The OSSC Soil Conservation Extension Worker recruitment examination is a state-level selection test conducted by the Odisha Staff Selection Commission to fill extension-worker posts that support soil and water conservation work in Odisha's rural districts. The role sits at the intersection of field agronomy and community outreach: an extension worker helps farmers adopt contour bunding, trenching, check dams, afforestation and other conservation measures, and explains government soil-health and watershed programmes in villages. The OSSC Soil Conservation Extension Worker case studies are 5 cases and about 3,694 words.

1

Reading a Soil Test Report on a Sloping Laterite Field

A 1.2 ha upland plot in the Eastern Ghats, at about 900 m elevation, has grown upland paddy for eleven years. The land slopes 7–9% towards a seasonal stream.

755 words, about 4 min
2

Sizing a Farm Pond and Testing a Paddy Plan

A watershed committee plans one farm pond on a 15 ha catchment and wants to irrigate paddy from it. Annual rainfall is 1,100 mm, of which about 85% falls between June and October; the block's runoff-plot estimate for this soil and land use gives a runoff coefficient of 0.30.

716 words, about 4 min
3

When a Demonstration Fails: Diagnosing Non-Adoption

A block extension team in the coastal plains laid out 20 cluster demonstrations of a newly released short-duration paddy variety on 25 farmers' fields in one season. Canal release was delayed by 25 days, so every demonstration plot was transplanted late.

735 words, about 4 min
4

Converging MGNREGA and Watershed Funds in a Gram Panchayat

A gram panchayat with 8 villages and 1,850 households has 620 MGNREGA job-card holders. A 500 ha watershed inside it contains 180 ha of degraded upland on 5–8% slopes; the rest is medium land under paddy.

759 words, about 4 min
5

Field Measurement, Budget Allocation and Seed Estimate

An extension worker must prepare a work and input estimate for three adjoining patches before the monsoon. Patch A is rectangular, 200 m × 120 m.

729 words, about 4 min