MN Asbestos Abatement study materials
MN Asbestos Abatement study resources

MN Asbestos Abatement key terms

MN Asbestos Abatement · Get comfortable with the vocabulary.

Asbestos Abatement Contractor License

A Minnesota Department of Health credential allowing a business to perform asbestos abatement for hire. The firm must employ a certified supervisor, hold required insurance, and follow state work practice rules.

Related: Asbestos Supervisor Certification, Abatement Notification
Asbestos Supervisor Certification

A Minnesota credential held by an individual who directs abatement work, oversees workers, and ensures compliance on a project. It requires an approved training course and passing an exam.

Related: Asbestos Worker Certification, Asbestos Abatement Contractor License
Asbestos Worker Certification

A Minnesota credential allowing an individual to perform hands-on asbestos abatement tasks under a certified supervisor. It requires completion of an approved training course and periodic refresher training.

Related: Asbestos Supervisor Certification, Respirator Fit Test
Asbestos Inspector Certification

A credential for individuals who identify and assess asbestos-containing materials in buildings, typically through sampling and record review, and who document findings for owners and contractors.

Related: Bulk Sample, Asbestos-Containing Material
Abatement Notification

A written notice submitted to the Minnesota Department of Health before certain abatement projects begin, stating project location, dates, scope, and contractor identity so regulators can schedule inspections.

Related: Asbestos Abatement Contractor License, Project Inspection
Refresher Training

Periodic retraining required to keep an asbestos certification active. It updates workers and supervisors on regulation changes and work practices, and must be documented by the training provider.

Related: Asbestos Worker Certification, Asbestos Supervisor Certification
Regulated Asbestos-Containing Material

Material that contains more than one percent asbestos and is subject to abatement work practice rules. The category drives handling, packaging, and disposal requirements on a project.

Related: Asbestos-Containing Material, Friable Asbestos
Asbestos-Containing Material

Any material or product that contains more than one percent asbestos by weight, as determined by polarized light microscopy or other accepted analysis of representative samples.

Related: Bulk Sample, Regulated Asbestos-Containing Material
Friable Asbestos

Asbestos material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability increases the likelihood that fibers become airborne and require stricter controls.

Related: Regulated Asbestos-Containing Material, Non-Friable Asbestos
Non-Friable Asbestos

Asbestos material that cannot readily be crumbled by hand pressure when dry, such as intact floor tile or roofing. It may still release fibers when cut, sanded, or broken.

Related: Friable Asbestos, Regulated Asbestos-Containing Material
Containment

A sealed enclosure, often plastic sheeting with negative pressure, built around the work area to keep asbestos fibers from escaping into occupied spaces during abatement.

Related: Negative Air Pressure, Critical Barrier
Negative Air Pressure

A condition in which air pressure inside a containment is lower than outside, so air flows inward and fibers stay confined. It is maintained with exhaust units and monitored with a manometer.

Related: Containment, HEPA Vacuum
HEPA Vacuum

A vacuum equipped with a high-efficiency particulate air filter that traps very small particles, including asbestos fibers. It is used for cleanup and decontamination instead of ordinary shop vacuums.

Related: Negative Air Pressure, Decontamination Unit
Decontamination Unit

A series of connected rooms, typically a dirty room, shower, and clean room, that workers pass through to remove contaminated clothing and fibers before leaving the work area.

Related: Containment, Personal Protective Equipment
Personal Protective Equipment

Gear worn to reduce fiber exposure, including disposable coveralls, gloves, and a fitted respirator. It must be removed in the decontamination unit and disposed of properly.

Related: Respirator Fit Test, Decontamination Unit
Respirator Fit Test

A test confirming that a respirator seals properly to a worker's face. It is required before use and repeated periodically, and workers must also be medically cleared to wear one.

Related: Personal Protective Equipment, Asbestos Worker Certification
Wet Removal

A work practice of soaking asbestos material with water or a wetting agent before and during removal to suppress fiber release. It is a standard control on most abatement projects.

Related: Containment, Friable Asbestos
Critical Barrier

A physical boundary such as plastic sheeting or a sealed doorway that separates contaminated work areas from clean areas. Damage to a critical barrier must be repaired before work continues.

Related: Containment, Negative Air Pressure
Bulk Sample

A small physical piece of suspected material collected for laboratory analysis to determine asbestos content. Samples must be taken in a way that represents the material and avoids fiber release.

