Understand Service & Purpose

  • Service purpose answers two questions: what customer need is met, and what the service does to meet it; both must be stated in one sentence a customer would recognize.

  • A purpose statement is testable when it names the beneficiary, the outcome, and the boundary of what the service will not do.

  • Customer, not internal department, defines value; internal stakeholders are constraints on delivery, not the source of purpose.

  • Demand is the rate and pattern of work arriving; capacity is the rate the system can complete work; purpose is only achievable when demand is understood against capacity.

  • Distinguish the service (ongoing co-created value) from the product (what is exchanged) and the outcome (change in the customer's condition).

  • Three questions to validate purpose: Who is worse off without us? What measurable change do we cause? What would we refuse to do?

  • Purpose drift signal: work items that no stated purpose explains accumulate in queues and consume capacity without a customer outcome.

  • Purpose is the anchor for every later decision (classes of service, policies, WIP limits); if purpose is unclear, prioritization becomes opinion.

Quick reference

Design Workflow (policies & capacity, classes of service)

  • Classes of service are named categories of work with explicit policies for priority, WIP allocation, and expected time; typical set: expedite, fixed-date, standard, intangible.

  • Expedite class rule: capacity reserved (commonly one slot or a small percentage of WIP), each item requires explicit sponsor approval, and expedited items are capped so the class cannot starve standard work.

  • Fixed-date class: work is pulled by date risk, not arrival order; start no later than the last responsible moment computed from lead time and due date.

  • Standard class: pulled in FIFO order within its WIP allocation; no reordering without changing the item's class.

  • Intangible class: cost of delay is low or deferred; pulled only when capacity is otherwise idle, so it never displaces value-bearing work.

  • A policy is a written rule that says who decides, on what information, within what limit; unwritten conventions are not policies and cannot be audited.

  • Capacity is designed, not discovered: set WIP limits per column and per class so total WIP equals the number of work items the system can finish at its current cycle time.

  • Definition of ready and definition of done are policies at the workflow boundaries; they gate entry and exit and prevent partial work from consuming capacity.

Quick reference

Improve (feedback loops, flow signals, next experiment)

  • Core flow metrics: WIP, throughput (items per period), cycle time (start to finish), and work item age (elapsed time since start for unfinished items).

  • Little's Law: average cycle time = average WIP / average throughput; use it to predict the effect of a WIP change before making it.

  • Lead time clock starts at customer request; cycle time clock starts when work begins; report which clock you use or numbers are not comparable.

  • Work item age is the earliest warning signal: items older than the 85th percentile of historical cycle time are at risk now, not at the deadline.

  • Cumulative flow diagram bands widening indicate a bottleneck upstream of the widening column; flat arrival and departure lines indicate balanced flow.

  • Feedback loop cadence: daily flow review on blocked and aging items, periodic retrospective on policies and classes of service, both tied to data not anecdote.

  • A next experiment is written as: hypothesis, change to one policy or limit, metric and threshold, time box, and decision rule for adopt or revert.

  • Change one variable per experiment; simultaneous changes to WIP limit, class policy, and staffing make the result uninterpretable.

Quick reference

See the whole system

  • Map the full value stream from customer request to customer outcome, including queues, handoffs, approvals, and rework loops, not just the team's own steps.

  • Local optimization test: an improvement that reduces one station's cycle time but increases total lead time has made the system worse.

  • Queues are the dominant cost in knowledge work; queue size grows with capacity utilization, so utilization near 100% produces long and unpredictable lead times.

  • Handoffs add wait time and information loss; count handoffs as a first-class metric when diagnosing delay.

  • Rework loops are hidden capacity drains; measure the percentage of items that return to an earlier stage to size the loss.

  • Bottleneck rule: system throughput is set by the constraint; improving non-constraint steps increases WIP, not output.

  • Feedback delays between cause and effect make the system feel unpredictable; shorten the loop before adding control mechanisms.

  • Variation exists in arrival rate and in processing time; policies should absorb variation (buffers, classes of service) rather than pretend it is absent.

Quick reference

Design with STATIK

  • STATIK stands for Systems Thinking Approach To Introducing Kanban; it is a six-step method for designing a kanban system for a specific context.

  • Step 1: understand what makes the service fit for purpose, identifying customer expectations and the sources of dissatisfaction.

  • Step 2: analyze demand, its sources, and its patterns (types, volumes, variability, predictability) to shape classes of service.

  • Step 3: analyze the system's capability, including capacity, skills, and current performance against demand.

  • Step 4: model the workflow by discovering the actual steps and handoffs, then visualize them on a board.

  • Step 5: identify classes of service and set explicit policies for each, including priority and WIP allocation.

  • Step 6: design the kanban system: WIP limits, cadences, and feedback meetings, then run it and iterate; STATIK is a design loop, not a one-time event.

  • STATIK output is a working system hypothesis; validate it against demand and capability data before scaling the board.

Quick reference

Make flow visible and use pull with intention

  • Visualize every work item as a card and every stage as a column; if work is not on the board it cannot be limited, measured, or pulled.

  • Blocked items are marked explicitly with the reason and the owner; blocked work still occupies WIP and must be counted.

  • Pull means a worker starts a new item only when capacity frees up under the WIP limit; push means assigning work regardless of capacity.

  • WIP limit rule: when a column is at its limit, stop starting and swarm on finishing; the limit is a commitment, not a suggestion.

  • Pull with intention means the pull decision uses class of service and age, not just availability; FIFO within class, age-based escalation for risk.

  • Board design must expose policies: classes of service, definitions of ready and done, and the WIP limit per column visible on the board itself.

  • Measure flow from the board: count items in each column, compute work item age, and plot cumulative flow to see where work accumulates.

  • Explicit pull signals replace verbal coordination; the signal is the empty slot under the limit, so the system self-regulates without a dispatcher.