ITI Solar Technician Electrical (AITT Theory) study plan
ITI Solar Technician Electrical (AITT Theory) · Give each week a clear focus.
8 weeks · About 6 hours per week
Electrical Fundamentals, DC/AC Circuits and Measuring Instruments & Electrical Wiring, Installation, Protection and Earthing
Solve series, parallel and series-parallel DC resistance networks using Ohm's law and Kirchhoff's laws, showing every step of the working
Compute RMS, average and peak values, frequency and phase relationships for single-phase AC waveforms, and contrast them with three-phase star and delta quantities
Demonstrate correct use of a multimeter, clamp meter, insulation resistance tester and earth resistance tester on a practice board, and state what each reading proves
Select cable cross-sectional area for a given load using current-carrying capacity, derating factors and permissible voltage drop
Your checkpoint
A hand-written worked-problem sheet of 25 solved numericals (10 DC network, 8 AC waveform/three-phase, 4 cable sizing, 3 instrument-reading interpretation), each with formula, substitution, unit and final answer, scored at 80% or better against the answer key
Electrical Wiring, Installation, Protection and Earthing & Electrical Fundamentals, DC/AC Circuits and Measuring Instruments
Distinguish the purpose and application of MCB, MCCB, RCCB, RCBO and fuse, and choose the correct device rating and breaking capacity for a described circuit
Explain TN-S, TN-C-S, TT and IT earthing arrangements and justify the protective device coordination each one requires
Describe the procedure for measuring earth electrode resistance and state acceptable limits for a PV installation
Identify wiring faults (open circuit, short circuit, earth leakage, reversed polarity) from described symptoms and specify the test that confirms each
Your checkpoint
A one-page protection and earthing decision chart covering device type, earthing system, test instrument, acceptance limit and corrective action, plus 15 multiple-choice practice questions answered with a written reason for each choice
Solar Photovoltaic Fundamentals, Cells, Modules and Arrays & Basic Electronics, Semiconductor Devices and Power Electronics
Explain the photovoltaic effect from photon absorption through electron-hole pair generation to current flow, and relate irradiance and cell temperature to I-V curve shape
Read a module datasheet and extract Voc, Isc, Vmp, Imp, Pmax, temperature coefficients, NOCT and system voltage rating, then calculate the temperature-corrected Voc at the lowest expected site temperature
Compute the effect of partial shading and mismatch on a series string, and state how bypass and blocking diodes limit the loss
Describe the construction and function of the diode, BJT as a switch, thyristor and MOSFET, and explain where each appears in PV balance-of-system equipment
Explain how a PWM and an MPPT charge controller differ in operating point and when each is appropriate
Your checkpoint
A completed module-and-string calculation worksheet for three different module datasheets: per-module temperature-corrected Voc, maximum and minimum modules per string for a stated inverter window, and a labelled sketch of an I-V curve showing the effect of 30% shading with and without bypass diodes
Solar PV System Components: Batteries, Charge Controllers and Inverters & Solar Photovoltaic Fundamentals, Cells, Modules and Arrays
Compare flooded lead-acid, AGM, gel and lithium iron phosphate batteries on cycle life, depth of discharge, charging profile and maintenance, and select one for a stated duty
Calculate battery bank capacity in Ah and kWh from daily energy demand, days of autonomy, depth of discharge and inverter efficiency, then verify the C-rate is within the battery's specification
Interpret charge controller and inverter datasheets: MPPT voltage window, maximum PV input current, surge rating, efficiency curve and anti-islanding capability
Explain array-to-inverter DC:AC ratio, clipping loss, and when oversizing the array is economically justified
Your checkpoint
A battery bank and inverter selection brief for a specified 5 kWh/day off-grid load: capacity calculation with all derating factors shown, two candidate batteries and two candidate inverters compared in a table, and a justified final recommendation of 300 words
Solar PV System Design, Sizing, Load Estimation and Energy Yield & Engineering Drawing, Trade Calculation and Estimation
Build a full load estimation table from appliance power, quantity, daily hours and a diversity factor, and convert it to daily and peak demand
Size a complete off-grid system end to end: array kWp from peak sun hours and system losses, controller rating, battery bank, cable sizes and protection ratings
Size a grid-connected system from a target annual yield using specific yield and performance ratio, and predict monthly output
