KSE Professional Engineer key terms
KSE Professional Engineer · Get comfortable with the vocabulary.
- Factor of Safety
- Related: Allowable Stress Design, Limit State Design, Yield Strength
The ratio of a structure's or component's ultimate capacity to the maximum load or stress it is expected to carry in service. It accounts for uncertainty in loads, material properties, and analysis methods.
- Yield Strength
- Related: Factor of Safety, Ultimate Tensile Strength, Stress-Strain Curve
The stress at which a material begins to deform permanently, marking the transition from elastic to plastic behaviour. It is a primary design property for ductile metals such as structural steel.
- Ultimate Tensile Strength
- Related: Yield Strength, Stress-Strain Curve
The maximum engineering stress a material can sustain before necking and fracture during a tension test. It is reported as the peak of the stress-strain curve and is not the same as yield strength.
- Stress-Strain Curve
- Related: Yield Strength, Ultimate Tensile Strength, Modulus of Elasticity
A plot of applied stress against resulting strain for a material under load. Its elastic region, yield point, strain hardening, and fracture point reveal stiffness, strength, and ductility.
- Modulus of Elasticity
- Related: Stress-Strain Curve, Deflection
The slope of the linear elastic portion of a stress-strain curve, describing a material's stiffness. Also called Young's modulus, it is used to compute elastic deformation under service loads.
- Limit State Design
- Related: Factor of Safety, Load Combination, Allowable Stress Design
A design method that verifies a structure against specified ultimate and serviceability limit states using factored loads and factored resistances. It replaces a single global safety factor with partial factors.
- Allowable Stress Design
- Related: Factor of Safety, Limit State Design
A design approach in which computed service stresses must not exceed a permissible stress obtained by dividing material strength by a factor of safety. It is also called working stress design.
- Load Combination
- Related: Limit State Design, Dead Load, Serviceability Limit State
A defined arrangement of simultaneous load effects, such as dead, live, wind, and seismic, multiplied by load factors. Design codes specify which combinations must be checked for strength and serviceability.
- Dead Load
- Related: Live Load, Load Combination
The permanent, self-weight loading on a structure, including structural members, finishes, and fixed equipment. Its magnitude is usually calculated from material densities and is treated as constant over the design life.
- Live Load
- Related: Dead Load, Load Combination
A variable load produced by occupancy, use, or movable equipment, such as people, furniture, or stored goods. Design codes prescribe characteristic values that depend on the intended occupancy or use of the space.
- Serviceability Limit State
- Related: Limit State Design, Deflection, Load Combination
A design condition concerning fitness for normal use rather than structural safety, covering deflection, vibration, and crack width. Exceeding it does not cause collapse but may impair function or appearance.
- Deflection
- Related: Serviceability Limit State, Modulus of Elasticity
The displacement of a structural element from its unloaded position under applied loads. It is checked against code or project limits to ensure serviceability, drainage, and the performance of supported finishes.
- Fatigue
- Related: Stress Concentration, Fracture Toughness
Progressive damage and possible failure of a material caused by repeated or fluctuating stress cycles below its static strength. It is assessed using stress range, cycle count, and detail category S-N data.
- Stress Concentration
- Related: Fatigue, Fracture Toughness
A local increase in stress near a geometric discontinuity such as a hole, notch, or sharp change in section. It is quantified by a stress concentration factor and is significant in fatigue-sensitive details.
- Fracture Toughness
- Related: Fatigue, Stress Concentration, Non-Destructive Testing
A material property describing its resistance to propagation of an existing crack under load, commonly expressed as critical stress intensity. It is central to fitness-for-service and flaw assessment.
- Thermodynamic Efficiency
- Related: Heat Exchanger Effectiveness
The ratio of useful work or energy output to energy input for a cycle or device, such as a heat engine or pump. It is bounded by the Carnot limit for heat engines operating between given temperatures.
- Heat Exchanger Effectiveness
- Related: Thermodynamic Efficiency
The ratio of actual heat transfer in a heat exchanger to the maximum thermodynamically possible transfer between the two fluid streams. It depends on flow arrangement and the number of transfer units.
- Reynolds Number
- Related: Darcy-Weisbach Equation, Pump Curve
A dimensionless ratio of inertial to viscous forces in fluid flow, used to predict whether flow is laminar or turbulent and to correlate friction and heat transfer data.
