Engineer Building Facilities key terms
Engineer Building Facilities · Get comfortable with the vocabulary.
- Air handling unit (AHU)
- Related: Chiller, Variable air volume (VAV) box, Building automation system (BAS)
A factory-built or field-assembled cabinet containing coils, filters, dampers, and one or more fans that conditions and distributes air through ductwork to the spaces it serves.
- Chiller
- Related: Cooling tower, Air handling unit (AHU), Ton of refrigeration
A refrigeration machine that removes heat from water or another secondary fluid and rejects it at a condenser, supplying chilled water to air handling units and terminal cooling equipment in a building.
- Cooling tower
- Related: Chiller, Backflow preventer
An open heat-rejection device that evaporates part of the circulating water to release condenser heat to the atmosphere; it serves chillers and process loads and needs water treatment and drift control.
- Variable air volume (VAV) box
- Related: Air handling unit (AHU), Building automation system (BAS), Economizer
A terminal unit with a damper that varies supply airflow to a zone in response to thermostat demand, often paired with a reheat coil, while the central fan maintains duct static pressure.
- Economizer
- Related: Air handling unit (AHU), Building automation system (BAS)
A control strategy that admits outdoor air for free cooling when outdoor temperature or enthalpy is favorable, reducing mechanical cooling; it depends on linked damper actuators and verified changeover sensors.
- Building automation system (BAS)
- Related: Variable air volume (VAV) box, Economizer, Computerized maintenance management system (CMMS)
A networked digital control system that monitors and commands HVAC, lighting, power, and other equipment using sensors, controllers, and schedules to hold setpoints and generate alarms and trend data.
- Standby generator
- Related: Uninterruptible power supply (UPS), Phase I elevator recall
An engine-driven alternator with automatic transfer switching that supplies essential loads such as egress lighting, fire pumps, elevators, and life-safety systems when normal utility power fails.
- Uninterruptible power supply (UPS)
- Related: Standby generator, Building automation system (BAS)
A battery or flywheel-backed power conditioner that carries critical loads without interruption during a utility outage or source transfer, bridging the gap until a generator accepts load.
- Backflow preventer
- Related: Cooling tower, Preventive maintenance (PM)
An assembly of check valves and relief ports installed to stop reverse flow of contaminated water into the potable supply; it requires periodic testing by a certified tester and code recordkeeping.
- Span of control
- Related: Full-time equivalent (FTE), Performance improvement plan
The number of subordinates reporting directly to one supervisor; narrow spans suit complex or safety-critical work, while wide spans cut cost but demand stronger procedures and staff competence.
- Work order
- Related: Computerized maintenance management system (CMMS), Preventive maintenance (PM), Key performance indicator (KPI)
A written or electronic authorization describing a maintenance task, its location, priority, labor and material estimates, and completion record; it is the basic unit for tracking cost and backlog.
- Key performance indicator (KPI)
- Related: Work order, Mean time between failures (MTBF), Service level agreement (SLA)
A measurable value chosen to show how well an operation meets a goal, such as work order completion rate, mean time to repair, energy use per square foot, or customer satisfaction.
- Collective bargaining agreement
- Related: Span of control, Performance improvement plan
A negotiated contract between an employer and a certified union that sets wages, hours, job classifications, seniority, discipline, and grievance procedures, and legally binds both parties.
- Performance improvement plan
- Related: Span of control, Key performance indicator (KPI)
A documented, time-limited process that states specific deficiencies, measurable expectations, support offered, and review dates for an employee whose work has fallen below standard.
- Full-time equivalent (FTE)
- Related: Span of control, Capital improvement plan
A staffing measure in which one FTE equals one person working a standard full schedule; part-time and overtime hours are converted so workload can be compared across shifts and budgets.
- Certificate of Occupancy
- Related: Means of egress, Occupant load
A document issued by the buildings department certifying that a structure complies with approved plans and codes for its stated use and occupancy, required before the space may be legally occupied.
- Means of egress
- Related: Occupant load, Certificate of Occupancy, Fire safety director
The continuous and unobstructed path from any point in a building to a public way, made up of exit access, the exit itself, and exit discharge.
- Occupant load
- Related: Means of egress, Certificate of Occupancy
The number of people a space is designed to hold, computed from code area factors or fixed seating; it sets egress width, required exits, and plumbing fixture counts.
