ITI Solar Technician Electrical (AITT Theory) study materials
ITI Solar Technician Electrical (AITT Theory) study resources

ITI Solar Technician Electrical (AITT Theory) study plan

ITI Solar Technician Electrical (AITT Theory) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Electrical Fundamentals, DC/AC Circuits and Measuring Instruments & Electrical Wiring, Installation, Protection and Earthing

  • Solve series, parallel and series-parallel DC resistance networks using Ohm's law and Kirchhoff's laws, showing every step of the working

  • Compute RMS, average and peak values, frequency and phase relationships for single-phase AC waveforms, and contrast them with three-phase star and delta quantities

  • Demonstrate correct use of a multimeter, clamp meter, insulation resistance tester and earth resistance tester on a practice board, and state what each reading proves

  • Select cable cross-sectional area for a given load using current-carrying capacity, derating factors and permissible voltage drop

Your checkpoint

A hand-written worked-problem sheet of 25 solved numericals (10 DC network, 8 AC waveform/three-phase, 4 cable sizing, 3 instrument-reading interpretation), each with formula, substitution, unit and final answer, scored at 80% or better against the answer key

Week 2

Electrical Wiring, Installation, Protection and Earthing & Electrical Fundamentals, DC/AC Circuits and Measuring Instruments

  • Distinguish the purpose and application of MCB, MCCB, RCCB, RCBO and fuse, and choose the correct device rating and breaking capacity for a described circuit

  • Explain TN-S, TN-C-S, TT and IT earthing arrangements and justify the protective device coordination each one requires

  • Describe the procedure for measuring earth electrode resistance and state acceptable limits for a PV installation

  • Identify wiring faults (open circuit, short circuit, earth leakage, reversed polarity) from described symptoms and specify the test that confirms each

Your checkpoint

A one-page protection and earthing decision chart covering device type, earthing system, test instrument, acceptance limit and corrective action, plus 15 multiple-choice practice questions answered with a written reason for each choice

Week 3

Solar Photovoltaic Fundamentals, Cells, Modules and Arrays & Basic Electronics, Semiconductor Devices and Power Electronics

  • Explain the photovoltaic effect from photon absorption through electron-hole pair generation to current flow, and relate irradiance and cell temperature to I-V curve shape

  • Read a module datasheet and extract Voc, Isc, Vmp, Imp, Pmax, temperature coefficients, NOCT and system voltage rating, then calculate the temperature-corrected Voc at the lowest expected site temperature

  • Compute the effect of partial shading and mismatch on a series string, and state how bypass and blocking diodes limit the loss

  • Describe the construction and function of the diode, BJT as a switch, thyristor and MOSFET, and explain where each appears in PV balance-of-system equipment

  • Explain how a PWM and an MPPT charge controller differ in operating point and when each is appropriate

Your checkpoint

A completed module-and-string calculation worksheet for three different module datasheets: per-module temperature-corrected Voc, maximum and minimum modules per string for a stated inverter window, and a labelled sketch of an I-V curve showing the effect of 30% shading with and without bypass diodes

Week 4

Solar PV System Components: Batteries, Charge Controllers and Inverters & Solar Photovoltaic Fundamentals, Cells, Modules and Arrays

  • Compare flooded lead-acid, AGM, gel and lithium iron phosphate batteries on cycle life, depth of discharge, charging profile and maintenance, and select one for a stated duty

  • Calculate battery bank capacity in Ah and kWh from daily energy demand, days of autonomy, depth of discharge and inverter efficiency, then verify the C-rate is within the battery's specification

  • Interpret charge controller and inverter datasheets: MPPT voltage window, maximum PV input current, surge rating, efficiency curve and anti-islanding capability

  • Explain array-to-inverter DC:AC ratio, clipping loss, and when oversizing the array is economically justified

Your checkpoint

A battery bank and inverter selection brief for a specified 5 kWh/day off-grid load: capacity calculation with all derating factors shown, two candidate batteries and two candidate inverters compared in a table, and a justified final recommendation of 300 words

Week 5

Solar PV System Design, Sizing, Load Estimation and Energy Yield & Engineering Drawing, Trade Calculation and Estimation

  • Build a full load estimation table from appliance power, quantity, daily hours and a diversity factor, and convert it to daily and peak demand

  • Size a complete off-grid system end to end: array kWp from peak sun hours and system losses, controller rating, battery bank, cable sizes and protection ratings

