The Facility Management Professional (FMP) is one of three credentials listed on the International Facility Management Association (IFMA) website, alongside the Sustainability Facility Professional (SFP) and the Certified Facility Manager (CFM). IFMA describes itself as "the world's largest and most widely recognized international association for facility management professionals." The FMP is generally positioned as an earlier-career or foundational credential for people who run, coordinate, or support facility operations - including facility coordinators, property and workplace administrators, and specialists moving into FM from adjacent roles such as administration, engineering, or real estate. The FMP case studies are 5 cases and about 3,659 words.
1AHU-3 Bearing Distress in a Leased Laboratory Building
You are the facility manager for a 12-story, 310,000 sq ft multi-tenant office and laboratory building. AHU-3 serves floors 9–10, including a tenant laboratory whose lease requires 99.5% HVAC uptime and imposes a 2,500-per-day service credit for missed targets.
796 words, about 4 min2Fit-Out Schedule Compression with a 22-Week Switchgear Lead Time
You are the owner’s project manager for a 48,000 sq ft tenant fit-out in a leased building. The baseline schedule is 16 weeks; the tenant’s lease commencement is in 20 weeks, and the lease imposes a 6,000-per-day holdover penalty after that date.
713 words, about 4 min3LED Retrofit and EMS Upgrade Against a Three-Year Payback Hurdle
You manage a 420,000 sq ft, three-building office portfolio. Electricity use is 4.2 million kWh per year at an average 0.11/kWh.
726 words, about 4 min4CMMS Adoption Resistance After Merging Two Facility Teams
Two organizations merge their facility teams into one 180-person department. You lead the combined team.
700 words, about 4 min5Standby Generator and ATS Failure During a Research Outage
You manage a 650,000 sq ft research campus with a 650 kW diesel standby generator that serves life-safety, animal-care, and freezer loads. During a four-hour utility outage, the generator started but the automatic transfer switch did not transfer one of the two main distribution panels.
724 words, about 4 min