Quick reference

Engineering Fundamentals and Applied Science

  • Stress σ = F/A; axial strain ε = ΔL/L; Hooke's law σ = Eε holds only in the linear-elastic range below yield strength.

  • Factor of safety FS = failure stress / allowable stress; for static ductile design FS is typically 1.5-3, higher where loads are uncertain.

  • Beam bending: σ = Mc/I and deflection scales with wL⁴/(EI); doubling span increases deflection 16× for uniform load.

  • Thermodynamics first law for a closed system: Q − W = ΔU; for steady-flow open systems use enthalpy, Q − W = Δh + ΔKE + ΔPE.

  • Carnot efficiency η = 1 − T_cold/T_hot with absolute temperatures; no real cycle exceeds it.

  • Ohm's law V = IR; power P = VI = I²R = V²/R; three-phase real power P = √3 V_LL I_L cos φ.

  • Fluid continuity A₁V₁ = A₂V₂; Bernoulli p/γ + V²/2g + z = constant along a streamline for steady, incompressible, frictionless flow.

  • Reynolds number Re = ρVD/μ; flow is generally laminar below Re ≈ 2,000 in pipes and turbulent above ≈ 4,000.

  • Unit conversions: 1 hp = 550 ft·lbf/s = 0.7457 kW; 1 psi = 6.895 kPa; 1 Btu = 1.055 kJ.

Quick reference

Design and Analysis

  • Design for static ductile failure uses the von Mises (distortion energy) criterion; brittle materials are assessed with the maximum principal stress or Mohr-Coulomb criterion.

  • Stress concentration factor K_t multiplies nominal stress at geometric discontinuities; fatigue notch factor K_f = 1 + q(K_t − 1), where q is notch sensitivity.

  • S-N curve: fatigue life is finite above the endurance limit and effectively infinite below it for steels; nonferrous metals often lack a true endurance limit.

  • Miner's rule for variable amplitude fatigue: Σ(n_i/N_i) = 1 at predicted failure, where N_i is cycles to failure at stress level i.

  • Shaft design under combined bending and torsion: τ_max = (16/πd³)√(M² + T²) for a solid round shaft (maximum shear stress theory).

  • Gear ratio = N_driven/N_driver = ω_driver/ω_driven; torque ratio is the inverse of the speed ratio for an ideal gear pair.

  • Welded joint throat thickness t = 0.707w for a 45° fillet weld of leg size w; weld capacity = allowable stress × throat × length.

  • Bolted joint preload should exceed the external separating load to maintain clamp force; joint separation occurs when external load exceeds preload divided by the joint constant complement.

  • Tolerance stack-up: worst-case assembly variation equals the sum of individual tolerances; statistical (RSS) stack-up uses the square root of the sum of squares.

Quick reference

Project Planning and Management

  • Critical path is the longest-duration path through the network; it determines minimum project duration and has zero total float.

  • Total float = LS − ES = LF − EF; a critical activity has total float of zero.

  • Earned value: CV = EV − AC (positive is under budget); SV = EV − PV (positive is ahead of schedule).

  • Earned value indices: CPI = EV/AC and SPI = EV/PV; values below 1.0 indicate cost overrun or schedule slippage respectively.

  • Estimate at completion EAC = BAC/CPI when current cost performance is expected to continue; EAC = AC + (BAC − EV) when remaining work proceeds at planned rate.

  • PERT expected duration t_E = (O + 4M + P)/6; standard deviation σ = (P − O)/6.

  • Risk exposure = probability × consequence; risk response options are avoid, mitigate, transfer, and accept.

  • Scope change control requires a documented change request, impact assessment on cost and schedule, and formal approval before implementation.

Quick reference

Codes, Standards, and Regulatory Compliance

  • ASME Boiler and Pressure Vessel Code Section VIII governs pressure vessel design; Section I covers power boilers; Section IX covers welding qualification.

  • ASME B31.3 applies to process piping; B31.1 applies to power piping; the applicable code is selected by service and jurisdiction, not preference.

  • ASME Section IX welding procedure qualification is documented by a PQR supporting a WPS; welder performance qualification is separate and documented by WPQ.

  • ISO 9001 is a quality management system standard with process approach and risk-based thinking; certification is by accredited third-party bodies.

  • ISO 14001 specifies environmental management system requirements; ISO 45001 covers occupational health and safety management systems.

  • API 510 covers in-service inspection of pressure vessels; API 570 covers in-service piping inspection; API 653 covers aboveground storage tanks.

