UPMSP Vocational Textile Design study materials
UPMSP Vocational Textile Design study resources

UPMSP Vocational Textile Design study plan

UPMSP Vocational Textile Design · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Textile Fibres and Yarn Fundamentals & Fabric Construction, Weaving and Knitting

  • Classify cotton, silk, wool, polyester and viscose by origin, burning behaviour, and moisture regain, writing a one-line identification cue for each

  • Distinguish staple from filament fibres and explain how staple length affects yarn twist, hairiness and fabric hand

  • Compute English cotton count, metric count and denier conversions for eight given yarn numbers and label each answer with its unit

  • Trace the sequence warp preparation, shedding, picking, beating-up and take-up on a handloom and list the woven structure each motion controls

  • Compare plain, twill and satin weave by interlacing frequency, float length and the fabric properties each produces

Your checkpoint

A hand-written fibre identification chart covering 10 fibres with burn test result, moisture regain and typical end use, plus 8 solved yarn-count conversion problems with working shown.

Week 2

Fabric Construction, Weaving and Knitting & Textile Design Principles and Motif Development

  • Draft a point-paper diagram for plain weave and a 4/1 twill on graph paper, then mark the warp and weft floats on each

  • Explain how weave repeat size, sett and yarn count combine to determine fabric cover and GSM

  • Analyse five woven fabric samples (or described swatches) and identify weave type, float direction and likely end use

  • Define balance, rhythm, proportion, emphasis and harmony and apply each term to a named textile example

  • Sketch three motif repeats (straight, half-drop and brick) and state which repeat suits which fabric width

Your checkpoint

A graph-paper portfolio sheet containing two correct weave drafts with lifting plans and three labelled motif repeat layouts, each annotated with the design principle it demonstrates.

Week 3

Fabric Construction, Weaving and Knitting & Textile Design Principles and Motif Development

  • Differentiate weft-knit and warp-knit construction by loop formation, stretch direction and edge behaviour

  • Compare single jersey, rib, interlock and purl structures by appearance on face and back

  • Develop one floral motif from a natural source sketch through stylisation into a repeatable unit

  • Produce a colourway sheet showing the same motif in three distinct colour schemes and justify each choice

  • Explain how a designer adapts a motif for dobby versus jacquard capability

Your checkpoint

A stylised floral motif with a completed repeat tile, three colourways, and a written note of at least 100 words justifying the colour choices and the weave capability targeted.

Week 4

Surface Ornamentation, Printing and Dyeing & Textile Materials, Tools and Equipment

  • Sequence the stages of direct, discharge and resist dyeing and name the fibre class each suits best

  • Build a dye-class table for reactive, vat, acid and disperse dyes covering fibre, method and fastness strength

  • Compare block, screen, rotary-screen and digital printing by setup cost, repeat size and typical order quantity

  • List the tools and equipment needed for a small block-printing unit with approximate costs

  • Identify the safety controls for dyes, mordants and steaming equipment and record them as a checklist

Your checkpoint

A comparative table of four printing methods and four dye classes, plus a costed equipment list for a small block-printing setup with a safety checklist attached.

Week 5

Textile Production Processes and Quality Control & Textile Fibres and Yarn Fundamentals

  • Map the spinning-to-garment production flow and state the quality check performed at each stage

  • Define count strength product, crimp, fabric shrinkage, colour fastness and GSM and explain how each is tested

  • Interpret a given inspection result against the 4-point fabric inspection system and calculate a defect score

  • Explain how fibre maturity and trash content influence yarn irregularity and dye uptake

  • Describe how a designer's repeat or colour choice can raise or lower production rejection rates

Your checkpoint

A one-page production flow chart from fibre to finished fabric with a quality checkpoint at every stage, plus a worked 4-point inspection scoring of 100 metres with the defect points total calculated.

Week 6

Textile Design Practical and Project Work & Surface Ornamentation, Printing and Dyeing

  • Prepare a design brief stating end use, target customer, fabric, technique and repeat size

  • Produce a mood board and a colour card of at least six shades derived from the brief

  • Execute two surface techniques (for example block print and tie-resist) on prepared fabric swatches

  • Evaluate both swatches for registration, penetration, fastness and finish, and record improvements

  • Assemble the swatches, mood board and brief into a coherent project file

Your checkpoint

A project file with design brief, mood board, six-shade colour card and two finished surface-ornamentation swatches, each with a written evaluation of at least 100 words.

Week 7

Textile Design Practical and Project Work & Entrepreneurship, Costing and Workplace Safety in Textile Design

  • Cost one finished product by calculating material, labour, overhead and wastage, then set a wholesale and retail price

  • Calculate break-even quantity for a small production run from fixed cost, variable cost and selling price

  • Compare three selling channels (local market, wholesale buyer, online) by reach, margin and payment risk

  • Draft a simple profit-and-loss statement for a one-month production cycle

  • Explain the documentation a small textile unit needs for GST, MSME registration and a basic invoice

Your checkpoint

A complete costing sheet and break-even calculation for one designed product, with a one-month projected profit-and-loss statement and a sample invoice.

Week 8

Entrepreneurship, Costing and Workplace Safety in Textile Design & Textile Production Processes and Quality Control & Textile Design Practical and Project Work

  • Review all eight domains using a self-made question set and score at least 80 percent

  • Revisit every previously missed fact and rewrite it as a corrected one-line statement

  • Rehearse a five-minute viva explanation of the project file covering brief, technique and costing

  • Confirm workplace safety and legal compliance points for a small unit in a written checklist

  • Finalise the portfolio order and index so the project file can be submitted as one bound document

Your checkpoint

A bound final portfolio (brief, mood board, colour card, swatches, costing, invoice, safety checklist) plus a scored self-test record showing 80 percent or above across all domains.

Milestones

Week 4: Can identify weave type from a draft, convert yarn counts correctly, and explain the difference between discharge and resist dyeing without notes.

Week 6: Project file contains a complete brief, mood board, six-shade colour card and two evaluated swatches meeting the stated technique requirements.

Week 8: Self-test score of 80 percent or above across all eight domains, and the bound portfolio is complete and indexed for submission.