- Darcy-Weisbach Equation
- Related: Reynolds Number, Pump Curve
A relationship expressing head loss in pipe flow as a function of friction factor, pipe length and diameter, and velocity head. It is widely used for sizing pipes and assessing pumping requirements.
- Pump Curve
- Related: Darcy-Weisbach Equation, Reynolds Number
A manufacturer's plot of pump head, efficiency, and power against flow rate at a given impeller speed. Intersecting it with the system curve identifies the operating point.
- Bill of Quantities
- Related: Work Breakdown Structure, Critical Path Method, Earned Value Management
A priced or unpriced schedule listing measured quantities of work items, prepared from drawings and specifications. It supports tendering, progress valuation, and cost control on construction projects.
- Work Breakdown Structure
- Related: Critical Path Method, Earned Value Management, Bill of Quantities
A hierarchical decomposition of project scope into manageable deliverables and work packages. It forms the basis for estimating, scheduling, assigning responsibility, and controlling progress.
- Critical Path Method
- Related: Work Breakdown Structure, Earned Value Management, Float
A scheduling technique that models activities and dependencies to identify the longest path through the network. Activities on that path have zero float and determine the project duration.
- Float
- Related: Critical Path Method
The amount of time an activity can be delayed without delaying the project completion or a subsequent activity. Total float and free float are distinguished in network schedule analysis.
- Earned Value Management
- Related: Critical Path Method, Work Breakdown Structure, Change Order
A project control technique comparing planned value, earned value, and actual cost to measure cost and schedule performance. Derived indices forecast completion cost and flag emerging variances.
- Change Order
- Related: Earned Value Management, Request for Information
A formal, documented instruction to modify contract scope, schedule, or price after the agreement is executed. It requires authorization and is recorded to preserve traceability and support claims.
- Request for Information
- Related: Change Order, Document Control, Shop Drawing
A formal written query issued during design or construction to clarify ambiguous documents, resolve conflicts, or confirm intent. Responses become part of the project record and may lead to change orders.
- Shop Drawing
- Related: Request for Information, Document Control, As-Built Drawing
A detailed fabrication or installation drawing prepared by a contractor or supplier from design documents. It is reviewed for conformance with design intent before manufacture or construction proceeds.
- As-Built Drawing
- Related: Shop Drawing, Document Control
A drawing revised to record the actual constructed configuration, dimensions, and installed equipment at project completion. It supports operation, maintenance, and future modification of the facility.
- Document Control
- Related: Request for Information, Quality Record, Design Review
The systematic management of document identification, revision, distribution, and retention so that only current approved versions are used. It underpins traceability and auditability in engineering organizations.
- Design Review
- Related: Verification and Validation, Document Control, Quality Record
A structured, documented examination of a design by qualified reviewers at defined stages to verify requirements, identify errors, and confirm interfaces. It may be internal or independent and is recorded as evidence.
- Verification and Validation
- Related: Design Review, Quality Record, Non-Conformance Report
Verification confirms that a product meets its specified requirements, while validation confirms it fulfils its intended use. Both are planned activities producing objective evidence of conformity.
- Non-Conformance Report
- Related: Corrective Action, Quality Record, Verification and Validation
A record describing a detected departure from specified requirements, its disposition, and corrective action. It triggers investigation and may require concession, rework, or rejection of the item.
- Corrective Action
- Related: Non-Conformance Report, Root Cause Analysis
Action taken to eliminate the cause of a detected non-conformity so that it does not recur. It differs from containment or correction, which address only the immediate nonconforming item.
- Root Cause Analysis
- Related: Corrective Action, Non-Conformance Report
A structured investigation method used to identify the underlying reason a problem occurred, rather than its symptoms. Common techniques include the five-whys, fishbone diagrams, and fault tree analysis.
- Quality Record
- Related: Document Control, Design Review, Non-Conformance Report
Documented evidence retained to demonstrate that activities affecting quality were performed to specified requirements. Records must be legible, identifiable, and retrievable for the defined retention period.
- Non-Destructive Testing
- Related: Fracture Toughness, Welding Procedure Specification
Inspection methods such as ultrasonic, radiographic, magnetic particle, and dye penetrant testing that reveal internal or surface defects without damaging the component. Qualification and acceptance criteria are code-specified.
