Minnesota regulates asbestos abatement work through the Minnesota Department of Health (MDH), which publishes licensing and certification requirements, work practice guidance, and electronic forms for professionals on its Asbestos program pages. MDH maintains searchable registries for asbestos contractors and individually licensed asbestos workers, and it accepts complaints about asbestos work. The MN Asbestos Abatement case studies are 5 cases and about 3,224 words.
1Monday Morning Start After a Friday Notification
A licensed Minnesota abatement contractor has a $48,000 contract to remove 420 linear feet of friable pipe insulation and 180 square feet of 9-inch vinyl floor tile from a 1962 office building in Duluth. The building owner has a three-day tenant shutdown beginning Monday at 7 a.m.
677 words, about 3 min2Boiler Room Pressure Loss and a Failed Clearance
During a summer abatement at a 1965 school, a licensed contractor is removing 200 linear feet of friable pipe insulation and 60 square feet of tank insulation in the boiler room. The enclosure has three HEPA air machines and a manometer that read -0.018 inches of water column at the end of the shift.
646 words, about 3 min3The 1958 Rambler Renovation
Paul plans to renovate a 1958 rambler before listing it. The scope includes 400 square feet of 9-inch-by-9-inch vinyl floor tile and black mastic, 250 square feet of popcorn ceiling, about 30 cubic feet of loose vermiculite in the attic, and old furnace duct wrap.
632 words, about 3 min4Four Years Since the Last Reinspection
A Minnesota K-12 district's AHERA management plan shows the last reinspection was completed four years ago. This year's annual notice to parents, guardians, and employees was never sent.
651 words, about 3 min5Hospital Pipe Break at 2 A.M.
a chilled-water pipe bursts in a 1974 hospital mechanical room, soaking about 80 linear feet of friable pipe insulation. Maintenance shuts the water off and tracks debris into the adjacent corridor.