Factor of Safety

The ratio of a structure's or component's ultimate capacity to the maximum load or stress it is expected to carry in service. It accounts for uncertainty in loads, material properties, and analysis methods.

Related: Allowable Stress Design, Limit State Design, Yield Strength
Yield Strength

The stress at which a material begins to deform permanently, marking the transition from elastic to plastic behaviour. It is a primary design property for ductile metals such as structural steel.

Related: Factor of Safety, Ultimate Tensile Strength, Stress-Strain Curve
Ultimate Tensile Strength

The maximum engineering stress a material can sustain before necking and fracture during a tension test. It is reported as the peak of the stress-strain curve and is not the same as yield strength.

Related: Yield Strength, Stress-Strain Curve
Stress-Strain Curve

A plot of applied stress against resulting strain for a material under load. Its elastic region, yield point, strain hardening, and fracture point reveal stiffness, strength, and ductility.

Related: Yield Strength, Ultimate Tensile Strength, Modulus of Elasticity
Modulus of Elasticity

The slope of the linear elastic portion of a stress-strain curve, describing a material's stiffness. Also called Young's modulus, it is used to compute elastic deformation under service loads.

Related: Stress-Strain Curve, Deflection
Limit State Design

A design method that verifies a structure against specified ultimate and serviceability limit states using factored loads and factored resistances. It replaces a single global safety factor with partial factors.

Related: Factor of Safety, Load Combination, Allowable Stress Design
Allowable Stress Design

A design approach in which computed service stresses must not exceed a permissible stress obtained by dividing material strength by a factor of safety. It is also called working stress design.

Related: Factor of Safety, Limit State Design
Load Combination

A defined arrangement of simultaneous load effects, such as dead, live, wind, and seismic, multiplied by load factors. Design codes specify which combinations must be checked for strength and serviceability.

Related: Limit State Design, Dead Load, Serviceability Limit State
Dead Load

The permanent, self-weight loading on a structure, including structural members, finishes, and fixed equipment. Its magnitude is usually calculated from material densities and is treated as constant over the design life.

Related: Live Load, Load Combination
Live Load

A variable load produced by occupancy, use, or movable equipment, such as people, furniture, or stored goods. Design codes prescribe characteristic values that depend on the intended occupancy or use of the space.

Related: Dead Load, Load Combination
Serviceability Limit State

A design condition concerning fitness for normal use rather than structural safety, covering deflection, vibration, and crack width. Exceeding it does not cause collapse but may impair function or appearance.

Related: Limit State Design, Deflection, Load Combination
Deflection

The displacement of a structural element from its unloaded position under applied loads. It is checked against code or project limits to ensure serviceability, drainage, and the performance of supported finishes.

Related: Serviceability Limit State, Modulus of Elasticity
Fatigue

Progressive damage and possible failure of a material caused by repeated or fluctuating stress cycles below its static strength. It is assessed using stress range, cycle count, and detail category S-N data.

Related: Stress Concentration, Fracture Toughness
Stress Concentration

A local increase in stress near a geometric discontinuity such as a hole, notch, or sharp change in section. It is quantified by a stress concentration factor and is significant in fatigue-sensitive details.

Related: Fatigue, Fracture Toughness
Fracture Toughness

A material property describing its resistance to propagation of an existing crack under load, commonly expressed as critical stress intensity. It is central to fitness-for-service and flaw assessment.

Related: Fatigue, Stress Concentration, Non-Destructive Testing
Thermodynamic Efficiency

The ratio of useful work or energy output to energy input for a cycle or device, such as a heat engine or pump. It is bounded by the Carnot limit for heat engines operating between given temperatures.

Related: Heat Exchanger Effectiveness
Heat Exchanger Effectiveness

The ratio of actual heat transfer in a heat exchanger to the maximum thermodynamically possible transfer between the two fluid streams. It depends on flow arrangement and the number of transfer units.

Related: Thermodynamic Efficiency
Reynolds Number

A dimensionless ratio of inertial to viscous forces in fluid flow, used to predict whether flow is laminar or turbulent and to correlate friction and heat transfer data.

