LA Landscape · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Design and Construction Documentation & Project and Construction Administration

  • Map the full construction document set (cover sheet, general notes, layout/control plan, grading and drainage plan, planting plan, details, specifications) and state the purpose of each sheet type in your own words

  • Differentiate plan, section, elevation, and detail drawings by drafting one small sketch of each for a single site element such as a seat wall

  • Build a personal checklist of the ten most common CD coordination errors (dimension conflicts, missing north arrow, scale mismatch, callout gaps) and test it against a sample drawing set

  • Sequence the project delivery phases from schematic design through construction administration and note the deliverable produced at each phase

Your checkpoint

A one-page annotated CD sheet index plus a 10-item coordination checklist written from memory

Week 2

Design and Construction Documentation & Materials, Methods, and Construction Detailing

  • Draft a dimensioned detail of a typical paving edge condition showing base, subbase, edge restraint, and drainage slope

  • Compare three hardscape materials (unit pavers, poured concrete, decomposed granite) on cost, installation method, and maintenance

  • Explain how specification sections (Division 31 earthwork, Division 32 exteriors) align with the details shown on drawings

  • Identify the standard drawing conventions for spot elevations, slope arrows, and match lines

Your checkpoint

Two hand-drafted construction details with written spec notes for each

Week 3

Grading, Drainage, and Stormwater Management

  • Calculate slope percentage between two spot elevations and convert between percent grade and ratio

  • Design a grading plan for a small lot that directs surface flow away from a building and into a bioswale, showing spot elevations and flow arrows

  • Compute runoff volume for a 1-acre site using the rational method with a given runoff coefficient and rainfall intensity

  • Compare conveyance and infiltration practices (swales, dry wells, detention basins, permeable pavement) by function and siting constraint

  • Apply the concept of a drainage divide and explain how it shapes which areas drain to which outfall

Your checkpoint

A hand-drawn grading and drainage plan with a one-page runoff calculation and a practice-comparison table

Week 4

Inventory and Analysis & Soil, Water, and Vegetation Management

  • Assemble a site inventory checklist covering topography, soils, hydrology, vegetation, climate, and utilities

  • Interpret a soil textural triangle and a percolation test result to judge planting and infiltration suitability

  • Classify a plant list by water, light, and soil requirements and flag species that conflict with the site's conditions

  • Explain how soil compaction, pH, and organic matter affect establishment and what remediation each calls for

  • Read a topographic map to identify ridges, swales, and drainage patterns

Your checkpoint

A site inventory and analysis summary (one page of inventory, one page of analysis with opportunities and constraints) for a hypothetical site

Week 5

Project and Construction Administration & Materials, Methods, and Construction Detailing

  • Outline the construction administration workflow from pre-bid meeting through punch list and final payment

  • Explain the roles of the landscape architect, contractor, and owner in submittals, RFIs, change orders, and site observation

  • Draft a sample RFI and a sample change order response using correct professional tone and format

  • Detail a retaining wall or freestanding wall showing footing, drainage, reinforcement, and finish

Your checkpoint

A CA process flowchart plus one drafted RFI and one change order memo

Week 6

Site Planning and Land Use & Codes, Regulations, and Professional Practice

  • Distinguish zoning terms (setback, lot coverage, floor area ratio, buffer yard) and apply them to a sample parcel

  • Explain how accessibility standards and local stormwater ordinances constrain site layout

  • Compare site planning approaches for a mixed-use, residential, and park program

  • Identify the professional practice obligations around contracts, liability, and standard of care

  • Explain how easements, right-of-way, and utility corridors affect buildable area

Your checkpoint

A zoning and code compliance worksheet applied to one sample parcel, plus a short written summary of professional liability basics

Week 7

Communication and Documentation & Environmental and Cultural Resources

  • Write a graphic communication critique of one of your own earlier deliverables, identifying what a reviewer or client would misread

  • Draft a one-page design narrative that explains a site concept to a non-technical client

  • Identify cultural and environmental resources that trigger review (historic districts, wetlands, floodplains, habitat) and the typical review sequence

  • Explain how public participation and stakeholder input shape a site plan

Your checkpoint

A client-facing one-page design narrative plus a resource-review checklist for a sample site

Week 8

Project and Construction Administration & Inventory and Analysis & Design and Construction Documentation & Grading, Drainage, and Stormwater Management & Soil, Water, and Vegetation Management & Materials, Methods, and Construction Detailing & Site Planning and Land Use & Codes, Regulations, and Professional Practice & Communication and Documentation & Environmental and Cultural Resources

  • Take two timed practice exams under test conditions and log every missed question by domain

  • Re-study your three weakest domains using the logs from weeks 1 through 7

  • Recite from memory the grading formula, the runoff calculation, and the CD sheet sequence

  • Review your own deliverables for factual errors and correct them

Your checkpoint

A domain-by-domain error log with a corrected study sheet for each weak area

Milestones

Week 2: Can you produce a correct, dimensioned detail and explain every line on it without notes?

Week 4: Can you calculate slope, runoff, and soil suitability from raw site data and defend the resulting grading concept?

Week 6: Can you apply zoning terms and CA workflow steps to a new scenario and spot the errors in a flawed example?

Week 8: Practice exam scores improve over your week 1 baseline and no domain remains below your target threshold