Quick reference

Operations and Maintenance

  • Availability = MTBF / (MTBF + MTTR); raising MTBF or cutting MTTR both raise availability, but MTTR reductions usually cost less.

  • Reliability R(t) = e^(-t/MTBF) assumes a constant failure rate; it applies to the useful-life portion of the bathtub curve, not to infant-mortality or wear-out phases.

  • OEE = Availability x Performance x Quality. Availability = run time / planned production time; Performance = (ideal cycle time x total count) / run time; Quality = good count / total count.

  • Planned preventive maintenance is time- or usage-triggered; predictive (condition-based) maintenance is triggered by measured condition such as vibration, thermography, oil analysis, or ultrasound.

  • RCM decision logic asks: what is the function, what causes functional failure, what does failure look like, what does it matter, and what task is worth doing. Default to run-to-failure when failure has no safety, environmental, or economic consequence.

  • TPM pillars include autonomous maintenance by operators, planned maintenance, quality maintenance, focused improvement, and early equipment management; overall goal is zero unplanned downtime.

  • Criticality ranking (consequence x likelihood) sets PM frequency and spares strategy; A-critical assets get condition monitoring and redundant spares, C-critical assets get run-to-failure.

  • Spare-parts stocking rule: stock when failure consequence is high and lead time exceeds tolerable downtime; use insurance spares for long-lead, low-demand, high-impact items.

  • Work-order backlog in craft-weeks divided by weekly craft capacity gives weeks of backlog; a common planning target band is roughly 2-4 weeks of ready backlog.

Quick reference

Project Management

  • Critical path = longest path through the network; it sets project duration and has zero total float. A path with float greater than zero is not critical.

  • Total float = LS - ES = LF - EF. Free float = ES of successor - EF of current activity; free float can never exceed total float.

  • Crashing shortens duration by adding resources to critical-path activities; fast-tracking overlaps activities that were sequential. Crashing raises cost per unit of time saved; fast-tracking raises rework risk.

  • Earned value: CV = EV - AC; SV = EV - PV; CPI = EV / AC; SPI = EV / PV. Negative CV or CPI below 1.0 means over budget.

  • Forecasts: EAC = BAC / CPI when current cost efficiency persists; EAC = AC + (BAC - EV) when remaining work is expected at budgeted rate; EAC = AC + ETC when a fresh bottom-up estimate exists.

  • TCPI = (BAC - EV) / (BAC - AC) for the budget target, or (BAC - EV) / (EAC - AC) for the forecast target. TCPI above 1.0 means remaining work must be more efficient than plan.

  • Risk response types: avoid, transfer, mitigate, accept for threats; exploit, share, enhance, accept for opportunities. Contingency reserves cover identified risks; management reserves cover unidentified scope.

  • Scope change control: any change to scope, schedule, or cost passes through integrated change control, with impact assessed on the baseline before approval.

  • RACI rule: exactly one accountable person per deliverable; responsibility can be shared, accountability cannot. Too many consulted parties slows decisions.

Quick reference

Finance and Business

  • Net present value = sum of cash flow_t / (1 + r)^t minus initial outlay. Accept independent projects with NPV greater than zero; rank mutually exclusive projects by highest NPV.

  • IRR is the discount rate that makes NPV zero. Accept when IRR exceeds the hurdle rate; IRR can mislead on mutually exclusive or non-conventional cash-flow projects, so use NPV as the decision rule.

  • Payback period ignores cash flows after the cutoff and the time value of time; use it as a liquidity screen alongside NPV, not as the sole criterion.

  • WACC = (E/V) x Re + (D/V) x Rd x (1 - tax rate). Because interest is tax-deductible, the after-tax cost of debt is Rd x (1 - t).

  • Break-even quantity = fixed costs / (price - variable cost per unit). Contribution margin per unit is price minus variable cost; contribution margin ratio is that divided by price.

  • Straight-line depreciation = (cost - salvage) / useful life. MACRS accelerated depreciation front-loads deductions, raising early cash flow and NPV versus straight-line.

  • Current ratio = current assets / current liabilities; quick ratio excludes inventory. A current ratio below 1.0 signals reliance on near-term financing.

  • Return on investment = net benefit / cost. When comparing options, incremental analysis compares only the differences in cost and benefit between alternatives.

  • Sunk costs are excluded from decisions; opportunity cost and incremental cash flow are included. Allocate only avoidable overhead to a decision.

Quick reference

Leadership and Strategy

  • Situational leadership matches style to follower readiness: directing for low competence and low commitment, coaching for low competence and some commitment, supporting for capable but variable commitment, delegating for high competence and high commitment.

  • Tuckman stages are forming, storming, norming, performing, and adjourning; conflict peaks in storming, and interventions should shift from direction to facilitation as the team matures.

  • Maslow orders needs physiological, safety, social, esteem, self-actualization; Herzberg separates hygiene factors (pay, policy, conditions) that prevent dissatisfaction from motivators (achievement, recognition, growth) that create satisfaction.

  • SMART goals are specific, measurable, achievable, relevant, and time-bound; without a measure and a deadline a goal cannot be tracked.

  • Porter's generic strategies are cost leadership, differentiation, and focus; being stuck in the middle without a clear advantage erodes margin.

  • SWOT pairs internal strengths and weaknesses with external opportunities and threats; SO strategies use strengths on opportunities, WT strategies defend against threats.

  • Lewin change model: unfreeze, change, refreeze. Kotter's eight steps begin with urgency and coalition and end with anchoring changes in culture.

  • Conflict modes per Thomas-Kilmann: competing, collaborating, compromising, avoiding, accommodating. Collaborating suits high-stakes issues with time and trust; avoiding suits trivial issues or cooling-off.

  • Delegation requires clear outcome, authority, resources, and a check-in point; accountability for the result remains with the delegator.