ITI Solar Technician Electrical (AITT Theory) study materials
ITI Solar Technician Electrical (AITT Theory) study resources

ITI Solar Technician Electrical (AITT Theory) cheat sheet

ITI Solar Technician Electrical (AITT Theory) · Keep the key ideas within reach.

Quick reference

Electrical Fundamentals

  • Ohm's law: V = I × R; power P = V × I = I²R = V²/R.

  • Series: R_total = R1 + R2 + …; same current through all elements; voltages add.

  • Parallel: 1/R_total = 1/R1 + 1/R2 + …; same voltage across all; currents add.

  • Two resistors in parallel: R = (R1 × R2)/(R1 + R2).

  • Energy: W (Wh) = P (W) × t (h); 1 kWh = 3.6 × 10⁶ J.

  • Conductor resistance R = ρL/A; ρ(copper) ≈ 1.72 × 10⁻⁸ Ω·m at 20 °C.

  • Temperature coefficient of copper ≈ +0.00393 per °C; resistance rises with temperature.

  • Coulomb: 1 C = 1 A × 1 s; charge Q = I × t.

Quick reference

DC/AC Circuits and Measuring Instruments

  • RMS = peak/√2 for a sine wave; average of a full sine cycle = 0; average of half cycle = 0.637 × peak.

  • Frequency f = 1/T; Indian grid supply is 230 V RMS, 50 Hz, single phase.

  • Inductive reactance X_L = 2πfL; capacitive reactance X_C = 1/(2πfC).

  • Impedance Z = √(R² + (X_L − X_C)²); power factor = cos φ = R/Z.

  • Real power P = V I cos φ; reactive power Q = V I sin φ (var); apparent power S = V I (VA).

  • Ammeter connects in series, voltmeter in parallel; an ideal ammeter has zero resistance, ideal voltmeter infinite resistance.

  • Clamp meter measures current via magnetic field without breaking the circuit; works on AC and, with Hall sensor, DC.

  • Megohmmeter (insulation tester) applies 500 V DC to measure insulation resistance in MΩ; multiplier reading × range.

Quick reference

Basic Electronics

  • Diode: forward biased when anode > cathode by ≈0.7 V (Si) or 0.3 V (Ge); reverse biased blocks current.

  • Zener diode operates in reverse breakdown to regulate voltage; series resistor limits current.

  • Half-wave rectifier: output ripple frequency = supply frequency; full-wave = 2 × supply frequency.

  • Bridge rectifier uses 4 diodes; each pair conducts on alternate half cycles; output ≈ 0.9 × V_rms (unfiltered).

  • Filter capacitor reduces ripple; larger C or larger load resistance lowers ripple.

  • BJT: NPN conducts when base-emitter forward biased; β = I_C/I_B; used as switch or amplifier.

  • MOSFET is voltage-controlled; low gate current; common in MPPT and inverter switching stages.

  • Logic gates: AND (all 1s), OR (any 1), NOT (invert), NAND and NOR are universal gates.

Quick reference

Semiconductor Devices and Power Electronics

  • SCR (thyristor) latches on when gate pulse arrives and anode is forward biased; turns off only when current falls below holding current.

  • TRIAC is a bidirectional thyristor used for AC phase control; two SCRs back-to-back in behaviour.

  • IGBT combines MOSFET gate with BJT conduction; standard switch in grid-tied PV inverters.

  • Diode forward drop ≈ 0.7–1.0 V; conduction loss = V_f × I_avg.

  • Bypass diode across a module sub-string limits hotspot losses when shaded; blocking diode prevents reverse current at night.

  • PWM switching controls average output voltage: V_avg = D × V_dc, where D is duty cycle.

  • Boost converter steps voltage up: V_out = V_in/(1 − D); buck steps down: V_out = D × V_in.

  • Heat sink and thermal resistance θ (K/W) determine junction temperature: T_j = T_a + P × θ_total.

Quick reference

Electrical Wiring, Installation, Protection and Earthing

  • Indian cable sizes: 1, 1.5, 2.5, 4, 6, 10, 16, 25, 35 mm²; current capacity rises with cross-section.

  • Voltage drop limit for wiring design: typically ≤ 3 % for a PV feeder, ≤ 5 % overall.

  • MCB trips on overload (thermal) and short circuit (magnetic); rated breaking capacity in kA.