Related: Darcy-Weisbach Equation, Pump Curve
Darcy-Weisbach Equation

A relationship expressing head loss in pipe flow as a function of friction factor, pipe length and diameter, and velocity head. It is widely used for sizing pipes and assessing pumping requirements.

Related: Reynolds Number, Pump Curve
Pump Curve

A manufacturer's plot of pump head, efficiency, and power against flow rate at a given impeller speed. Intersecting it with the system curve identifies the operating point.

Related: Darcy-Weisbach Equation, Reynolds Number
Bill of Quantities

A priced or unpriced schedule listing measured quantities of work items, prepared from drawings and specifications. It supports tendering, progress valuation, and cost control on construction projects.

Related: Work Breakdown Structure, Critical Path Method, Earned Value Management
Work Breakdown Structure

A hierarchical decomposition of project scope into manageable deliverables and work packages. It forms the basis for estimating, scheduling, assigning responsibility, and controlling progress.

Related: Critical Path Method, Earned Value Management, Bill of Quantities
Critical Path Method

A scheduling technique that models activities and dependencies to identify the longest path through the network. Activities on that path have zero float and determine the project duration.

Related: Work Breakdown Structure, Earned Value Management, Float
Float

The amount of time an activity can be delayed without delaying the project completion or a subsequent activity. Total float and free float are distinguished in network schedule analysis.

Related: Critical Path Method
Earned Value Management

A project control technique comparing planned value, earned value, and actual cost to measure cost and schedule performance. Derived indices forecast completion cost and flag emerging variances.

Related: Critical Path Method, Work Breakdown Structure, Change Order
Change Order

A formal, documented instruction to modify contract scope, schedule, or price after the agreement is executed. It requires authorization and is recorded to preserve traceability and support claims.

Related: Earned Value Management, Request for Information
Request for Information

A formal written query issued during design or construction to clarify ambiguous documents, resolve conflicts, or confirm intent. Responses become part of the project record and may lead to change orders.

Related: Change Order, Document Control, Shop Drawing
Shop Drawing

A detailed fabrication or installation drawing prepared by a contractor or supplier from design documents. It is reviewed for conformance with design intent before manufacture or construction proceeds.

Related: Request for Information, Document Control, As-Built Drawing
As-Built Drawing

A drawing revised to record the actual constructed configuration, dimensions, and installed equipment at project completion. It supports operation, maintenance, and future modification of the facility.

Related: Shop Drawing, Document Control
Document Control

The systematic management of document identification, revision, distribution, and retention so that only current approved versions are used. It underpins traceability and auditability in engineering organizations.

Related: Request for Information, Quality Record, Design Review
Design Review

A structured, documented examination of a design by qualified reviewers at defined stages to verify requirements, identify errors, and confirm interfaces. It may be internal or independent and is recorded as evidence.

Related: Verification and Validation, Document Control, Quality Record
Verification and Validation

Verification confirms that a product meets its specified requirements, while validation confirms it fulfils its intended use. Both are planned activities producing objective evidence of conformity.

Related: Design Review, Quality Record, Non-Conformance Report
Non-Conformance Report

A record describing a detected departure from specified requirements, its disposition, and corrective action. It triggers investigation and may require concession, rework, or rejection of the item.

Related: Corrective Action, Quality Record, Verification and Validation
Corrective Action

Action taken to eliminate the cause of a detected non-conformity so that it does not recur. It differs from containment or correction, which address only the immediate nonconforming item.

Related: Non-Conformance Report, Root Cause Analysis
Root Cause Analysis

A structured investigation method used to identify the underlying reason a problem occurred, rather than its symptoms. Common techniques include the five-whys, fishbone diagrams, and fault tree analysis.

Related: Corrective Action, Non-Conformance Report
Quality Record

Documented evidence retained to demonstrate that activities affecting quality were performed to specified requirements. Records must be legible, identifiable, and retrievable for the defined retention period.

Related: Document Control, Design Review, Non-Conformance Report
Non-Destructive Testing

Inspection methods such as ultrasonic, radiographic, magnetic particle, and dye penetrant testing that reveal internal or surface defects without damaging the component. Qualification and acceptance criteria are code-specified.