  • OSHA 29 CFR 1910 Subpart H regulates hazardous materials including compressed gases and flammable liquids in general industry.

  • ASME BPV Code Section VIII Division 1 maximum allowable stress values are tabulated by material and temperature in Section II Part D.

  • Jurisdictional requirements (state or local) can be stricter than the referenced national code; the more stringent requirement governs.

Quick reference

Health, Safety, and Environmental Protection

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, personal protective equipment.

  • Permit-required confined space: hazardous atmosphere, engulfment potential, internal configuration entrapment, or other recognized serious hazard; entry requires permit, atmospheric testing, attendant, and rescue plan.

  • Lockout/tagout (29 CFR 1910.147) requires energy isolation, verification of zero energy state, and removal only by the authorized employee who applied the lock.

  • Flammable liquid flash point and autoignition temperature determine storage and electrical classification; Class I locations require appropriately rated equipment.

  • LEL and UEL define flammable range in air; gas detection alarms are typically set at 10% and 25% LEL for combustible gas.

  • Hazardous waste generator status under RCRA depends on monthly generation rate; large quantity generators must meet stricter accumulation and reporting rules.

  • Incident investigation root cause analysis distinguishes immediate causes from underlying management-system causes; corrective actions should address the latter.

  • Personal protective equipment is the last line of defense and must be selected based on hazard assessment, fit-tested, and inspected before use.

Quick reference

Quality Assurance and Testing

  • Destructive testing includes tensile, Charpy impact, and hardness tests; nondestructive testing includes visual, liquid penetrant, magnetic particle, ultrasonic, and radiographic methods.

  • Liquid penetrant testing detects surface-breaking discontinuities in nonporous materials; magnetic particle testing applies only to ferromagnetic materials.

  • Ultrasonic testing detects internal flaws and measures thickness; radiographic testing reveals internal density variations but requires radiation safety controls.

  • Hydrostatic test pressure for pressure vessels is typically 1.3 times the maximum allowable working pressure multiplied by the ratio of allowable stress at test to design temperature.

  • Measurement system analysis: gauge repeatability and reproducibility (GR&R) below 10% of tolerance is generally acceptable; above 30% is unacceptable.

  • Control charts: X-bar and R charts monitor process mean and variation; a point beyond control limits or a nonrandom run signals special-cause variation.

  • Process capability Cp = (USL − LSL)/(6σ); Cpk accounts for centering and equals the lesser of (USL − μ)/(3σ) and (μ − LSL)/(3σ).

  • Calibration traceability requires an unbroken chain of comparisons to national or international standards, with documented uncertainty.

  • First article inspection verifies that the initial production item conforms to all drawing and specification requirements before full production.

Quick reference

Professional Ethics and Practice

  • Engineers shall hold paramount the safety, health, and welfare of the public in the performance of professional duties.

  • Engineers shall perform services only in areas of their competence and shall not affix a seal to work not prepared or directly supervised by them.

  • Conflict of interest must be disclosed promptly; accepting compensation from more than one party for the same service without disclosure is prohibited.

  • Engineers shall not reveal confidential client information without consent except where required by law or where public safety is endangered.

  • Professional misconduct includes falsifying credentials, plagiarism, and issuing misleading public statements; many jurisdictions require reporting of violations.

  • Continuing professional development requirements vary by jurisdiction; licenses are granted by state boards and are not nationally portable.

  • Sustainable development and environmental stewardship are part of professional responsibility; designs should consider lifecycle impacts.

  • When a safety concern is ignored by an employer, the engineer's obligation is to escalate internally and, if unresolved, to the appropriate authority.

Quick reference

Communication, Documentation, and Records

  • Technical reports should state purpose, methods, results, and conclusions, with assumptions and limitations explicitly identified.

  • As-built drawings reflect actual installed conditions and must be distinguished from design drawings; revisions are tracked through revision blocks.

  • A controlled document has an identified owner, revision status, distribution list, and retention period; obsolete copies are removed from use.

  • Record retention periods are set by contract, statute, and regulation; the longest applicable period governs.

  • Meeting minutes should record decisions, action items with owners and due dates, and dissenting opinions where material.

  • Email and electronic records are discoverable; professional communication should be factual, concise, and free of speculation.

  • Specifications define materials and workmanship; drawings define geometry and configuration; conflicts are resolved by the stated order of precedence in the contract.

  • Calculations should be checked and signed by a qualified second party; the checker's signature documents independent verification.