MA General Contractor key terms
MA General Contractor · Get comfortable with the vocabulary.
- 780 CMR
- Related: Occupancy Classification, Building Permit
The Massachusetts Building Code, Title 780 of the Code of Massachusetts Regulations. It adopts the International Building Code with Massachusetts amendments and governs how new and altered buildings must be designed and built statewide.
- Occupancy Classification
- Related: 780 CMR, Certificate of Occupancy
The use group a building is assigned under the building code, such as residential, mercantile, or assembly, based on how the space is used. It sets the fire, egress, and construction requirements that apply.
- Building Permit
- Related: Certificate of Occupancy, 780 CMR
Written municipal authorization to start construction or alteration. It is issued by the local building department after plan review, must be obtained before work begins, and the work must match the approved plans.
- Certificate of Occupancy
- Related: Building Permit, Substantial Completion
A document from the building inspector confirming the completed work complies with the approved plans and code, allowing the building to be legally occupied. A temporary version may be issued with conditions attached.
- Construction Supervisor License
- Related: Building Permit, Home Improvement Contractor Registration
A Massachusetts license issued by the Board of Building Regulations and Standards. It is required to supervise construction or alteration of buildings, including one- and two-family homes, above thresholds set by statute.
- Change Order
- Related: Substantial Completion, Retainage
A written amendment signed by owner and contractor that changes the scope, price, or schedule of an existing contract. Work added without one is difficult to get paid for later.
- Substantial Completion
- Related: Notice of Substantial Completion, Retainage, Certificate of Occupancy
The stage when the work is sufficiently finished that the owner can use the building for its intended purpose, with only minor items left. It starts warranty periods and often triggers retainage release and lien deadlines.
- Retainage
- Related: Substantial Completion, Lien Waiver
A percentage of each payment withheld by the owner until the project is substantially complete or final payment is due. It protects the owner against unfinished work and unpaid lien claims.
- Mechanic's Lien
- Related: Notice of Substantial Completion, Lien Waiver
A statutory claim recorded against real property by someone who supplied labor, materials, or services for improvements and was not paid. In Massachusetts it carries strict notice, recording, and enforcement deadlines under Chapter 254.
- Notice of Substantial Completion
- Related: Mechanic's Lien, Substantial Completion
A document recorded with the registry of deeds and sent to contractors stating the project is substantially complete. It starts the clock on several lien-related deadlines for subcontractors and suppliers.
- Lien Waiver
- Related: Mechanic's Lien, Retainage
A signed statement in which a contractor or supplier gives up the right to file a lien, usually in exchange for payment. Partial waivers cover progress payments; final waivers cover the whole remaining balance.
- Home Improvement Contractor Registration
- Related: Construction Supervisor License, Change Order
Massachusetts registration through the Office of Consumer Affairs required for contractors doing residential repair or remodeling on owner-occupied one-to-four family homes. Registered contractors must use written contracts and are subject to the guaranty fund.
- Architectural Scale
- Related: Section Drawing, Quantity Takeoff
The ratio relating a drawing measurement to the real building, such as one-quarter inch equals one foot. Reading it correctly is essential for taking off dimensions and building to the plan.
- Section Drawing
- Related: Architectural Scale, Door and Window Schedule
A cut-through view showing what the inside of a wall, floor, or roof assembly looks like, with layers and materials labeled. Sections explain how assemblies go together in ways a plan view cannot.
- Door and Window Schedule
- Related: Section Drawing, Architectural Scale
A table on the drawings listing every door and window by mark, with size, type, material, hardware, and fire rating. It is used for ordering units and for checking rough openings in the field.
- Quantity Takeoff
- Related: Architectural Scale, Critical Path Method
The process of measuring and counting materials from the drawings and specifications to build an itemized list of quantities for pricing. Accuracy at this stage drives the reliability of the whole estimate.
- Critical Path Method
- Related: Quantity Takeoff, Substantial Completion
A scheduling technique that links tasks by dependency and identifies the longest chain of work, which sets the shortest possible project duration. Delay on that chain delays final completion.
- Batter Boards
- Related: Frost Depth, Architectural Scale
Temporary horizontal boards set beyond the building corners, with strings stretched between them, to establish and preserve foundation lines and elevations during excavation and footing layout.
- Dig Safe
- Related: Trench Protective System
The free Massachusetts one-call service reached at 811 that notifies utilities to mark underground lines. Excavators must call at least 72 hours before digging and keep the marks visible while working.