  • RCCB/ELCB (30 mA) protects people against earth leakage; does not replace MCB for overload.

  • Fuse rating must be ≥ design current and below cable current-carrying capacity.

  • Earthing: earth continuity conductor resistance to earth should be low (commonly ≤ 1 Ω for grid substations; ≤ 5 Ω for small installations).

  • DC side of a PV array requires DC-rated isolators, fuses and MCBs - AC devices must not be used on DC.

  • Cable derating factors apply for ambient temperature, grouping, and conduit/enclosure installation.

Quick reference

Solar Photovoltaic Fundamentals

  • Standard Test Conditions (STC): 1000 W/m² irradiance, 25 °C cell temperature, AM 1.5 spectrum.

  • Irradiance is measured in W/m²; energy in kWh/m²/day (peak sun hours).

  • Open-circuit voltage V_oc falls ≈ 0.3 %/°C as cell temperature rises; I_sc rises slightly with temperature.

  • Fill factor FF = (V_mp × I_mp)/(V_oc × I_sc); typical crystalline Si FF is 0.70–0.80.

  • Efficiency η = P_max/(irradiance × area).

  • Air mass AM 1.5 is the reference spectrum; AM 1 is overhead sun.

  • Albedo and tilt affect plane-of-array irradiance; optimum tilt in India is roughly latitude ± 5°.

  • Shading of one cell can reduce string output disproportionately; bypass diodes limit the loss to a sub-string.

Quick reference

Solar PV Cells, Modules and Arrays

  • Cell types: monocrystalline (highest efficiency, ~20–23 %), polycrystalline (~17–20 %), thin film (a-Si, CdTe, CIGS, lower efficiency).

  • Typical cell V_oc ≈ 0.6–0.7 V; a 60-cell module gives V_oc ≈ 36–40 V; 72-cell module ≈ 44–46 V.

  • Cells in series add voltage; cells in parallel add current.

  • Module I-V curve: I_sc, V_oc, P_max at the knee; MPP tracker holds the operating point at the knee.

  • Series string voltage must stay below the inverter/charge controller maximum input voltage at the coldest expected temperature.

  • String current must stay below the module/string fuse rating at the hottest temperature and highest irradiance.

  • Hot-spot heating occurs when a shaded cell is reverse biased; bypass diodes and string fuses mitigate it.

  • Array = series strings in parallel; total power = sum of module powers when matched.

Quick reference

Solar PV System Components: Batteries, Charge Controllers and Inverters

  • Battery types: flooded lead-acid, VRLA/AGM/GEL, lithium-ion (LFP). LFP has higher usable depth of discharge (≈80–90 %) than lead-acid (≈50 %).

  • C-rate: C/10 discharge takes 10 h; C/5 takes 5 h; higher C-rate reduces usable capacity.

  • Battery capacity in Ah; energy in Wh = Ah × V.

  • PWM charge controller: module voltage must match battery voltage; simple, low cost.

  • MPPT charge controller: tracks maximum power point; typical efficiency 95–98 %; can accept higher array voltage.

  • Inverter efficiency typically 90–96 %; standby/self-consumption loss must be included in energy estimates.

  • Off-grid inverter output is often a modified sine wave (cheap) or pure sine wave (recommended for motors and electronics).

  • Grid-tied inverter must match grid voltage and frequency and disconnect on loss of grid (anti-islanding).

Quick reference

Solar PV System Design, Sizing, Load Estimation and Energy Yield

  • Daily energy demand E = Σ (P_device × hours/day)/inverter efficiency.

  • Array size (Wp) = E_daily / (peak sun hours × system efficiency); system efficiency includes soiling, temperature, wiring and inverter losses (typically 0.7–0.8).

  • Battery bank Ah = (E_daily × autonomy days)/(DoD × V_battery × η_inverter).

  • Charge controller current rating ≥ array I_sc × 1.25 (safety factor per IEC).

  • Inverter rating ≥ peak simultaneous load; check surge capability for motors.

  • Cable voltage drop: V_drop = 2 × L × I × ρ/A (two-way length), keep below 3 % for PV feeders.

  • Energy yield estimate: annual kWh = array kWp × PSH/day × 365 × performance ratio (PR ≈ 0.75–0.85).

  • Performance ratio PR = actual energy / (irradiance × array rating).