Related: Asbestos-Containing Material, Asbestos Inspector Certification
Polarized Light Microscopy

A laboratory method using polarized light to identify asbestos minerals and estimate their percentage in a bulk sample. It is the standard analytical technique for most building materials.

Related: Bulk Sample, Asbestos-Containing Material
Surfacing Material

Material applied to surfaces for fireproofing, acoustical treatment, or decoration, such as sprayed-on ceiling texture. It is often friable and commonly found to contain asbestos in older buildings.

Related: Friable Asbestos, Thermal System Insulation
Thermal System Insulation

Material applied to pipes, boilers, tanks, and ducts to control temperature, including pipe wrap and boiler lagging. Older insulation is a frequent source of friable asbestos.

Related: Surfacing Material, Friable Asbestos
Vinyl Asbestos Floor Tile

Resilient flooring made with asbestos fibers for strength and durability, common in mid-twentieth-century buildings. It is usually non-friable until cut, sanded, or ground.

Related: Non-Friable Asbestos, Asbestos-Containing Material
Asbestos Cement Product

A hard building material made of cement reinforced with asbestos, used in siding, roofing, and pipe. It is non-friable but can release fibers when sawed or broken.

Related: Non-Friable Asbestos, Regulated Asbestos-Containing Material
Asbestos Management Plan

A written document for a school building that describes the location and condition of asbestos materials and outlines how they will be managed, inspected, and communicated to occupants.

Related: AHERA, OM&M Program
AHERA

The federal Asbestos Hazard Emergency Response Act, which requires schools to inspect for asbestos, prepare management plans, and use accredited personnel for certain activities.

Related: Asbestos Management Plan, OM&M Program
OM&M Program

An operations, maintenance, and repair program that keeps asbestos materials in good condition and prevents disturbance during routine building work. It includes training, work orders, and periodic surveillance.

Related: Asbestos Management Plan, AHERA
Periodic Surveillance

A recurring visual check of asbestos materials in a school to confirm their condition has not deteriorated. Findings are recorded and reported so management plans can be updated.

Related: Asbestos Management Plan, OM&M Program
Response Action

A step taken to address asbestos in a school, such as repair, encapsulation, enclosure, or removal. The chosen action depends on material condition and the likelihood of disturbance.

Related: Asbestos Management Plan, Encapsulation
Encapsulation

A response action that coats asbestos material with a sealant to bind fibers and prevent release. It does not remove the material and requires the surface to remain undamaged.

Related: Response Action, Enclosure
Enclosure

A response action that builds a durable barrier around asbestos material to separate it from occupied space. The material stays in place and must be marked and managed.

Related: Encapsulation, Response Action
Asbestos Hazard Emergency Response Act Designated Person

A school employee assigned to ensure the school's asbestos program is carried out, including plan availability, inspections, and oversight of contractors working in the building.

Related: Asbestos Management Plan, AHERA
Abatement Project Records

Documentation a contractor keeps for each project, such as waste manifests, air monitoring results, and worker training records. Regulators may review them during inspections or audits.

Related: Abatement Notification, Project Inspection
Project Inspection

A regulatory visit to an abatement site to verify that notification was filed, certified workers are on site, and containment and work practices meet state requirements.

Related: Abatement Notification, Abatement Project Records
Waste Shipment Manifest

A tracking form that documents the quantity, origin, and destination of asbestos waste from a project. It helps confirm that material reached an approved disposal site.

Related: Regulated Asbestos-Containing Material, Abatement Project Records
Clearance Air Monitoring

Testing of air inside a containment after removal and cleaning to confirm fiber levels are acceptably low. Passing results allow the containment to be dismantled and the area reoccupied.

Related: Containment, HEPA Vacuum
Glove Bag

A sealed plastic bag with built-in gloves used to remove small amounts of pipe insulation without building a full containment. It keeps fibers enclosed during the work.

Related: Thermal System Insulation, Wet Removal
Presumed Asbestos-Containing Material

Material that has not been sampled but must be treated as containing asbestos until testing proves otherwise. This precaution applies to many older building products.

Related: Bulk Sample, Asbestos-Containing Material
Asbestos Fiber Release Episode

An uncontrolled disturbance of asbestos material that sends fibers into the air, such as a fallen ceiling or damaged pipe insulation. It requires immediate cleanup and notification.

Related: OM&M Program, Response Action