  • Size a grid-connected system from a target annual yield using specific yield and performance ratio, and predict monthly output

  • Read and produce single-line diagrams and layout drawings using correct electrical symbols, and scale a drawing from a stated ratio

  • Prepare a bill of quantities and cost estimate for a described rooftop system with labour, mounting and balance-of-system line items

Your checkpoint

A complete system design report for one off-grid and one grid-tied case: load table, sizing calculations, single-line diagram drawn to correct symbols, bill of quantities with priced line items, and a payback estimate for the grid-tied case

Week 6

Installation, Commissioning, Testing and Maintenance of Solar PV Systems & Solar PV System Design, Sizing, Load Estimation and Energy Yield

  • Sequence a rooftop installation from site survey and structural check through mounting, module placement, DC cabling, earthing and AC connection

  • Specify the commissioning test set: open-circuit voltage per string, short-circuit current, insulation resistance, polarity, earth continuity, inverter start-up and anti-islanding verification, with pass criteria for each

  • Diagnose five described field faults (string underperformance, hot spot, ground fault, inverter derating, communication loss) and state the test and corrective action for each

  • Write a preventive maintenance schedule with task, interval and acceptance criterion for modules, batteries, controllers, inverters and cabling

Your checkpoint

A commissioning checklist and a 12-month maintenance schedule for a 10 kWp rooftop system, with at least 20 checklist items each carrying an instrument, a pass criterion and a sign-off column, plus a fault-diagnosis table covering the five fault scenarios

Week 7

Electrical Safety, First Aid and Fire Prevention & Solar Energy Applications, Net Metering and Grid Interconnection

  • Apply the isolation, lockout-tagout and prove-dead sequence to a PV array, and explain why the DC side remains live under sunlight even with the AC isolator open

  • Demonstrate the first-aid response to electric shock and to arc-flash burns, including safe approach, CPR sequence and when defibrillation applies

  • State the fire-safety precautions for PV installations: arc-fault and ground-fault protection, DC isolator placement, and the hazards firefighters face from energized conductors

  • Explain net metering, bidirectional metering, feed-in tariff versus net feed-in settlement, and the interconnection requirements a grid-tied inverter must satisfy

  • Describe anti-islanding, grid voltage and frequency ride-through, power factor and harmonics limits, and why each matters to the distribution utility

Your checkpoint

A two-part safety and interconnection brief: a one-page lockout-tagout and emergency-response procedure for a PV site, and a 400-word explanation of the net metering application process, metering arrangement and inverter interconnection requirements for a residential rooftop system

Week 8

Electrical Fundamentals, DC/AC Circuits and Measuring Instruments & Electrical Wiring, Installation, Protection and Earthing & Solar Photovoltaic Fundamentals, Cells, Modules and Arrays & Solar PV System Components: Batteries, Charge Controllers and Inverters & Solar PV System Design, Sizing, Load Estimation and Energy Yield & Installation, Commissioning, Testing and Maintenance of Solar PV Systems & Electrical Safety, First Aid and Fire Prevention & Solar Energy Applications, Net Metering and Grid Interconnection & Engineering Drawing, Trade Calculation and Estimation

  • Complete two full-length timed mock papers under exam conditions and record the score per domain

  • Re-study only the two weakest domains, reworking every missed question to a correct worked solution

  • Recite from memory the key formulas for Ohm's law, power, three-phase quantities, battery capacity, array sizing, voltage drop and string voltage limits

  • Review safety, earthing and net metering points one final time, since these carry high marks per unit of study effort

Your checkpoint

A scored mock-exam log showing both paper results by domain, a list of every missed question with the corrected working, and a one-page formula and safety-limit summary sheet written from memory

Milestones

Week 2: Score 80% or better on a 30-question self-test covering Domains 1 and 3, and correctly identify the protective device and earthing requirement for five described installation scenarios without notes

Week 4: Produce a battery and inverter selection for a stated load where the capacity calculation, C-rate check and MPPT window check all agree, and correctly answer 8 of 10 questions on module datasheet interpretation including temperature-corrected Voc

Week 6: Complete a full off-grid and grid-tied design with no arithmetic errors on re-check, and pass a verbal walk-through of the commissioning sequence and the five field-fault diagnoses

Week 8: Achieve 75% or better overall on both timed mock papers with no domain below 60%, and have a written correction for every missed question