Electrical Fundamentals
Ohm's law: V = I × R; power P = V × I = I²R = V²/R.
Series: R_total = R1 + R2 + …; same current through all elements; voltages add.
Parallel: 1/R_total = 1/R1 + 1/R2 + …; same voltage across all; currents add.
Two resistors in parallel: R = (R1 × R2)/(R1 + R2).
Energy: W (Wh) = P (W) × t (h); 1 kWh = 3.6 × 10⁶ J.
Conductor resistance R = ρL/A; ρ(copper) ≈ 1.72 × 10⁻⁸ Ω·m at 20 °C.
Temperature coefficient of copper ≈ +0.00393 per °C; resistance rises with temperature.
Coulomb: 1 C = 1 A × 1 s; charge Q = I × t.
DC/AC Circuits and Measuring Instruments
RMS = peak/√2 for a sine wave; average of a full sine cycle = 0; average of half cycle = 0.637 × peak.
Frequency f = 1/T; Indian grid supply is 230 V RMS, 50 Hz, single phase.
Inductive reactance X_L = 2πfL; capacitive reactance X_C = 1/(2πfC).
Impedance Z = √(R² + (X_L − X_C)²); power factor = cos φ = R/Z.
Real power P = V I cos φ; reactive power Q = V I sin φ (var); apparent power S = V I (VA).
Ammeter connects in series, voltmeter in parallel; an ideal ammeter has zero resistance, ideal voltmeter infinite resistance.
Clamp meter measures current via magnetic field without breaking the circuit; works on AC and, with Hall sensor, DC.
Megohmmeter (insulation tester) applies 500 V DC to measure insulation resistance in MΩ; multiplier reading × range.
Basic Electronics
Diode: forward biased when anode > cathode by ≈0.7 V (Si) or 0.3 V (Ge); reverse biased blocks current.
Zener diode operates in reverse breakdown to regulate voltage; series resistor limits current.
Half-wave rectifier: output ripple frequency = supply frequency; full-wave = 2 × supply frequency.
Bridge rectifier uses 4 diodes; each pair conducts on alternate half cycles; output ≈ 0.9 × V_rms (unfiltered).
Filter capacitor reduces ripple; larger C or larger load resistance lowers ripple.
BJT: NPN conducts when base-emitter forward biased; β = I_C/I_B; used as switch or amplifier.
MOSFET is voltage-controlled; low gate current; common in MPPT and inverter switching stages.
Logic gates: AND (all 1s), OR (any 1), NOT (invert), NAND and NOR are universal gates.
Semiconductor Devices and Power Electronics
SCR (thyristor) latches on when gate pulse arrives and anode is forward biased; turns off only when current falls below holding current.
TRIAC is a bidirectional thyristor used for AC phase control; two SCRs back-to-back in behaviour.
IGBT combines MOSFET gate with BJT conduction; standard switch in grid-tied PV inverters.
Diode forward drop ≈ 0.7–1.0 V; conduction loss = V_f × I_avg.
Bypass diode across a module sub-string limits hotspot losses when shaded; blocking diode prevents reverse current at night.
PWM switching controls average output voltage: V_avg = D × V_dc, where D is duty cycle.
Boost converter steps voltage up: V_out = V_in/(1 − D); buck steps down: V_out = D × V_in.
Heat sink and thermal resistance θ (K/W) determine junction temperature: T_j = T_a + P × θ_total.
Electrical Wiring, Installation, Protection and Earthing
Indian cable sizes: 1, 1.5, 2.5, 4, 6, 10, 16, 25, 35 mm²; current capacity rises with cross-section.
Voltage drop limit for wiring design: typically ≤ 3 % for a PV feeder, ≤ 5 % overall.
MCB trips on overload (thermal) and short circuit (magnetic); rated breaking capacity in kA.
RCCB/ELCB (30 mA) protects people against earth leakage; does not replace MCB for overload.
Fuse rating must be ≥ design current and below cable current-carrying capacity.
