- 780 CMR
- Citation for the Massachusetts State Building Code, which adopts the International Building Code with state amendments and governs construction statewide, with separate residential provisions for one- and two-family dwellings.
- Building Code Appeals Board
- State board that hears appeals of local building officials' code decisions; an appeal generally must be filed within 30 days of the local decision.
- 521 CMR
- Massachusetts Architectural Access Board regulations requiring accessible design in public and commercial buildings; in several respects they are stricter than the federal ADA standards.
- Permit action deadlines
- The local building official must grant or deny a building permit application within 30 days for one- and two-family dwellings and within 45 days for all other buildings.
- Certificate of occupancy
- Issued by the building official after final inspection; no new building, and no building with a changed use, may be occupied before it is issued.
- Zoning appeal period
- An appeal of a building permit or zoning decision to the local board of appeals must be filed within 20 days of the permit issuance or decision date.
- Statute of frauds
- Legal rule requiring certain contracts, including those that cannot be performed within one year, to be in writing and signed by the party to be charged.
- Chapter 93A demand letter
- Massachusetts consumer protection statute; a written demand for relief must be sent at least 30 days before suit, and violations can support multiple damages.
- Home improvement contract
- Written agreement required for residential work on owner-occupied one- to four-family homes; it must show the contractor's registration number and the three-business-day cancellation right.
- Mechanic's lien deadline
- Under M.G.L. c. 254 a lien must be recorded in the registry of deeds within 90 days after the last day labor or materials were furnished to the project.
- Massachusetts independent contractor test
- Three-part ABC test: the worker must be free from control, perform work outside the usual course of the employer's business, and be independently established in that trade.
- Drawing scale notation
- A 1/4 inch equals 1 foot plan means one quarter inch on paper equals twelve inches in reality; always confirm with the graphic scale if the sheet is resized.
- Section and detail callouts
- References such as 3/A-501 point to the sheet and detail number of the enlarged view; the plan shows location while the detail shows assembly and materials.
- Board foot formula
- Board feet equals thickness in inches times width in inches times length in feet, divided by 12; it is the basis for pricing rough lumber.
- Concrete volume in cubic yards
- Multiply length by width by depth, all in feet, then divide by 27; add roughly five to ten percent for waste and over-excavation.
- Excavation protective system threshold
- OSHA requires a protective system for trenches five feet or deeper unless the excavation is entirely in stable rock; twenty feet or deeper requires a registered engineer's design.
- Dig Safe notice
- Massachusetts law requires calling 811 and giving at least 72 hours notice before excavation so underground utilities can be located and marked.
- Massachusetts frost depth
- Footings must bear below the frost line, roughly 42 to 48 inches in most of Massachusetts, and at least 12 inches below finished grade.
- Concrete 28-day strength
- Specified compressive strength is measured on standard-cured cylinders tested at 28 days; field cylinders are made per ASTM C31 and tested per ASTM C39.
- Slump test
- ASTM C143 test that measures concrete workability; adding water on site to raise slump increases the water-cement ratio and lowers strength.
- Weep holes
- Openings at the base of an anchored veneer wall, just above the flashing, that drain trapped moisture; they are spaced not more than 24 inches on center.
- Joist notch limits
- End notches may not exceed one quarter of the joist depth; notches elsewhere may not exceed one sixth of the depth, and no notching is allowed in the middle third of the span.
- Joist hole limits
- Holes may not exceed one third of the joist depth, must be at least 2 inches from the top and bottom edges, and are limited to the outer thirds of the span.
- Joist bearing length
- Joists must bear at least 1-1/2 inches on wood or metal and at least 3 inches on masonry, with an approved connection resisting lateral displacement.
- Ice barrier requirement
- An ice-dam protection membrane is applied along the eaves, extending from the roof edge to at least 24 inches inside the exterior wall line where ice damming is expected.
- Minimum shingle slope
- Asphalt shingles need at least a 2:12 slope with double underlayment; between 2:12 and 4:12 special underlayment rules apply, and below 2:12 a membrane roof is required.
- Blower door test
- Whole-house air leakage test required by the energy code; results are reported in air changes per hour at 50 pascals, with lower numbers indicating a tighter envelope.
- 225 CMR 22
- Massachusetts residential energy code, based on the IECC with state amendments; the Stretch Code applies in Green Communities and requires higher efficiency than the base code.
- Fall protection trigger height
- OSHA construction rules require fall protection, such as guardrails, safety nets, or personal fall arrest systems, at six feet above a lower level.
- Massachusetts workers' compensation
- Virtually every Massachusetts employer with at least one employee must carry workers' compensation insurance; there is no small-employer exemption for construction businesses.
- Smoke and CO alarms
- Smoke alarms are required in each bedroom, outside sleeping areas, and on every level and must be interconnected; carbon monoxide alarms go near sleeping areas where fuel-fired appliances exist.
- DWV slope
- Horizontal drain pipe 3 inches and smaller must slope at least one quarter inch per foot, while larger horizontal drains may slope one eighth inch per foot.