Quick reference

Installation, Commissioning, Testing and Maintenance of Solar PV Systems

  • Pre-commissioning checks: open-circuit voltage per string, short-circuit current per string, polarity, insulation resistance to earth (typically ≥ 1 MΩ at 1000 V test).

  • I-V curve tracer and irradiance meter are used to verify performance at commissioning.

  • Torque module clamp bolts to manufacturer specification; verify mounting structure and wind loading.

  • String voltage measured at the combiner should match the expected sum of module V_oc within tolerance.

  • Periodic maintenance: clean modules, inspect connectors for corrosion/arcing, check torque, inspect junction boxes and cable trays.

  • Thermography detects hotspots and loose terminations during operation.

  • Record commissioning data: date, irradiance, module temperature, string voltages/currents, insulation resistance.

  • Follow lockout/tagout on the DC side before servicing; treat DC conductors as live until proven de-energised.

Quick reference

Electrical Safety, First Aid and Fire Prevention

  • DC shock hazard: PV modules cannot be switched off; they generate voltage whenever illuminated.

  • Body current thresholds: ~1 mA perception, ~10 mA 'let-go', ~30 mA respiratory difficulty, ~50 mA ventricular fibrillation risk.

  • First aid for electric shock: isolate supply, call for help, then CPR if breathing/ heartbeat absent; do not touch the casualty while still energised.

  • Fire on electrical equipment: use CO₂ or dry powder extinguisher; never water on live electrical fire.

  • Arc flash: DC arcs do not self-extinguish at zero crossing as AC does; use DC-rated devices and PPE.

  • Working at height: harness, anchor point, and fall-arrest per site procedure; roof edges and fragile roofs are the main hazards.

  • Lockout/tagout: isolate AC and DC, verify dead with tester, discharge capacitors in inverters before opening.

  • PPE for PV work: insulated gloves (1000 V rated), arc-rated clothing, safety footwear, eye protection.

Quick reference

Solar Energy Applications

  • Solar water heating: flat-plate or evacuated tube collectors, typically 60–80 °C output; thermosiphon or pumped.

  • Solar PV water pumping: VFD or MPPT controller drives an AC or DC pump; typical agricultural use.

  • Solar street lighting: PV module + battery + LED luminaire + controller; autonomy typically 2–3 days.

  • Solar home systems (SHS): small PV + battery + charge controller for lighting and phone charging.

  • Solar dryer and solar cooker: direct thermal applications, low cost, used in rural settings.

  • Rooftop grid-tied PV: self-consumption plus export via net metering.

  • Solar–diesel hybrid: PV reduces diesel consumption; controller dispatches to maximise PV fraction.

  • Solar cold storage and telecom power: PV + battery with high autonomy requirements.

Quick reference

Net Metering and Grid Interconnection

  • Net metering: consumer's meter records import and export; billing is on net kWh over the billing period.

  • Net feed-in tariff (gross metering): all PV generation is exported and paid at a fixed tariff; consumption billed separately.

  • Anti-islanding protection: inverter must disconnect when grid is lost, per IEEE 1547 / IEC 62116.

  • Grid-tied inverter must match grid voltage, frequency, phase and power factor within specified limits.

  • Typical Indian residential net-metering cap is often 100–150 % of sanctioned load; state regulations vary.

  • Bi-directional meter (import/export) is required for net metering; a standard meter is insufficient.

  • Interconnection requires approval from the distribution licensee; application, feasibility, and meter testing precede commissioning.

  • Synchronisation: inverter output must be synchronised before closing the AC contactor; grid-tied inverters do this automatically.

Quick reference

Engineering Drawing, Trade Calculation and Estimation

  • Single-line diagram (SLD) of a PV system shows modules, strings, combiner, isolators, charge controller/inverter, battery, meter, earthing.

  • Schematic symbols: PV cell (diode with arrows), battery (long/short lines), earth (three decreasing lines), fuse (rectangle with line through).

  • Scale drawings: 1:50 means 1 unit on drawing = 50 units actual.

  • Bill of Materials (BOM) lists module, inverter, cables, connectors, mounting, fuses, isolators, meters with quantities.

  • Cable length estimate = route length + 10–15 % for slack and terminations; DC and AC runs costed separately.

  • Trade calculation: number of modules = ceil(array Wp / module Wp); number of strings = ceil(modules per string / modules per string capacity).

  • Estimation includes labour, transport, taxes (GST in India), and contingency; typical contingency 5–10 %.