ISA CCST Level I study plan

ISA CCST Level I · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Calibration

  • Define accuracy, precision, repeatability, hysteresis, drift, and span in your own words with a worked example of each

  • Convert between engineering units (psi/kPa, °F/°C, inches H2O/psi) and compute percent-of-span error for 20 given values

  • Distinguish zero shift from span error and state which adjustment corrects each

  • Trace a measurement back through test equipment to a calibration standard and explain why the chain matters

Your checkpoint

One-page reference sheet of calibration formulas plus a 20-problem error/span worksheet scored at 90% or better

Week 2

Calibration

  • Sequence a five-point up/down calibration and justify the order of test points

  • Record as-found versus as-left data and decide pass/fail against a stated tolerance

  • Select test equipment whose accuracy ratio is adequate for the instrument under test

  • Write a calibration procedure that another technician could follow without asking questions

Your checkpoint

A complete written calibration procedure for a pressure transmitter, including tolerance table, test points, and as-found/as-left recording form

Week 3

Troubleshooting

  • Apply a divide-in-half method to isolate a fault between sensor, wiring, and receiver

  • Compute expected current at a given process value in a 4-20 mA loop and use that number to predict a reading

  • Demonstrate safe use of a multimeter for voltage, current, and resistance checks on a de-energized and energized loop

  • Identify open circuit, short, ground fault, and high-resistance connection from symptom patterns

Your checkpoint

A decision-tree flowchart that takes a 'no reading' 4-20 mA loop symptom to a confirmed root cause in ten steps or fewer

Week 4

Troubleshooting

  • Classify sensor-side failures versus controller I/O and power supply failures by observable symptoms

  • Diagnose noise, grounding, and shielding problems from intermittent or offset readings

  • Differentiate calibration drift from an actual hardware fault before replacing parts

  • Document a fault, the test that confirmed it, and the corrective action in a standard format

Your checkpoint

A ten-case troubleshooting log covering at least four distinct fault classes, each with symptom, test, root cause, and fix

Week 5

Maintenance and Repair

  • Build a preventive maintenance schedule from manufacturer intervals and service criticality

  • List inspection points for a transmitter, a control valve, and a representative sample system

  • Apply lockout/tagout and isolation steps before opening a loop or removing an instrument

  • Identify wear items and specify spare parts held on hand with justification

Your checkpoint

A preventive maintenance checklist for one instrument loop and one control valve, with intervals and acceptance criteria

Week 6

Maintenance and Repair

  • Compare bench repair versus field repair and state when each is appropriate

  • Sequence a repair so that calibration and verification occur after reassembly, not before

  • Write pass/fail verification criteria into a work order before starting the job

  • Describe recordkeeping that links a repair to the calibration history of the device

Your checkpoint

A completed repair work-order package for a simulated faulty instrument, including diagnosis, parts replaced, post-repair verification results, and sign-off

Week 7

Project Start-up, Commissioning, and Loop Check

  • Read a loop on a P&ID and cross-check it against the instrument index and wiring drawings

  • Perform a point-to-point continuity and polarity check from field device to control system terminal

  • Execute a loop check that verifies indication, output action, and alarm setpoints at the operator interface

  • Distinguish cold commissioning from warm commissioning and list the prerequisites for each

Your checkpoint

A completed loop-check package for five loops with point-to-point results, stroke/indication verification, and discrepancy notes

Week 8

Project Start-up, Commissioning, and Loop Check & Calibration & Maintenance and Repair & Troubleshooting

  • Sequence a start-up from utility checks through first-line-up and document the hold points

  • Compile and prioritize a punch list from commissioning discrepancies

  • Assemble turnover documentation a client would accept at handover

  • Take a timed 100-question practice exam spanning all four domains and review every missed item

Your checkpoint

A start-up and turnover binder outline plus a timed 100-question practice exam scored at 80% or higher with a written list of weak areas

Milestones

Week 2: Score 90% or better on the calibration worksheet and produce a procedure a peer can execute unaided

Week 4: Correctly diagnose at least 8 of 10 troubleshooting cases without hints, naming the confirming test for each

Week 6: Complete a repair work order end to end, with post-repair verification documented and signed off

Week 8: Score 80% or higher on the timed 100-question practice exam with no domain below 70%