Related: Fracture Toughness, Welding Procedure Specification
Welding Procedure Specification

A written document specifying the welding variables and parameters required to produce a sound joint for a given application. It is supported by procedure qualification records and used by qualified welders.

Related: Non-Destructive Testing, Code of Practice
Code of Practice

A documented set of technical rules and accepted good practice adopted by a jurisdiction or industry body. Compliance may be mandatory by reference in regulation or contractual by agreement between parties.

Related: Standard, Regulatory Compliance, Welding Procedure Specification
Standard

A consensus-based technical document establishing requirements, specifications, or test methods for products, processes, or services. Standards become legally binding when referenced by regulation or contract.

Related: Code of Practice, Regulatory Compliance
Regulatory Compliance

The state of conforming to applicable statutes, regulations, permits, and licence conditions governing an engineering activity. Evidence of compliance is typically documented and subject to inspection or audit.

Related: Code of Practice, Standard, Permit to Work
Permit to Work

A formal written authorization controlling high-risk work such as hot work, confined-space entry, or isolation of hazardous energy. It records precautions, isolations, and acceptance by authorized signatories.

Related: Lockout-Tagout, Job Safety Analysis, Regulatory Compliance
Lockout-Tagout

A procedure for isolating hazardous energy sources and securing them with locks and tags before maintenance or repair. It prevents unexpected energization or release of stored energy that could injure workers.

Related: Permit to Work, Job Safety Analysis
Job Safety Analysis

A method of breaking a task into steps and identifying hazards and controls for each step before work begins. The results are communicated to the work crew and reviewed as conditions change.

Related: Permit to Work, Hierarchy of Controls, Hazard Identification
Hierarchy of Controls

A ranked order of risk control measures: elimination, substitution, engineering controls, administrative controls, and personal protective equipment. Higher-ranked controls are preferred because they are more reliable.

Related: Job Safety Analysis, Hazard Identification
Hazard Identification

The systematic process of recognizing sources of potential harm to people, property, or the environment. It is the first step in risk assessment and informs the selection of control measures.

Related: Job Safety Analysis, Hierarchy of Controls, Risk Assessment
Risk Assessment

The process of estimating the likelihood and consequence of identified hazards and evaluating whether risk is tolerable. It determines priorities and the need for additional controls.

Related: Hazard Identification, Hierarchy of Controls
Environmental Impact Assessment

A formal process predicting the environmental consequences of a proposed project and identifying mitigation measures before approval. It typically includes public consultation and produces a documented statement for the regulator.

Related: Regulatory Compliance, Risk Assessment
Conflict of Interest

A situation in which a professional's personal, financial, or other interest could improperly influence engineering judgement or decisions. It must be disclosed promptly and managed or avoided.

Related: Professional Negligence, Confidentiality
Professional Negligence

A failure to exercise the reasonable skill, care, and diligence expected of a competent practitioner in similar circumstances, causing loss. It is judged against accepted professional standards, not outcomes alone.

Related: Standard of Care, Conflict of Interest, Signing and Sealing
Standard of Care

The degree of skill and diligence a reasonable and competent engineer would exercise under comparable circumstances. It is the benchmark used to judge professional performance and alleged negligence.

Related: Professional Negligence, Signing and Sealing
Signing and Sealing

The act by which a licensed professional engineer takes legal responsibility for engineering work by applying a signature and seal. It is generally limited to work within the licensee's competence and jurisdiction.

Related: Standard of Care, Professional Negligence, Confidentiality
Confidentiality

The professional obligation to protect client and employer information from unauthorized disclosure, subject to legal or safety exceptions. It continues after the working relationship ends unless released.

Related: Conflict of Interest, Document Control
Technical Report

A structured document presenting objectives, methods, results, analysis, and conclusions of an engineering investigation for a defined audience. It must be accurate, traceable, and distinguish facts from opinions.

Related: Document Control, Design Review, Technical Specification
Technical Specification

A document stating the technical requirements a product, material, or work must satisfy, including performance, testing, and acceptance criteria. It is referenced in contracts and used to verify conformity.

Related: Technical Report, Verification and Validation, Standard