Read and produce single-line diagrams and layout drawings using correct electrical symbols, and scale a drawing from a stated ratio
Prepare a bill of quantities and cost estimate for a described rooftop system with labour, mounting and balance-of-system line items
Your checkpoint
A complete system design report for one off-grid and one grid-tied case: load table, sizing calculations, single-line diagram drawn to correct symbols, bill of quantities with priced line items, and a payback estimate for the grid-tied case
Installation, Commissioning, Testing and Maintenance of Solar PV Systems & Solar PV System Design, Sizing, Load Estimation and Energy Yield
Sequence a rooftop installation from site survey and structural check through mounting, module placement, DC cabling, earthing and AC connection
Specify the commissioning test set: open-circuit voltage per string, short-circuit current, insulation resistance, polarity, earth continuity, inverter start-up and anti-islanding verification, with pass criteria for each
Diagnose five described field faults (string underperformance, hot spot, ground fault, inverter derating, communication loss) and state the test and corrective action for each
Write a preventive maintenance schedule with task, interval and acceptance criterion for modules, batteries, controllers, inverters and cabling
Your checkpoint
A commissioning checklist and a 12-month maintenance schedule for a 10 kWp rooftop system, with at least 20 checklist items each carrying an instrument, a pass criterion and a sign-off column, plus a fault-diagnosis table covering the five fault scenarios
Electrical Safety, First Aid and Fire Prevention & Solar Energy Applications, Net Metering and Grid Interconnection
Apply the isolation, lockout-tagout and prove-dead sequence to a PV array, and explain why the DC side remains live under sunlight even with the AC isolator open
Demonstrate the first-aid response to electric shock and to arc-flash burns, including safe approach, CPR sequence and when defibrillation applies
State the fire-safety precautions for PV installations: arc-fault and ground-fault protection, DC isolator placement, and the hazards firefighters face from energized conductors
Explain net metering, bidirectional metering, feed-in tariff versus net feed-in settlement, and the interconnection requirements a grid-tied inverter must satisfy
Describe anti-islanding, grid voltage and frequency ride-through, power factor and harmonics limits, and why each matters to the distribution utility
Your checkpoint
A two-part safety and interconnection brief: a one-page lockout-tagout and emergency-response procedure for a PV site, and a 400-word explanation of the net metering application process, metering arrangement and inverter interconnection requirements for a residential rooftop system
Electrical Fundamentals, DC/AC Circuits and Measuring Instruments & Electrical Wiring, Installation, Protection and Earthing & Solar Photovoltaic Fundamentals, Cells, Modules and Arrays & Solar PV System Components: Batteries, Charge Controllers and Inverters & Solar PV System Design, Sizing, Load Estimation and Energy Yield & Installation, Commissioning, Testing and Maintenance of Solar PV Systems & Electrical Safety, First Aid and Fire Prevention & Solar Energy Applications, Net Metering and Grid Interconnection & Engineering Drawing, Trade Calculation and Estimation
Complete two full-length timed mock papers under exam conditions and record the score per domain
Re-study only the two weakest domains, reworking every missed question to a correct worked solution
Recite from memory the key formulas for Ohm's law, power, three-phase quantities, battery capacity, array sizing, voltage drop and string voltage limits
Review safety, earthing and net metering points one final time, since these carry high marks per unit of study effort
Your checkpoint
A scored mock-exam log showing both paper results by domain, a list of every missed question with the corrected working, and a one-page formula and safety-limit summary sheet written from memory
Milestones
Week 2: Score 80% or better on a 30-question self-test covering Domains 1 and 3, and correctly identify the protective device and earthing requirement for five described installation scenarios without notes
Week 4: Produce a battery and inverter selection for a stated load where the capacity calculation, C-rate check and MPPT window check all agree, and correctly answer 8 of 10 questions on module datasheet interpretation including temperature-corrected Voc
Week 6: Complete a full off-grid and grid-tied design with no arithmetic errors on re-check, and pass a verbal walk-through of the commissioning sequence and the five field-fault diagnoses
Week 8: Achieve 75% or better overall on both timed mock papers with no domain below 60%, and have a written correction for every missed question