SLIA Part III flashcards
SLIA Part III · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Professional Indemnity Insurance
- Insurance covering architects against claims of negligence or breach of professional duty. Typically required for practice, with cover maintained for statute-barred periods (often 6-12 years).
- Conflict of Interest
- A situation where an architect's personal or financial interests could influence professional judgment. Must be declared in writing to all parties and managed with informed consent.
- Continuing Professional Development
- Mandatory learning activities to maintain and enhance professional competence. Many institutes require a minimum number of hours annually, including core subjects.
- Code of Conduct
- A set of ethical standards governing professional behavior, including competence, honesty, integrity, and accountability. Breaches can lead to disciplinary action or erasure from the register.
- Whistleblowing
- Reporting unsafe, illegal, or unethical practices to relevant authorities. Protected by law in many jurisdictions; architects have a duty to report serious concerns.
- Planning Permission
- Statutory approval required for development, including building works and material changes of use. Development without permission is a breach of planning control, subject to enforcement action.
- Building Regulations
- Statutory instruments setting minimum standards for design and construction, covering structural safety, fire, accessibility, and energy efficiency. Compliance is mandatory.
- Party Wall Act
- Legislation (e.g., UK Party Wall etc. Act 1996) governing works affecting shared walls or excavations near neighboring foundations. Requires notices and dispute resolution via surveyors.
- CDM Regulations
- Construction (Design and Management) Regulations 2015: impose health and safety duties on clients, designers, and contractors. Require a Principal Designer for projects with more than one contractor.
- Limitation Period
- Time limit for bringing legal claims. Contracts: typically 6 years (simple) or 12 years (deed). Tort: usually 6 years from damage, with a 15-year longstop (UK).
- Retention
- A percentage of contract sum withheld to ensure performance. Common: 5% withheld, half released on practical completion, remainder after defects period.
- Listed Building Consent
- Required for alterations affecting the character of a listed building. Works without consent are criminal offences; consent is separate from planning permission.
- Building Control Approval
- Statutory approval via full plans or building notice. Ensures compliance with building regulations; completion certificate issued on satisfactory completion.
- Architects Registration Board
- UK statutory regulator maintaining the architects' register, setting education and practice standards, and investigating complaints of misconduct or incompetence.
- Planning Appeal
- Challenge to a planning decision, typically lodged within 6 months. Appeals are determined by the Secretary of State (or equivalent) following a written representation, hearing, or inquiry.
- RIBA Plan of Work
- Eight-stage framework for design and construction: 0 Strategic Definition, 1 Preparation and Brief, 2 Concept Design, 3 Developed Design, 4 Technical Design, 5 Construction, 6 Handover, 7 In Use.
- Contract Administrator
- Role (often the architect) responsible for administering the building contract: issuing instructions, certifying payments, assessing extensions of time, and certifying practical completion.
- Extensions of Time
- Additional time granted to the contractor for delays caused by relevant events (e.g., exceptionally adverse weather, client changes). Requires notice and assessment by the contract administrator.
- Liquidated Damages
- Pre-agreed sum per period of delay, representing a genuine estimate of loss. Must not be a penalty; enforced if contractor fails to complete by the extended completion date.
- Practical Completion
- Stage when works are complete except for minor defects. Triggers release of half retention, start of defects period, and transfer of risk/insurance responsibilities.
- Defects Liability Period
- Period (often 12 months) after practical completion during which the contractor must rectify notified defects. Final certificate issued after expiry.
- Variation
- A change to the contract scope, instructed in writing by the contract administrator. Valued by agreement, contract rates, or fair valuation; may affect time and cost.
- U-value
- Measure of thermal transmittance (W/m²K); lower values indicate better insulation. Used to demonstrate compliance with energy efficiency regulations.
- Fire Compartmentation
- Division of a building into fire-resistant compartments to limit fire spread. Required fire resistance periods (e.g., 30/60/90 minutes) depend on building height and use.
- BREEAM
- Building Research Establishment Environmental Assessment Method: a sustainability rating system for buildings, assessing energy, health, materials, and ecology.
- BIM Level 2
- Building Information Modelling maturity level using federated models and structured data. Mandatory on UK public projects; governed by ISO 19650 information management standards.
- Approved Document M
- UK building regulations guidance on accessibility and use of buildings, covering accessible routes, door widths, and sanitary facilities.
- Passivhaus
- A rigorous energy performance standard achieving very low heating demand through high insulation, airtightness, and mechanical ventilation with heat recovery.
- Professional Competence
- The duty to only undertake work within one's skills and knowledge, collaborating with specialists where necessary, and maintaining competence through CPD.
- Statutory Consultee
- Bodies (e.g., Environment Agency, Historic England) that local authorities must consult on certain planning applications before determining them.
- Interim Certificate
- Certificate issued by the contract administrator at agreed intervals, stating the amount due to the contractor based on valuation of work done.
- Final Certificate
- Certificate issued at the end of the defects period, confirming all works are complete and releasing the remaining retention. Often conclusive evidence of compliance.