and impact with a 5x5 matrix and rank them by exposure

  • Compute expected monetary value for each risk and derive the total contingency reserve the scores imply

  • Select a response strategy (avoid, mitigate, transfer, accept, escalate) for every risk and assign an owner and a trigger condition

  • Separate risks from issues and describe the escalation path each follows

Your checkpoint

Risk register of ten risks with 5x5 scores, EMV calculations, owners, triggers and response strategies, plus a one-page summary of the total contingency reserve

Week 5

Scope definition, deliverables and stakeholder analysis

  • Write a scope statement covering in-scope work, explicit exclusions, assumptions, constraints and acceptance criteria

  • Build a three-level work breakdown structure that passes the 100% rule and assign an accountable owner to each work package

  • Analyse twelve stakeholders on a power/interest grid and plan a distinct engagement approach for each quadrant

  • Define three measurable acceptance criteria and name the verification method for each

Your checkpoint

Scope statement, three-level work breakdown structure with a dictionary entry for each lowest-level package, and a stakeholder register of twelve people with power/interest ratings and engagement actions

Week 6

Monitoring, progress reporting and project closure

  • Compute planned value, earned value, actual cost, schedule variance, cost variance, SPI and CPI from a six-period dataset

  • Interpret each index in plain language and forecast estimate at completion using two different formulas

  • Set variance thresholds that trigger escalation and draft the matching change request for one breach

  • Produce a one-page status report with a RAG rating and a forecast-to-complete statement

Your checkpoint

Earned value dashboard covering six periods with all seven metrics, two estimate-at-completion forecasts, RAG status and a 200-word variance analysis memo

Week 7

Monitoring, progress reporting and project closure & Project planning fundamentals and the project life cycle

  • Run a stage-gate review and record formal acceptance sign-off against each deliverable

  • Write a closure checklist covering contract close, resource release, records archive and handover

  • Facilitate a lessons-learned session and convert three findings into specific process changes with owners

  • Re-test domain 1 concepts (life cycle, roles, governance) and correct the errors carried over from week 1

Your checkpoint

Closure pack containing a signed acceptance log, a completed closure checklist, a lessons-learned register with three process improvements, and a corrected life-cycle map

Week 8

Scope definition, deliverables and stakeholder analysis & Scheduling, activities, dependencies and resource allocation & Cost estimation, budgeting and risk planning & Monitoring, progress reporting and project closure

  • Complete two full-length timed mock exams under exam conditions without notes

  • Log every incorrect answer with the underlying concept and a one-line correction rule

  • Re-study the three weakest areas named by the error log, rebuilding one worked example for each

  • Recite the PERT, EMV, float and earned value formulas from memory and check them against a reference

Your checkpoint

Error log of all missed items with correction rules, plus a one-page formula sheet written from memory and a second mock exam score of at least 80%

Milestones

Week 2: Closed-book: derive the critical path and full float table for a 12-activity network in under 40 minutes with no arithmetic errors, scoring at least 85% on a self-marked check

Week 4: Closed-book: produce a time-phased cost baseline with contingency plus a ten-risk register with EMV totals in a single 60-minute sitting, scoring at least 80% on a self-marked check

Week 6: Closed-book: calculate all seven earned value metrics and both completion forecasts from a raw dataset within 30 minutes, then correctly explain any variance above 10%

Week 8: Second full-length mock exam completed within the time limit at 80% or higher, with every remaining error logged and assigned a correction rule