- Punch list
- Related: Substantial completion, Retainage
A written record compiled near substantial completion that lists incomplete or defective work the contractor must correct before final payment and closeout are approved.
- Substantial completion
- Related: Punch list, Retainage
The stage when the work is sufficiently finished for the owner to use it for its intended purpose, triggering warranty start, retainage release, and punch list work.
- Retainage
- Related: Substantial completion, Mechanic's lien
A percentage of each payment withheld by the owner until the project reaches substantial or final completion, protecting against unfinished work or liens.
- Change order
- Related: Construction change directive, Request for information
A written modification signed by owner and contractor that adjusts contract scope, price, or schedule after the agreement is executed.
- Construction change directive
- Related: Change order, Request for information
A written owner instruction ordering a change before price and time are agreed, used when work must proceed and negotiation cannot wait.
- Request for information
- Related: Change order, As-built drawings
A formal written question from the contractor seeking clarification of drawings or specifications, answered by the design professional and logged as a project record.
- Mechanic's lien
- Related: Retainage, Lien waiver
A statutory claim recorded against a property by contractors or suppliers who were not paid, allowing forced sale to satisfy the debt.
- Lien waiver
- Related: Mechanic's lien, Retainage
A document in which a contractor or supplier gives up the right to file a lien, often required before each progress or final payment is released.
- Site inventory
- Related: Site analysis, Base map
The systematic collection of existing physical, biological, and regulatory data about a site, forming the factual base for analysis and design decisions.
- Site analysis
- Related: Site inventory, Suitability analysis
The interpretation of inventory data to identify opportunities, constraints, and relationships that shape a site's program and design concept.
- Suitability analysis
- Related: Site analysis, Overlay mapping
A mapping method that overlays site attributes such as slope, soils, and drainage to rank land areas for a proposed use.
- Base map
- Related: Site inventory, Contour line
A scaled drawing of existing site conditions, including contours, boundaries, utilities, and improvements, on which design work is overlaid.
- Contour line
- Related: Spot elevation, Grading
A line on a plan connecting points of equal elevation; spacing between contours indicates slope steepness and direction of drainage.
- Spot elevation
- Related: Contour line, Grading
A point labeled with its exact elevation, used to define grades at corners, inlets, and other locations that contours cannot describe precisely.
- Grading
- Related: Cut and fill, Finish grade
The planned reshaping of ground surfaces by cutting and filling to achieve desired elevations, drainage, and usable space.
- Cut and fill
- Related: Grading, Finish grade
The balance of soil removed from high areas and placed in low areas to reach design elevations, ideally minimizing off-site hauling.
- Finish grade
- Related: Grading, Rough grade
The final elevation and surface condition of the ground after construction, shown on grading plans and verified before planting or paving.
- Rough grade
- Related: Finish grade, Topsoil
An intermediate earthwork elevation, typically within a few tenths of a foot of finish grade, prepared before topsoil placement and fine shaping.
- Stormwater detention
- Related: Stormwater retention, Best management practice
Temporary storage of runoff in a basin or vault that releases it slowly, reducing peak flows to downstream channels and sewers.
- Stormwater retention
- Related: Stormwater detention, Infiltration rate
Permanent storage of runoff that does not discharge to surface waters, instead infiltrating, evaporating, or being reused on site.
- Best management practice
- Related: Stormwater detention, Infiltration rate
A structural or nonstructural technique used to control stormwater pollution and volume, such as bioswales, rain gardens, or silt fences.
- Infiltration rate
- Related: Percolation test, Soil texture
The speed at which water moves into soil, usually expressed in inches per hour, governing the feasibility of infiltration-based stormwater practices.
- Percolation test
- Related: Infiltration rate, Soil texture
A field test measuring how quickly water drops in a test hole, used to size infiltration systems and evaluate septic drainfields.
- Soil texture
- Related: Soil structure, Infiltration rate
The relative proportions of sand, silt, and clay particles in soil, which control drainage, water holding, and workability.
- Soil structure
- Related: Soil texture, Soil compaction
The arrangement of soil particles into aggregates or peds, affecting porosity, root penetration, and resistance to compaction.
- Soil compaction
- Related: Soil structure, Topsoil
The densification of soil by mechanical pressure, reducing pore space and water movement; often a construction damage requiring remediation.
- Topsoil
- Related: Rough grade, Soil compaction
The upper soil layer richest in organic matter and biological activity, typically stripped, stockpiled, and respread during site construction.
- Hydrozone
- Related: Irrigation efficiency, Xeriscaping
A planting area grouped by similar water needs, allowing irrigation to be scheduled by zone rather than uniformly across the landscape.
- Xeriscaping
- Related: Hydrozone, Irrigation efficiency
Landscape design that reduces or eliminates supplemental irrigation through appropriate plant selection, soil improvement, and efficient watering methods.
- Irrigation efficiency
- Related: Hydrozone, Xeriscaping
The share of applied water actually reaching plant root zones, improved through matched precipitation, pressure regulation, and scheduling adjustments.
- Construction specification
- Related: Detail drawing, General conditions
A written project document describing materials, workmanship, and execution requirements, organized by divisions or sections and read with the drawings.
- Detail drawing
- Related: Construction specification, Section drawing
A large-scale drawing showing how assemblies are built, including dimensions, materials, connections, and tolerances not visible on general plans.
- Section drawing
- Related: Detail drawing, Contour line
A view cut through a site or structure showing vertical relationships, such as wall construction, grades, and buried utilities.
- As-built drawings
- Related: Request for information, Record drawings
Marked-up drawings recording the actual constructed conditions, including field changes, dimensions, and locations, submitted at project closeout.
- Record drawings
- Related: As-built drawings, Punch list
A clean final set prepared by the design professional incorporating as-built information, often retained for future maintenance and renovation reference.
- General conditions
- Related: Construction specification, Mechanic's lien
Contract provisions defining the rights, duties, and procedures of owner, contractor, and design professional, including payment, changes, and dispute resolution.
- Zoning ordinance
- Related: Setback, Impervious cover limit
Local law regulating land use, density, setbacks, height, and other development standards for parcels within a municipality.
- Setback
- Related: Zoning ordinance, Buffer zone
The minimum required distance between a structure or improvement and a property line, lot line, or waterway established by code.
- Impervious cover limit
- Related: Zoning ordinance, Stormwater detention
A regulatory cap on the percentage of a site that may be covered by roofs, pavement, or other surfaces that block infiltration.
- Buffer zone
- Related: Setback, Wetland delineation
A protected strip of land along a waterway, wetland, or property edge that limits disturbance and filters runoff before it reaches sensitive areas.
- Wetland delineation
- Related: Buffer zone, Section 404 permit
The field determination of wetland boundaries using vegetation, soils, and hydrology criteria, often required before permitting work near waters.
- Section 404 permit
- Related: Wetland delineation, Buffer zone
A federal authorization required before discharging dredged or fill material into navigable waters, including many wetlands, in the United States.