Earthing: earth continuity conductor resistance to earth should be low (commonly ≤ 1 Ω for grid substations; ≤ 5 Ω for small installations).
DC side of a PV array requires DC-rated isolators, fuses and MCBs - AC devices must not be used on DC.
Cable derating factors apply for ambient temperature, grouping, and conduit/enclosure installation.
Solar Photovoltaic Fundamentals
Standard Test Conditions (STC): 1000 W/m² irradiance, 25 °C cell temperature, AM 1.5 spectrum.
Irradiance is measured in W/m²; energy in kWh/m²/day (peak sun hours).
Open-circuit voltage V_oc falls ≈ 0.3 %/°C as cell temperature rises; I_sc rises slightly with temperature.
Fill factor FF = (V_mp × I_mp)/(V_oc × I_sc); typical crystalline Si FF is 0.70–0.80.
Efficiency η = P_max/(irradiance × area).
Air mass AM 1.5 is the reference spectrum; AM 1 is overhead sun.
Albedo and tilt affect plane-of-array irradiance; optimum tilt in India is roughly latitude ± 5°.
Shading of one cell can reduce string output disproportionately; bypass diodes limit the loss to a sub-string.
Solar PV Cells, Modules and Arrays
Cell types: monocrystalline (highest efficiency, ~20–23 %), polycrystalline (~17–20 %), thin film (a-Si, CdTe, CIGS, lower efficiency).
Typical cell V_oc ≈ 0.6–0.7 V; a 60-cell module gives V_oc ≈ 36–40 V; 72-cell module ≈ 44–46 V.
Cells in series add voltage; cells in parallel add current.
Module I-V curve: I_sc, V_oc, P_max at the knee; MPP tracker holds the operating point at the knee.
Series string voltage must stay below the inverter/charge controller maximum input voltage at the coldest expected temperature.
String current must stay below the module/string fuse rating at the hottest temperature and highest irradiance.
Hot-spot heating occurs when a shaded cell is reverse biased; bypass diodes and string fuses mitigate it.
Array = series strings in parallel; total power = sum of module powers when matched.
Solar PV System Components: Batteries, Charge Controllers and Inverters
Battery types: flooded lead-acid, VRLA/AGM/GEL, lithium-ion (LFP). LFP has higher usable depth of discharge (≈80–90 %) than lead-acid (≈50 %).
C-rate: C/10 discharge takes 10 h; C/5 takes 5 h; higher C-rate reduces usable capacity.
Battery capacity in Ah; energy in Wh = Ah × V.
PWM charge controller: module voltage must match battery voltage; simple, low cost.
MPPT charge controller: tracks maximum power point; typical efficiency 95–98 %; can accept higher array voltage.
Inverter efficiency typically 90–96 %; standby/self-consumption loss must be included in energy estimates.
Off-grid inverter output is often a modified sine wave (cheap) or pure sine wave (recommended for motors and electronics).
Grid-tied inverter must match grid voltage and frequency and disconnect on loss of grid (anti-islanding).
Solar PV System Design, Sizing, Load Estimation and Energy Yield
Daily energy demand E = Σ (P_device × hours/day)/inverter efficiency.
Array size (Wp) = E_daily / (peak sun hours × system efficiency); system efficiency includes soiling, temperature, wiring and inverter losses (typically 0.7–0.8).
Battery bank Ah = (E_daily × autonomy days)/(DoD × V_battery × η_inverter).
Charge controller current rating ≥ array I_sc × 1.25 (safety factor per IEC).
Inverter rating ≥ peak simultaneous load; check surge capability for motors.
Cable voltage drop: V_drop = 2 × L × I × ρ/A (two-way length), keep below 3 % for PV feeders.
Energy yield estimate: annual kWh = array kWp × PSH/day × 365 × performance ratio (PR ≈ 0.75–0.85).
Performance ratio PR = actual energy / (irradiance × array rating).
Installation, Commissioning, Testing and Maintenance of Solar PV Systems
Pre-commissioning checks: open-circuit voltage per string, short-circuit current per string, polarity, insulation resistance to earth (typically ≥ 1 MΩ at 1000 V test).