- Order of Conditions
- Related: Dig Safe, Building Permit
A permit issued by a local conservation commission under the Wetlands Protection Act that sets limits on work near wetlands, streams, and floodplains. Working outside its terms can bring fines and stop-work orders.
- Frost Depth
- Related: Batter Boards
The depth to which soil freezes in winter. Footings must bear below it, or be otherwise protected, so freezing and thawing does not heave the foundation; Massachusetts depths are typically around four feet.
- Slump Test
- Related: Water-Cement Ratio, Control Joint
A field test measuring concrete consistency by filling a standard cone, lifting it off, and measuring how far the sample settles. It is a quick check that the delivered mix has the intended workability.
- Water-Cement Ratio
- Related: Slump Test, Control Joint
The weight of water divided by the weight of cement in a concrete mix. Lower ratios produce stronger, less permeable concrete, while adding water for workability weakens the finished material.
- Control Joint
- Related: Weep Holes, Water-Cement Ratio
A planned groove or saw cut in concrete or masonry that forces cracking to occur along a chosen line instead of randomly. Joints are spaced at regular intervals and cut to a set depth.
- Weep Holes
- Related: Flashing, Control Joint
Openings left at the base of a masonry wall or just above flashing that let trapped water drain to the outside. They work together with flashing and a drainage plane to keep moisture out of the assembly.
- Span Table
- Related: Header, Shear Wall
A code-referenced chart giving the maximum distance a given size, species, and grade of lumber may span for a stated load and spacing. It is how joists, rafters, and beams are sized in the field.
- Header
- Related: Span Table, Shear Wall
A horizontal structural member that carries loads across an opening such as a door or window and transfers them to jack studs or posts on each side.
- Shear Wall
- Related: Span Table, Header
A wall sheathed and fastened to resist sideways forces from wind or seismic movement and transfer them to the foundation. Its sheathing, nailing schedule, and hold-downs must match the approved plans.
- Ice Barrier
- Related: Drip Edge, Flashing
A self-adhering waterproof membrane installed along the eaves beneath the roofing to stop water backed up behind ice dams from entering the roof deck. It is required in Massachusetts at eaves.
- Drip Edge
- Related: Ice Barrier, Flashing
Metal flashing at the edges of a roof that sheds water clear of the fascia and underlayment. It goes on along eaves and rakes before roofing and helps protect the deck edge from rot.
- Flashing
- Related: Weep Holes, Drip Edge
Waterproof material installed at joints and penetrations such as roof valleys, wall intersections, chimneys, and windows to direct water to the exterior. Poor flashing is a leading cause of leaks.
- Weather-Resistive Barrier
- Related: Flashing, Air Barrier
A sheet or coating over wall sheathing, such as house wrap, that keeps wind-driven rain out while allowing vapor to escape. It must be lapped correctly and sealed around openings and penetrations.
- HERS Index
- Related: Blower Door Test, Air Barrier
A score from a home energy rating showing a home's energy use compared with a reference house, where lower is better and zero means net zero. Massachusetts energy compliance often relies on it.
- Blower Door Test
- Related: Air Barrier, HERS Index
A diagnostic test that uses a calibrated fan to depressurize a house and measure air leakage. Results verify the air-tightness the energy code requires and help locate where leaks need sealing.
- Air Barrier
- Related: Blower Door Test, Weather-Resistive Barrier
The continuous layer that stops air from leaking through the building enclosure, usually sheathing, membranes, or sealed drywall. It must be sealed at seams, penetrations, and transitions between assemblies.
- Competent Person
- Related: Trench Protective System, Fall Protection
Under OSHA, someone who can recognize existing and predictable hazards and has authority to correct them. The role is required for excavations, scaffolding, fall protection, and other high-risk tasks.
- Fall Protection
- Related: Competent Person
Systems and practices that keep workers from falling from heights, including guardrails, personal fall arrest, hole covers, and safe work procedures. OSHA requires it at six feet in construction work.
- Trench Protective System
- Related: Competent Person, Dig Safe
Sloping, benching, shoring, or shielding used to prevent cave-ins in excavations. It is required once a trench reaches five feet deep unless a competent person determines the soil is stable rock.
- Rough-In
- Related: Firestopping, Building Permit
The stage when pipes, ducts, and wiring are installed inside walls and floors before those cavities are closed. Rough-in inspections must pass before insulation and finish work may proceed.
- Firestopping
- Related: Rough-In
Approved materials and assemblies that seal openings where pipes, cables, or ducts pass through fire-rated walls and floors, preventing smoke and fire from spreading between building compartments.