LA Landscape · Give each week a clear focus.
8 weeks · About 7 hours per week
Design and Construction Documentation & Project and Construction Administration
Map the full construction document set (cover sheet, general notes, layout/control plan, grading and drainage plan, planting plan, details, specifications) and state the purpose of each sheet type in your own words
Differentiate plan, section, elevation, and detail drawings by drafting one small sketch of each for a single site element such as a seat wall
Build a personal checklist of the ten most common CD coordination errors (dimension conflicts, missing north arrow, scale mismatch, callout gaps) and test it against a sample drawing set
Sequence the project delivery phases from schematic design through construction administration and note the deliverable produced at each phase
Your checkpoint
A one-page annotated CD sheet index plus a 10-item coordination checklist written from memory
Design and Construction Documentation & Materials, Methods, and Construction Detailing
Draft a dimensioned detail of a typical paving edge condition showing base, subbase, edge restraint, and drainage slope
Compare three hardscape materials (unit pavers, poured concrete, decomposed granite) on cost, installation method, and maintenance
Explain how specification sections (Division 31 earthwork, Division 32 exteriors) align with the details shown on drawings
Identify the standard drawing conventions for spot elevations, slope arrows, and match lines
Your checkpoint
Two hand-drafted construction details with written spec notes for each
Grading, Drainage, and Stormwater Management
Calculate slope percentage between two spot elevations and convert between percent grade and ratio
Design a grading plan for a small lot that directs surface flow away from a building and into a bioswale, showing spot elevations and flow arrows
Compute runoff volume for a 1-acre site using the rational method with a given runoff coefficient and rainfall intensity
Compare conveyance and infiltration practices (swales, dry wells, detention basins, permeable pavement) by function and siting constraint
Apply the concept of a drainage divide and explain how it shapes which areas drain to which outfall
Your checkpoint
A hand-drawn grading and drainage plan with a one-page runoff calculation and a practice-comparison table
Inventory and Analysis & Soil, Water, and Vegetation Management
Assemble a site inventory checklist covering topography, soils, hydrology, vegetation, climate, and utilities
Interpret a soil textural triangle and a percolation test result to judge planting and infiltration suitability
Classify a plant list by water, light, and soil requirements and flag species that conflict with the site's conditions
Explain how soil compaction, pH, and organic matter affect establishment and what remediation each calls for
Read a topographic map to identify ridges, swales, and drainage patterns
Your checkpoint
A site inventory and analysis summary (one page of inventory, one page of analysis with opportunities and constraints) for a hypothetical site
Project and Construction Administration & Materials, Methods, and Construction Detailing
Outline the construction administration workflow from pre-bid meeting through punch list and final payment
Explain the roles of the landscape architect, contractor, and owner in submittals, RFIs, change orders, and site observation
Draft a sample RFI and a sample change order response using correct professional tone and format
Detail a retaining wall or freestanding wall showing footing, drainage, reinforcement, and finish
Your checkpoint
A CA process flowchart plus one drafted RFI and one change order memo
Site Planning and Land Use & Codes, Regulations, and Professional Practice
Distinguish zoning terms (setback, lot coverage, floor area ratio, buffer yard) and apply them to a sample parcel
Explain how accessibility standards and local stormwater ordinances constrain site layout
Compare site planning approaches for a mixed-use, residential, and park program
Identify the professional practice obligations around contracts, liability, and standard of care
Explain how easements, right-of-way, and utility corridors affect buildable area
Your checkpoint
A zoning and code compliance worksheet applied to one sample parcel, plus a short written summary of professional liability basics
Communication and Documentation & Environmental and Cultural Resources
Write a graphic communication critique of one of your own earlier deliverables, identifying what a reviewer or client would misread
Draft a one-page design narrative that explains a site concept to a non-technical client
Identify cultural and environmental resources that trigger review (historic districts, wetlands, floodplains, habitat) and the typical review sequence
Explain how public participation and stakeholder input shape a site plan
Your checkpoint
A client-facing one-page design narrative plus a resource-review checklist for a sample site
Project and Construction Administration & Inventory and Analysis & Design and Construction Documentation & Grading, Drainage, and Stormwater Management & Soil, Water, and Vegetation Management & Materials, Methods, and Construction Detailing & Site Planning and Land Use & Codes, Regulations, and Professional Practice & Communication and Documentation & Environmental and Cultural Resources
Take two timed practice exams under test conditions and log every missed question by domain
Re-study your three weakest domains using the logs from weeks 1 through 7
Recite from memory the grading formula, the runoff calculation, and the CD sheet sequence
Review your own deliverables for factual errors and correct them
Your checkpoint
A domain-by-domain error log with a corrected study sheet for each weak area
Milestones
Week 2: Can you produce a correct, dimensioned detail and explain every line on it without notes?
Week 4: Can you calculate slope, runoff, and soil suitability from raw site data and defend the resulting grading concept?
Week 6: Can you apply zoning terms and CA workflow steps to a new scenario and spot the errors in a flawed example?
Week 8: Practice exam scores improve over your week 1 baseline and no domain remains below your target threshold