I-V curve tracer and irradiance meter are used to verify performance at commissioning.
Torque module clamp bolts to manufacturer specification; verify mounting structure and wind loading.
String voltage measured at the combiner should match the expected sum of module V_oc within tolerance.
Periodic maintenance: clean modules, inspect connectors for corrosion/arcing, check torque, inspect junction boxes and cable trays.
Thermography detects hotspots and loose terminations during operation.
Record commissioning data: date, irradiance, module temperature, string voltages/currents, insulation resistance.
Follow lockout/tagout on the DC side before servicing; treat DC conductors as live until proven de-energised.
Electrical Safety, First Aid and Fire Prevention
DC shock hazard: PV modules cannot be switched off; they generate voltage whenever illuminated.
Body current thresholds: ~1 mA perception, ~10 mA 'let-go', ~30 mA respiratory difficulty, ~50 mA ventricular fibrillation risk.
First aid for electric shock: isolate supply, call for help, then CPR if breathing/ heartbeat absent; do not touch the casualty while still energised.
Fire on electrical equipment: use CO₂ or dry powder extinguisher; never water on live electrical fire.
Arc flash: DC arcs do not self-extinguish at zero crossing as AC does; use DC-rated devices and PPE.
Working at height: harness, anchor point, and fall-arrest per site procedure; roof edges and fragile roofs are the main hazards.
Lockout/tagout: isolate AC and DC, verify dead with tester, discharge capacitors in inverters before opening.
PPE for PV work: insulated gloves (1000 V rated), arc-rated clothing, safety footwear, eye protection.
Solar Energy Applications
Solar water heating: flat-plate or evacuated tube collectors, typically 60–80 °C output; thermosiphon or pumped.
Solar PV water pumping: VFD or MPPT controller drives an AC or DC pump; typical agricultural use.
Solar street lighting: PV module + battery + LED luminaire + controller; autonomy typically 2–3 days.
Solar home systems (SHS): small PV + battery + charge controller for lighting and phone charging.
Solar dryer and solar cooker: direct thermal applications, low cost, used in rural settings.
Rooftop grid-tied PV: self-consumption plus export via net metering.
Solar–diesel hybrid: PV reduces diesel consumption; controller dispatches to maximise PV fraction.
Solar cold storage and telecom power: PV + battery with high autonomy requirements.
Net Metering and Grid Interconnection
Net metering: consumer's meter records import and export; billing is on net kWh over the billing period.
Net feed-in tariff (gross metering): all PV generation is exported and paid at a fixed tariff; consumption billed separately.
Anti-islanding protection: inverter must disconnect when grid is lost, per IEEE 1547 / IEC 62116.
Grid-tied inverter must match grid voltage, frequency, phase and power factor within specified limits.
Typical Indian residential net-metering cap is often 100–150 % of sanctioned load; state regulations vary.
Bi-directional meter (import/export) is required for net metering; a standard meter is insufficient.
Interconnection requires approval from the distribution licensee; application, feasibility, and meter testing precede commissioning.
Synchronisation: inverter output must be synchronised before closing the AC contactor; grid-tied inverters do this automatically.
Engineering Drawing, Trade Calculation and Estimation
Single-line diagram (SLD) of a PV system shows modules, strings, combiner, isolators, charge controller/inverter, battery, meter, earthing.
Schematic symbols: PV cell (diode with arrows), battery (long/short lines), earth (three decreasing lines), fuse (rectangle with line through).
Scale drawings: 1:50 means 1 unit on drawing = 50 units actual.
Bill of Materials (BOM) lists module, inverter, cables, connectors, mounting, fuses, isolators, meters with quantities.
Cable length estimate = route length + 10–15 % for slack and terminations; DC and AC runs costed separately.
Trade calculation: number of modules = ceil(array Wp / module Wp); number of strings = ceil(modules per string / modules per string capacity).
Estimation includes labour, transport, taxes (GST in India), and contingency; typical contingency 5–10 %.