SLIA Part III study materials
SLIA Part III study resources

SLIA Part III cheat sheet

SLIA Part III · Keep the key ideas within reach.

Quick reference

Architectural Practice and Professional Conduct

  • Professional registration: Architects are regulated by statutory bodies (e.g., ARB in the UK, NCARB in the US); practicing without registration is illegal and subject to penalties.

  • Code of conduct core principles: Competence, honesty, integrity, respect for others, and accountability for actions. Breach can lead to disciplinary action including erasure from the register.

  • Conflict of interest: Must be declared in writing to all parties; must not accept commissions where a conflict exists without informed consent from all parties.

  • Confidentiality: Client information must remain confidential unless disclosure is required by law or authorized by the client.

  • Professional indemnity insurance (PII): Typically required for practice; covers negligence claims. Architects should maintain cover for at least the statute of limitations period (often 6-12 years).

  • Advertising and promotion: Must be truthful and not misleading; cannot claim qualifications not held or use misleading titles.

  • Continuing professional development (CPD): Mandatory in many jurisdictions (e.g., 35 hours/year in the UK, including 20 hours in core subjects).

  • Fees and commissions: Must be agreed in writing before commencing work; cannot charge fees that are contingent on planning approval unless explicitly agreed.

  • Whistleblowing: Duty to report unsafe or illegal practices to relevant authorities; protected by law in many jurisdictions.

Quick reference

Building Law

  • Building regulations: Statutory instruments that set minimum standards for design and construction (e.g., structural safety, fire, accessibility, energy efficiency). Compliance is mandatory.

  • Planning permission: Required for development (building works, material change of use). Development without permission is a breach of planning control; enforcement action can include stop notices and demolition orders.

  • Party walls: Governed by the Party Wall etc. Act 1996 (UK). Requires notices for works affecting shared walls, excavations near neighboring foundations, and disputes resolved via surveyors.

  • Construction (Design and Management) Regulations 2015 (CDM): Duties on clients, designers, and contractors to manage health and safety. Principal Designer role required for projects with more than one contractor.

  • Building contracts: Common forms include JCT, NEC, FIDIC. Key elements: scope, price, time, payment terms, variations, termination, and dispute resolution.

  • Statutory approvals: Building regulations approval (via building control body) and planning permission are separate; both may be required. Also consider listed building consent, conservation area consent, and environmental permits.

  • Limitation periods: Contracts typically 6 years (simple contract) or 12 years (deed); tort claims usually 6 years from damage, with a 15-year longstop (UK).

  • Retention: Common in construction contracts (e.g., 5% withheld, half released on practical completion, remainder after defects period).

Quick reference

Statutory Approvals and Institute Regulation

  • Planning application process: Validation, consultation, determination (typically 8 weeks for minor, 13 weeks for major), and decision. Appeals to the Secretary of State (or equivalent) within 6 months.

  • Building regulations application: Full plans or building notice. Full plans decision within 5 weeks (or extended). Completion certificates issued on satisfactory completion.

  • Listed buildings: Listed building consent required for alterations affecting character. Works without consent are criminal offences.

  • Institute regulation (e.g., RIBA): Chartered practices must comply with RIBA Code of Practice; members must adhere to Code of Professional Conduct. Complaints handled by Professional Conduct Committee.

  • Architects Registration Board (ARB) (UK): Maintains register; sets standards for education and practice; investigates complaints of unacceptable professional conduct or serious professional incompetence.

  • Statutory consultee responses: Local authorities must consult bodies like Environment Agency, Historic England, and Highways Authority for certain applications.

  • Fees and charges: Planning fees vary by development type and size; building control fees are set by local authorities or approved inspectors.

  • Enforcement: Planning enforcement notices can require reversal of unauthorized works; building regulations enforcement can require removal or alteration of non-compliant work.

Quick reference

Project Management and Contract Administration

  • RIBA Plan of Work stages: 0 Strategic Definition, 1 Preparation and Brief, 2 Concept Design, 3 Developed Design, 4 Technical Design, 5 Manufacturing and Construction, 6 Handover and Close Out, 7 In Use.

  • Contract administration: Architect often acts as Contract Administrator under JCT contracts; role includes issuing instructions, certifying payments, and assessing extensions of time.

  • Payment certifying: Must act impartially; certify amounts due based on valuation and contract terms. Interim certificates at agreed intervals; final certificate at end of defects period.

  • Variations: Must be instructed in writing; valuation by agreement or by rates in contract or by fair valuation. Variations can affect time and cost.

  • Extensions of time (EOT): Contractor must give notice of delay; architect assesses entitlement based on relevant events. Failure to notify can bar claim.

  • Liquidated damages (LDs): Pre-agreed sum per period of delay; must be genuine estimate of loss, not a penalty. Architect certifies delay and LDs.

  • Practical completion: Stage when works are complete except for minor defects; triggers release of half retention, start of defects period, and insurance/risk transfer.

  • Defects liability period: Typically 12 months; contractor must rectify defects notified by architect. Final certificate after expiry.

  • Programme and progress: Architect monitors progress against programme; may instruct acceleration or resequencing if delay occurs.

Quick reference

Design, Technology and Professional Competence

  • Structural systems: Choice depends on span, load, and material. Common: steel frames (long span), concrete (high load), timber (sustainable, shorter spans), masonry (compressive strength).

  • Fire safety: Compartmentation (fire resistance periods e.g., 30/60/90 minutes), means of escape (travel distances), and fire suppression. Approved Document B (UK) provides guidance.

  • Thermal performance: U-values measure heat loss (W/m²K); lower is better. Target Fabric Energy Efficiency (FEE) and Dwelling Emission Rate (DER) for compliance with Part L.

  • Acoustics: Sound insulation requirements (e.g., Approved Document E). Impact and airborne sound; use mass, isolation, and absorption.

  • Accessibility: Approved Document M (UK) or ADA (US) sets standards for accessible routes, door widths, and sanitary facilities.

  • Sustainability: BREEAM, LEED, and Passivhaus are rating systems. Embodied carbon and operational energy are key considerations.

  • Building information modelling (BIM): ISO 19650 sets standards for information management. Level 2 BIM mandatory on UK public projects.

  • Professional competence: Architects must only undertake work within their competence; if not, must collaborate with specialists. Keep skills updated through CPD.