UPMSP Vocational Dressmaking & Decoration study materials
UPMSP Vocational Dressmaking & Decoration study resources

UPMSP Vocational Dressmaking & Decoration study plan

UPMSP Vocational Dressmaking & Decoration · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fundamentals of Dressmaking and Textile Knowledge & Drafting and Pattern Making

  • Distinguish natural, regenerated and synthetic fibre families and state two performance properties and one care caution for each

  • Identify plain, twill and satin weaves from fabric swatches and explain how weave direction affects grain line and drape

  • Take and record a full set of 12 body measurements on a partner using correct landmark points and a measurement chart

  • Draft a basic bodice block to personal measurements with correct seam and wearing ease allowances

  • Label every pattern piece with grain line, fold line, notches and balance marks

Your checkpoint

A measurement chart plus a drafted and labelled bodice block on pattern paper, photographed and annotated

Week 2

Drafting and Pattern Making & Cutting, Stitching and Construction Techniques

  • Draft a sleeve block and a skirt block from the bodice and skirt measurements and true the seams

  • Grade one pattern piece up and down by one size and explain the pivot versus shift grading methods

  • Lay out pattern pieces on fabric respecting grain, nap and directional prints and calculate fabric consumption for two widths

  • Cut a muslin toile of the bodice and sleeve and mark all transfer points with tailor tacks

  • Identify and correct three common fitting faults visible on the toile

Your checkpoint

A graded pattern set plus a stitched and fitted calico toile with a written fault-and-correction list

Week 3

Cutting, Stitching and Construction Techniques

  • Operate and thread the industrial single-needle lockstitch machine and set tension on three fabric weights

  • Sew and press five seam types: plain, French, flat fell, lapped and overlocked, to a tolerance of 3 mm

  • Construct a sample set of darts, tucks, pleats, gathers and a set-in sleeve with correct ease distribution

  • Attach a concealed zip, a centred zip and a machine buttonhole at the required standard

  • Explain the purpose of stay stitching, under stitching and clipping curves

Your checkpoint

A bound seam-and-technique sample book of at least 12 labelled samples with a self-scored quality checklist

Week 4

Cutting, Stitching and Construction Techniques & Garment Finishing, Fitting and Quality Control

  • Construct a complete skirt or kameez from cut fabric to finished hem within a timed session

  • Apply interfacing to the correct areas and explain fusible versus sew-in choice by fabric

  • Fit the garment on a live model and adjust side seams, waistline and hem level

  • Finish the hem with an appropriate technique and press the completed garment

  • Write a construction order sheet for the garment listing every operation in sequence

Your checkpoint

One finished, fitted and pressed garment with a written construction order sheet and fit notes

Week 5

Decorative Techniques and Embellishment

  • Work five hand-embroidery stitches on a sampler and state the traditional use of each

  • Demonstrate three surface embellishment techniques such as applique, mirror work and beadwork on a fabric panel

  • Prepare fabric for embellishment by marking the design, choosing the correct needle and hoop tension

  • Apply a decorative border to a garment edge and finish the reverse side cleanly

  • Compare the time and material cost of hand versus machine embellishment for a small order

Your checkpoint

An embellished fabric panel and one garment with an applied decorative border, with a cost and time comparison note

Week 6

Garment Finishing, Fitting and Quality Control & Care, Maintenance and Storage of Garments and Equipment

  • Run a 10-point final inspection on two finished garments and record defects with severity ratings

  • Correct two identified defects and document the rework method used

  • Read and interpret five common care label symbols and match them to fibre care requirements

  • Demonstrate stain removal on three stain types using correct reagents and blotting technique

  • Set up a maintenance schedule for the sewing machine covering oiling, needle change and belt check

Your checkpoint

A completed inspection report with defect photos and a one-page machine and garment care schedule

Week 7

Entrepreneurship, Costing and Occupational Safety

  • Cost one garment fully, separating material, labour, overhead and profit margin, and set a selling price

  • Prepare a break-even calculation for a small production batch of 20 pieces

  • Draft a simple order form and measurement record card a customer would sign

  • Identify five workshop hazards and state the control measure for each

  • List the safety rules for the overlock machine, iron and cutting shears

Your checkpoint

A costing sheet, break-even statement and workshop safety checklist for a small unit

Week 8

Practical Workshop and Project Work & Fundamentals of Dressmaking and Textile Knowledge & Drafting and Pattern Making & Cutting, Stitching and Construction Techniques & Decorative Techniques and Embellishment & Garment Finishing, Fitting and Quality Control & Care, Maintenance and Storage of Garments and Equipment & Entrepreneurship, Costing and Occupational Safety

  • Complete a full project garment from measurement to final inspection within a set time limit

  • Take two timed mock tests covering all eight domains and score at least 70 percent on each

  • Review every wrong answer and write the correct fact with its source in a revision sheet

  • Present the project garment with its pattern, cost sheet and inspection report as a portfolio

  • Recite the key safety, costing and care facts from memory without notes

Your checkpoint

A complete project portfolio containing pattern, garment, cost sheet, inspection report and two scored mock tests

Milestones

Week 2: Bodice, sleeve and skirt blocks drafted to personal measurements and a fitted calico toile approved against a fit checklist

Week 4: One garment constructed, fitted on a model and pressed, with a written construction order sheet

Week 6: Inspection report and care schedule completed, and at least two defects corrected to standard

Week 8: Two mock tests scored at 70 percent or above and a complete project portfolio submitted