- Fire safety director
- Related: Phase I elevator recall, Means of egress, Fire damper
A person certified by the fire department to implement a building's fire safety plan, train occupants and staff, run drills, and coordinate with responding firefighters during an incident.
- Phase I elevator recall
- Related: Fire safety director, Standby generator
A fire alarm function that automatically returns elevators to a designated landing, opens the doors, and parks them so occupants are not trapped and firefighters gain control.
- Fire damper
- Related: Fire safety director, Means of egress
A rated assembly inside ductwork that closes on heat to preserve the fire resistance of the wall or floor it penetrates; it must be inspected and tested on a documented cycle.
- Lockout/tagout (LOTO)
- Related: Standby generator, Preventive maintenance (PM)
A written procedure and hardware system that isolates hazardous energy, applies locks and tags, and verifies zero energy before service, protecting workers from unexpected startup or stored energy release.
- Local Law 97
- Related: Capital improvement plan, Chiller
A New York City law setting carbon emission limits for buildings over 25,000 square feet, with annual reporting and penalties above the caps, driving retrofits and electrification.
- Preventive maintenance (PM)
- Related: Work order, Computerized maintenance management system (CMMS), Deferred maintenance
Scheduled servicing performed on equipment at time or usage intervals to prevent failures, preserve warranties, and sustain efficiency; tasks are generated from each asset's maintenance plan.
- Deferred maintenance
- Related: Capital improvement plan, Preventive maintenance (PM)
Work that is necessary but postponed for budget or operational reasons; the accumulated backlog raises failure risk and energy cost and should be measured, prioritized, and funded.
- Capital improvement plan
- Related: Deferred maintenance, Net present value, Local Law 97
A multi-year schedule of major repairs, replacements, and upgrades with cost estimates and funding sources, aligning budgets with asset condition assessments and long-term facility needs.
- Purchase requisition
- Related: Request for proposal (RFP), Service level agreement (SLA)
An internal request that starts procurement by identifying goods or services needed, quantity, justification, account code, and required date, subject to approval before a purchase order is issued.
- Request for proposal (RFP)
- Related: Purchase requisition, Service level agreement (SLA)
A solicitation that states the problem, scope, and evaluation criteria and asks vendors to propose solutions and pricing; used when best value requires judgment beyond lowest bid.
- Service level agreement (SLA)
- Related: Key performance indicator (KPI), Request for proposal (RFP)
A contract schedule defining measurable performance obligations such as response time, uptime, cleaning frequency, and remedies for shortfall, used to manage vendors and in-house expectations.
- Computerized maintenance management system (CMMS)
- Related: Work order, Preventive maintenance (PM), Mean time between failures (MTBF)
Software that holds the asset register and generates, assigns, and closes work orders while capturing labor, parts, and history data used for planning and budget analysis.
- Ton of refrigeration
- Related: Chiller, Air handling unit (AHU)
A cooling rate equal to 12,000 British thermal units per hour, roughly the heat needed to melt one ton of ice in a day; equipment capacity is commonly stated in tons.
- R-value
- Related: Simple payback, Capital improvement plan
A material's resistance to heat flow, expressed in square feet times degrees Fahrenheit hours per BTU; higher values mean better insulation, and assemblies add layer resistances in series.
- Affinity laws
- Related: Variable air volume (VAV) box, Power factor
Relations describing how fan or pump flow, head, and power change with speed: flow varies with speed, head with its square, and power with its cube, for geometrically similar machines.
- Power factor
- Related: Affinity laws, Uninterruptible power supply (UPS)
The ratio of real power in kilowatts to apparent power in kilovolt-amperes; low values signal inefficiency and utility penalties, often corrected with capacitors or synchronous equipment.
- Simple payback
- Related: Net present value, Capital improvement plan
The number of years for annual savings to repay an investment's initial cost, computed as cost divided by yearly savings; easy to communicate but blind to the time value of money.
- Net present value
- Related: Simple payback, Capital improvement plan
The sum of a project's future cash flows discounted to today at a chosen rate, minus initial cost; a positive result means the investment earns more than the required return.
- Mean time between failures (MTBF)
- Related: Work order, Key performance indicator (KPI), Preventive maintenance (PM)
For repairable equipment, total operating time divided by the number of failures in that period; it estimates reliability and informs spare parts stocking and replacement planning.