MA General Contractor study materials
MA General Contractor study resources

MA General Contractor key terms

MA General Contractor · Get comfortable with the vocabulary.

780 CMR

The Massachusetts Building Code, Title 780 of the Code of Massachusetts Regulations. It adopts the International Building Code with Massachusetts amendments and governs how new and altered buildings must be designed and built statewide.

Related: Occupancy Classification, Building Permit
Occupancy Classification

The use group a building is assigned under the building code, such as residential, mercantile, or assembly, based on how the space is used. It sets the fire, egress, and construction requirements that apply.

Related: 780 CMR, Certificate of Occupancy
Building Permit

Written municipal authorization to start construction or alteration. It is issued by the local building department after plan review, must be obtained before work begins, and the work must match the approved plans.

Related: Certificate of Occupancy, 780 CMR
Certificate of Occupancy

A document from the building inspector confirming the completed work complies with the approved plans and code, allowing the building to be legally occupied. A temporary version may be issued with conditions attached.

Related: Building Permit, Substantial Completion
Construction Supervisor License

A Massachusetts license issued by the Board of Building Regulations and Standards. It is required to supervise construction or alteration of buildings, including one- and two-family homes, above thresholds set by statute.

Related: Building Permit, Home Improvement Contractor Registration
Change Order

A written amendment signed by owner and contractor that changes the scope, price, or schedule of an existing contract. Work added without one is difficult to get paid for later.

Related: Substantial Completion, Retainage
Substantial Completion

The stage when the work is sufficiently finished that the owner can use the building for its intended purpose, with only minor items left. It starts warranty periods and often triggers retainage release and lien deadlines.

Related: Notice of Substantial Completion, Retainage, Certificate of Occupancy
Retainage

A percentage of each payment withheld by the owner until the project is substantially complete or final payment is due. It protects the owner against unfinished work and unpaid lien claims.

Related: Substantial Completion, Lien Waiver
Mechanic's Lien

A statutory claim recorded against real property by someone who supplied labor, materials, or services for improvements and was not paid. In Massachusetts it carries strict notice, recording, and enforcement deadlines under Chapter 254.

Related: Notice of Substantial Completion, Lien Waiver
Notice of Substantial Completion

A document recorded with the registry of deeds and sent to contractors stating the project is substantially complete. It starts the clock on several lien-related deadlines for subcontractors and suppliers.

Related: Mechanic's Lien, Substantial Completion
Lien Waiver

A signed statement in which a contractor or supplier gives up the right to file a lien, usually in exchange for payment. Partial waivers cover progress payments; final waivers cover the whole remaining balance.

Related: Mechanic's Lien, Retainage
Home Improvement Contractor Registration

Massachusetts registration through the Office of Consumer Affairs required for contractors doing residential repair or remodeling on owner-occupied one-to-four family homes. Registered contractors must use written contracts and are subject to the guaranty fund.

Related: Construction Supervisor License, Change Order
Architectural Scale

The ratio relating a drawing measurement to the real building, such as one-quarter inch equals one foot. Reading it correctly is essential for taking off dimensions and building to the plan.

Related: Section Drawing, Quantity Takeoff
Section Drawing

A cut-through view showing what the inside of a wall, floor, or roof assembly looks like, with layers and materials labeled. Sections explain how assemblies go together in ways a plan view cannot.

Related: Architectural Scale, Door and Window Schedule
Door and Window Schedule

A table on the drawings listing every door and window by mark, with size, type, material, hardware, and fire rating. It is used for ordering units and for checking rough openings in the field.

Related: Section Drawing, Architectural Scale
Quantity Takeoff

The process of measuring and counting materials from the drawings and specifications to build an itemized list of quantities for pricing. Accuracy at this stage drives the reliability of the whole estimate.

Related: Architectural Scale, Critical Path Method
Critical Path Method

A scheduling technique that links tasks by dependency and identifies the longest chain of work, which sets the shortest possible project duration. Delay on that chain delays final completion.

Related: Quantity Takeoff, Substantial Completion
Batter Boards

Temporary horizontal boards set beyond the building corners, with strings stretched between them, to establish and preserve foundation lines and elevations during excavation and footing layout.

Related: Frost Depth, Architectural Scale
Dig Safe

The free Massachusetts one-call service reached at 811 that notifies utilities to mark underground lines. Excavators must call at least 72 hours before digging and keep the marks visible while working.

