Availability formula
Availability equals MTBF divided by the sum of MTBF and MTTR. It is the fraction of time an asset is capable of performing its function when demanded.
OEE components
Overall equipment effectiveness multiplies availability, performance, and quality. Availability compares run time to planned production time; performance compares actual output rate to ideal cycle rate.
Predictive maintenance trigger
Predictive maintenance is triggered by measured condition such as vibration signature, oil particle count, thermography, or ultrasound, rather than by calendar time or run hours.
RCM default decision
Reliability-centered maintenance defaults to run-to-failure when a failure mode has no safety, environmental, or economic consequence and no cost-effective task exists to prevent it.
Bathtub curve phases
Failure rate over asset life shows three phases: infant mortality with decreasing rate, useful life with roughly constant rate, and wear-out with increasing rate. Maintenance tactics differ by phase.
Criticality ranking use
Assets ranked by consequence and likelihood of failure receive matched tactics: high-criticality assets get condition monitoring and redundancy, low-criticality assets may run to failure.
Backlog in craft-weeks
Ready work-order backlog measured in craft-weeks divided by weekly craft capacity gives weeks of backlog. Roughly two to four weeks is a common planning target band.
TPM autonomous maintenance
Total productive maintenance assigns operators basic cleaning, lubrication, inspection, and minor adjustment of their own equipment, freeing maintenance craft for higher-skill planned and predictive work.
Critical path definition
The critical path is the longest path through the project network. It determines project duration and consists of activities with zero total float.
Total float formula
Total float equals late start minus early start, or late finish minus early finish. Free float equals the successor's early start minus the current activity's early finish.
Crashing versus fast-tracking
Crashing adds resources to critical-path activities to shorten duration and raises cost. Fast-tracking overlaps sequential activities and raises rework and coordination risk instead.
Cost performance index
CPI equals earned value divided by actual cost. A value below 1.0 means the project is spending more than the work earned, and EAC equals BAC divided by CPI if efficiency persists.
Schedule performance index
SPI equals earned value divided by planned value. A value below 1.0 means less work was completed than planned for the period, though SPI always returns to 1.0 at completion.
Estimate at completion variants
EAC equals BAC divided by CPI when current efficiency continues, or actual cost plus remaining budget when remaining work proceeds at the planned rate.
TCPI interpretation
To-complete performance index equals remaining budget divided by remaining funds. A value above 1.0 means the remaining work must be performed more efficiently than the plan assumed.
Contingency versus management reserve
Contingency reserve covers identified risks and is part of the cost baseline. Management reserve covers unidentified scope and sits above the baseline, requiring sponsor approval to release.
RACI accountability rule
In a RACI chart each deliverable has exactly one accountable person. Responsibility may be shared among doers, but shared accountability produces unclear ownership and stalled decisions.
Net present value rule
NPV discounts all project cash flows at the hurdle rate and subtracts the initial outlay. Accept independent projects with positive NPV and rank mutually exclusive projects by highest NPV.
IRR decision rule
Internal rate of return is the discount rate making NPV zero. Accept when IRR exceeds the hurdle rate, but prefer NPV for mutually exclusive projects or non-conventional cash flows.
WACC formula
Weighted average cost of capital equals equity weight times cost of equity plus debt weight times cost of debt times one minus the tax rate.
Break-even quantity
Break-even quantity equals fixed costs divided by price minus variable cost per unit. The denominator is the contribution margin each unit adds toward covering fixed costs.
Contribution margin ratio
Contribution margin ratio equals price minus variable cost per unit, divided by price. It shows the share of each sales dollar available to cover fixed costs and profit.
Straight-line depreciation
Straight-line depreciation equals cost minus salvage value, divided by useful life. It spreads the depreciable base evenly and produces lower early cash flow than accelerated methods.
Quick ratio meaning
Quick ratio equals current assets minus inventory, divided by current liabilities. Excluding inventory makes it a stricter liquidity test than the current ratio.
Sunk cost exclusion
Sunk costs are already incurred and cannot be recovered, so they are excluded from decisions. Only incremental cash flows and opportunity costs belong in the comparison.
Situational leadership styles
Style follows follower readiness: directing for low competence and commitment, coaching for low competence with some commitment, supporting for capable but variable commitment, delegating for high competence and commitment.
Tuckman team stages
Teams pass through forming, storming, norming, performing, and adjourning. Conflict peaks during storming, and leader intervention shifts from direction toward facilitation as the team matures.
Herzberg two factors
Hygiene factors such as pay, policy, and working conditions prevent dissatisfaction but do not motivate. Motivators such as achievement, recognition, and growth create satisfaction and engagement.
Porter generic strategies
Michael Porter's generic strategies are cost leadership, differentiation, and focus. Firms without a clear advantage risk being stuck in the middle with eroding margins.
Lewin change model
Kurt Lewin's model has three stages: unfreeze existing behavior, introduce the change, then refreeze so the new behavior becomes the norm.
Thomas-Kilmann conflict modes
Five conflict modes are competing, collaborating, compromising, avoiding, and accommodating. Collaborating suits high-stakes issues with time and trust; avoiding suits trivial issues or cooling-off periods.