- Welding Procedure Specification
- Related: Non-Destructive Testing, Code of Practice
A written document specifying the welding variables and parameters required to produce a sound joint for a given application. It is supported by procedure qualification records and used by qualified welders.
- Code of Practice
- Related: Standard, Regulatory Compliance, Welding Procedure Specification
A documented set of technical rules and accepted good practice adopted by a jurisdiction or industry body. Compliance may be mandatory by reference in regulation or contractual by agreement between parties.
- Standard
- Related: Code of Practice, Regulatory Compliance
A consensus-based technical document establishing requirements, specifications, or test methods for products, processes, or services. Standards become legally binding when referenced by regulation or contract.
- Regulatory Compliance
- Related: Code of Practice, Standard, Permit to Work
The state of conforming to applicable statutes, regulations, permits, and licence conditions governing an engineering activity. Evidence of compliance is typically documented and subject to inspection or audit.
- Permit to Work
- Related: Lockout-Tagout, Job Safety Analysis, Regulatory Compliance
A formal written authorization controlling high-risk work such as hot work, confined-space entry, or isolation of hazardous energy. It records precautions, isolations, and acceptance by authorized signatories.
- Lockout-Tagout
- Related: Permit to Work, Job Safety Analysis
A procedure for isolating hazardous energy sources and securing them with locks and tags before maintenance or repair. It prevents unexpected energization or release of stored energy that could injure workers.
- Job Safety Analysis
- Related: Permit to Work, Hierarchy of Controls, Hazard Identification
A method of breaking a task into steps and identifying hazards and controls for each step before work begins. The results are communicated to the work crew and reviewed as conditions change.
- Hierarchy of Controls
- Related: Job Safety Analysis, Hazard Identification
A ranked order of risk control measures: elimination, substitution, engineering controls, administrative controls, and personal protective equipment. Higher-ranked controls are preferred because they are more reliable.
- Hazard Identification
- Related: Job Safety Analysis, Hierarchy of Controls, Risk Assessment
The systematic process of recognizing sources of potential harm to people, property, or the environment. It is the first step in risk assessment and informs the selection of control measures.
- Risk Assessment
- Related: Hazard Identification, Hierarchy of Controls
The process of estimating the likelihood and consequence of identified hazards and evaluating whether risk is tolerable. It determines priorities and the need for additional controls.
- Environmental Impact Assessment
- Related: Regulatory Compliance, Risk Assessment
A formal process predicting the environmental consequences of a proposed project and identifying mitigation measures before approval. It typically includes public consultation and produces a documented statement for the regulator.
- Conflict of Interest
- Related: Professional Negligence, Confidentiality
A situation in which a professional's personal, financial, or other interest could improperly influence engineering judgement or decisions. It must be disclosed promptly and managed or avoided.
- Professional Negligence
- Related: Standard of Care, Conflict of Interest, Signing and Sealing
A failure to exercise the reasonable skill, care, and diligence expected of a competent practitioner in similar circumstances, causing loss. It is judged against accepted professional standards, not outcomes alone.
- Standard of Care
- Related: Professional Negligence, Signing and Sealing
The degree of skill and diligence a reasonable and competent engineer would exercise under comparable circumstances. It is the benchmark used to judge professional performance and alleged negligence.
- Signing and Sealing
- Related: Standard of Care, Professional Negligence, Confidentiality
The act by which a licensed professional engineer takes legal responsibility for engineering work by applying a signature and seal. It is generally limited to work within the licensee's competence and jurisdiction.
- Confidentiality
- Related: Conflict of Interest, Document Control
The professional obligation to protect client and employer information from unauthorized disclosure, subject to legal or safety exceptions. It continues after the working relationship ends unless released.
- Technical Report
- Related: Document Control, Design Review, Technical Specification
A structured document presenting objectives, methods, results, analysis, and conclusions of an engineering investigation for a defined audience. It must be accurate, traceable, and distinguish facts from opinions.
- Technical Specification
- Related: Technical Report, Verification and Validation, Standard
A document stating the technical requirements a product, material, or work must satisfy, including performance, testing, and acceptance criteria. It is referenced in contracts and used to verify conformity.