Related: Trench Protective System
Order of Conditions

A permit issued by a local conservation commission under the Wetlands Protection Act that sets limits on work near wetlands, streams, and floodplains. Working outside its terms can bring fines and stop-work orders.

Related: Dig Safe, Building Permit
Frost Depth

The depth to which soil freezes in winter. Footings must bear below it, or be otherwise protected, so freezing and thawing does not heave the foundation; Massachusetts depths are typically around four feet.

Related: Batter Boards
Slump Test

A field test measuring concrete consistency by filling a standard cone, lifting it off, and measuring how far the sample settles. It is a quick check that the delivered mix has the intended workability.

Related: Water-Cement Ratio, Control Joint
Water-Cement Ratio

The weight of water divided by the weight of cement in a concrete mix. Lower ratios produce stronger, less permeable concrete, while adding water for workability weakens the finished material.

Related: Slump Test, Control Joint
Control Joint

A planned groove or saw cut in concrete or masonry that forces cracking to occur along a chosen line instead of randomly. Joints are spaced at regular intervals and cut to a set depth.

Related: Weep Holes, Water-Cement Ratio
Weep Holes

Openings left at the base of a masonry wall or just above flashing that let trapped water drain to the outside. They work together with flashing and a drainage plane to keep moisture out of the assembly.

Related: Flashing, Control Joint
Span Table

A code-referenced chart giving the maximum distance a given size, species, and grade of lumber may span for a stated load and spacing. It is how joists, rafters, and beams are sized in the field.

Related: Header, Shear Wall
Header

A horizontal structural member that carries loads across an opening such as a door or window and transfers them to jack studs or posts on each side.

Related: Span Table, Shear Wall
Shear Wall

A wall sheathed and fastened to resist sideways forces from wind or seismic movement and transfer them to the foundation. Its sheathing, nailing schedule, and hold-downs must match the approved plans.

Related: Span Table, Header
Ice Barrier

A self-adhering waterproof membrane installed along the eaves beneath the roofing to stop water backed up behind ice dams from entering the roof deck. It is required in Massachusetts at eaves.

Related: Drip Edge, Flashing
Drip Edge

Metal flashing at the edges of a roof that sheds water clear of the fascia and underlayment. It goes on along eaves and rakes before roofing and helps protect the deck edge from rot.

Related: Ice Barrier, Flashing
Flashing

Waterproof material installed at joints and penetrations such as roof valleys, wall intersections, chimneys, and windows to direct water to the exterior. Poor flashing is a leading cause of leaks.

Related: Weep Holes, Drip Edge
Weather-Resistive Barrier

A sheet or coating over wall sheathing, such as house wrap, that keeps wind-driven rain out while allowing vapor to escape. It must be lapped correctly and sealed around openings and penetrations.

Related: Flashing, Air Barrier
HERS Index

A score from a home energy rating showing a home's energy use compared with a reference house, where lower is better and zero means net zero. Massachusetts energy compliance often relies on it.

Related: Blower Door Test, Air Barrier
Blower Door Test

A diagnostic test that uses a calibrated fan to depressurize a house and measure air leakage. Results verify the air-tightness the energy code requires and help locate where leaks need sealing.

Related: Air Barrier, HERS Index
Air Barrier

The continuous layer that stops air from leaking through the building enclosure, usually sheathing, membranes, or sealed drywall. It must be sealed at seams, penetrations, and transitions between assemblies.

Related: Blower Door Test, Weather-Resistive Barrier
Competent Person

Under OSHA, someone who can recognize existing and predictable hazards and has authority to correct them. The role is required for excavations, scaffolding, fall protection, and other high-risk tasks.

Related: Trench Protective System, Fall Protection
Fall Protection

Systems and practices that keep workers from falling from heights, including guardrails, personal fall arrest, hole covers, and safe work procedures. OSHA requires it at six feet in construction work.

Related: Competent Person
Trench Protective System

Sloping, benching, shoring, or shielding used to prevent cave-ins in excavations. It is required once a trench reaches five feet deep unless a competent person determines the soil is stable rock.

Related: Competent Person, Dig Safe
Rough-In

The stage when pipes, ducts, and wiring are installed inside walls and floors before those cavities are closed. Rough-in inspections must pass before insulation and finish work may proceed.

Related: Firestopping, Building Permit
Firestopping

Approved materials and assemblies that seal openings where pipes, cables, or ducts pass through fire-rated walls and floors, preventing smoke and fire from spreading between building compartments.

Related: Rough-In