MA General Contractor · Give each week a clear focus.

8 weeks · About 8 hours per week

Week 1

Massachusetts Building Code, Permitting and Inspection

  • Map the Massachusetts permitting sequence from application through certificate of occupancy, listing each inspection trigger point

  • Locate and tab the code sections governing egress, stair geometry, and fire separation in the current Massachusetts building code

  • Build a one-page checklist of documents a local building department requires at permit submittal

  • Compare three municipal inspection workflows and note where the code sets the floor versus local discretion

  • Write ten practice scenarios on permit violations and state the correct remedy for each

Your checkpoint

A tabbed code reference plus a one-page permit submittal and inspection-sequence checklist covering all four Massachusetts inspection stages

Week 2

Carpentry and Structural Framing & Plan Reading, Estimating and Project Layout

  • Read a full set of residential plans and transcribe floor-to-floor and wall-to-wall dimensions into a takeoff sheet

  • Calculate live and dead loads for two framing conditions and select compliant joist and rafter sizes from a span table

  • Describe correct header, trimmer, and king stud assemblies for three opening widths

  • Produce a quantity takeoff with waste factor for floor, wall, and roof framing on a small plan set

  • Identify code-required blocking, bracing, and connections at five designated plan locations

Your checkpoint

A complete framing takeoff with material quantities and a marked-up plan sheet showing span, header, and bracing callouts

Week 3

Contract Law, Liens and Business Practices & Jobsite Safety and Regulatory Compliance

  • Draft the eight clauses every Massachusetts residential contract must contain, including lien and payment terms

  • Sequence the Massachusetts mechanics lien process from notice to recording, with the statutory time limits for each step

  • Write a fall-protection and excavation-safety plan for a two-story addition

  • List OSHA and Massachusetts requirements for scaffolding, ladder use, and housekeeping on an active site

  • Explain the difference between a change order and a construction change directive and draft one of each

Your checkpoint

A sample contract package containing a signed-style agreement, a mechanics lien timeline, and a written site-specific safety plan

Week 4

Site Work, Excavation and Foundations & Concrete and Masonry Construction

  • Determine footing size and depth below grade for given soil and frost conditions

  • Specify backfill, compaction, and drainage details for a basement wall assembly

  • Identify soil types from a provided description and select appropriate excavation support

  • Describe formwork, reinforcement placement, and curing requirements for a slab and a foundation wall

  • Explain masonry flashing, weep, and anchor requirements at three wall conditions

Your checkpoint

A foundation and slab detail packet with written specifications for excavation, reinforcement, concrete placement, and masonry flashing

Week 5

Roofing, Waterproofing and Exterior Finishes & Energy Code and Building Envelope Performance

  • Detail the ice dam protection, underlayment, and flashing layers for a roof in three exposure conditions

  • Compare wall assembly approaches and calculate insulation R-values needed to meet the Massachusetts energy code

  • Explain air sealing and blower-door testing requirements and where they apply in a renovation

  • Specify waterproofing methods for below-grade walls, wet areas, and deck transitions

  • Identify the most common envelope defects that fail a rough inspection

Your checkpoint

A roof and envelope assembly binder with three roof details, two wall sections with R-value calculations, and a written air-sealing checklist

Week 6

Coordination of Electrical, Plumbing and Mechanical Trades & Site Work, Excavation and Foundations

  • Sequence the rough-in order for electrical, plumbing, and mechanical work relative to framing and inspection

  • Read an MEP plan set and flag the three most common cross-trade conflicts

  • State the clearance and ventilation rules for mechanical equipment in a residential basement

  • Reconcile a contractor's schedule with inspection hold points for all three trades

  • Re-check weak spots from weeks 4 and 5 with targeted practice questions

Your checkpoint

A written rough-in coordination schedule with a conflict-identification log listing at least five plan-level trade clashes and their resolutions

Week 7

Massachusetts Building Code, Permitting and Inspection & Contract Law, Liens and Business Practices & Carpentry and Structural Framing

  • Re-drill the heaviest domains with timed question sets and log every miss by root cause

  • Reconstruct from memory the permitting, lien, and framing rules that were missed most often

  • Summarize each of the ten domains on a single page for final review

  • Practice explaining code reasoning out loud to build speed on scenario questions

Your checkpoint

A root-cause error log covering at least 100 practice questions and a one-page summary for every domain

Week 8

Massachusetts Building Code, Permitting and Inspection & Carpentry and Structural Framing & Contract Law, Liens and Business Practices & Jobsite Safety and Regulatory Compliance

  • Complete two full-length timed practice exams under test conditions

  • Review every incorrect answer and convert each into a flashcard

  • Re-read only the one-page summaries and the highest-frequency flashcards

  • Confirm test-day logistics, including identification and scheduling

Your checkpoint

Two scored practice exams above the target pass threshold, with a final one-hour review sheet containing only recurring weak points

Milestones

Week 2: Explain the Massachusetts permit-to-occupancy sequence and size a joist and header from a span table without notes

Week 4: Score 70 percent or better on a timed 40-question set drawn from domains 1, 2, 3, and 6

Week 6: Score 75 percent or better on a timed 50-question mixed set, with no single domain below 60 percent

Week 8: Score 80 percent or better on two consecutive full-length timed practice exams