Engineer Building Facilities flashcards
Engineer Building Facilities · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Chiller kW per ton
- Efficiency metric equal to 3.517 divided by COP. A chiller drawing 0.6 kW per ton runs at a COP of about 5.9, and a lower kW per ton means better efficiency.
- Fan affinity laws
- At constant air density, airflow varies with fan speed, static pressure with speed squared, and brake horsepower with speed cubed. Halving speed cuts power to one-eighth.
- Cooling tower approach
- The difference between leaving condenser-water temperature and entering wet-bulb temperature. A design approach of 3–7°F shows how closely the tower reaches the ambient wet bulb.
- Economizer changeover setpoint
- The outdoor-air condition at which the air-side economizer enables or disables free cooling, commonly 55–65°F dry bulb or an enthalpy comparison against return air.
- Fixture trap seal
- The water depth held in a plumbing trap, normally 2–4 inches, which blocks sewer gas. Evaporation in unused fixtures requires trap primers or trap guards.
- Power factor
- The ratio of real power in kW to apparent power in kVA. Utilities may bill a penalty below roughly 0.90, and capacitor banks or synchronous motors correct a low value.
- Elevator Phase I recall
- Automatic or keyed recall of elevator cars to a designated floor on smoke-detector alarm, with normal power operation disabled so firefighters can use the car under Phase II.
- Span of control
- The number of direct reports one supervisor manages. Three to seven is the usual range; wider spans demand standardized work, fewer exceptions, and experienced staff.
- FTE calculation
- Annual labor hours required divided by the productive hours one full-time employee delivers, generally 1,750–1,850 after vacation, holidays, sick leave, and training are removed.
- Mean time to repair
- Total downtime divided by the number of repair events in a period. MTTR measures how quickly the team restores equipment and feeds availability calculations.
- Availability metric
- Mean time between failures divided by the sum of MTBF and MTTR, expressed as a percentage. Ninety-nine percent availability allows roughly 87.6 hours of unplanned downtime yearly.
- Progressive discipline
- A documented escalation of corrective action, typically verbal warning, written warning, suspension, then termination, applied consistently so employees receive clear notice and a chance to improve.
- Work order backlog
- Open work orders divided by the average weekly completion rate, expressed in weeks. A backlog beyond four to six weeks signals a staffing shortfall or a scheduling bottleneck.
- NYC high-rise definition
- Under the NYC Building Code, a building with an occupied floor located more than 75 feet above the lowest level of fire department vehicle access.
- FISP facade inspection
- NYC Facade Inspection Safety Program: exterior walls and appurtenances of buildings more than six stories are inspected every five years and filed as Safe, SWARMP, or Unsafe.
- Local Law 97
- NYC carbon-emissions caps for buildings over 25,000 square feet, with limits for 2024–2029 and stricter 2030–2034 limits; annual reports are filed and overages incur per-ton penalties.
- Fire Safety Director
- An FDNY-certified coordinator required in designated high-rise office, hotel, and other occupancies, responsible for the fire safety plan, staff training, drills, and the lobby command station.
- NFPA 25 monthly check
- Sprinkler system gauge readings and valve positions are inspected monthly; annual work includes main drain flow tests, alarm tests, and valve operation by a qualified contractor.
- ACP-5 filing
- A NYC DEP asbestos inspection form certifying whether asbestos-containing material is present before renovation or demolition; a copy must be on site before suspect materials are disturbed.
- Generator load test
- NFPA 110 requires weekly generator exercise plus periodic load testing; Level 1 emergency systems typically get an annual test at 30 percent or more of nameplate for 30 minutes.
- Three-way match
- A control that compares the purchase order, receiving report, and vendor invoice for quantity and price agreement before accounts payable releases payment to the supplier.
- Retainage
- A percentage, usually 5–10 percent, withheld from each progress payment until substantial completion and punch-list closeout, protecting the owner against incomplete or defective work.
- Simple payback
- Capital cost divided by annual net savings, expressed in years. It is easy to communicate but ignores the time value of money and any savings after payback.
- Deferred maintenance ratio
- The deferred maintenance backlog divided by the current replacement value of the asset base. Industry benchmarks flag ratios above roughly 2–5 percent as a growing capital risk.
- IDIQ contract
- Indefinite delivery, indefinite quantity: a pre-priced umbrella contract with one or more vendors for recurring or unpredictable work, ordered by task or delivery orders over a stated term.
- Liquidated damages
- A pre-agreed per-day sum a contractor owes for late completion. Courts enforce it only when it reasonably forecasts the owner's actual loss rather than acting as a penalty.
- Sensible heat equation
- Q in Btu per hour equals 1.08 times airflow in CFM times the dry-bulb temperature difference in degrees Fahrenheit across the coil or space.
- Water heating equation
- Q in Btu per hour equals 500 times flow in gallons per minute times the temperature difference in Fahrenheit, where 500 reflects water density of 8.33 pounds per gallon.
- Refrigeration ton
- A cooling rate equal to 12,000 Btu per hour, 200 Btu per minute, or 3.517 kilowatts, originally defined as heat absorbed melting one ton of ice daily.
- Pump brake horsepower
- Brake horsepower equals gallons per minute times total head in feet times specific gravity, divided by 3,960 times the pump efficiency expressed as a decimal.
- Three-phase power formula
- Kilowatts equal the square root of three, multiplied by volts, amps, and power factor, then divided by 1,000 for a balanced three-phase load.
- Lumen method
- Average illuminance in footcandles equals lumens per lamp times lamp count times coefficient of utilization times light loss factor, divided by floor area in square feet.