MN Asbestos Abatement study materials
MN Asbestos Abatement study resources

MN Asbestos Abatement flashcards

MN Asbestos Abatement · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Minnesota abatement contractor license
A state-issued credential required for any firm that contracts to perform asbestos abatement in Minnesota; work cannot begin without it.
Worker certification course hours
Minnesota requires an approved initial worker course of 32 hours, including hands-on training, followed by a passing exam before certification.
Supervisor initial course
The initial supervisor/contractor course is 40 hours and covers regulations, work practices, supervision, and hands-on removal techniques.
Annual refresher requirement
Certified individuals must complete an approved refresher course each year before the certificate expires to keep the certification active.
Project designer course
A 24-hour approved course preparing individuals to write abatement specifications, select response actions, and design containment and clearance procedures.
Notification submission
Contractors must notify MDH in writing before starting most abatement projects, providing site, schedule, contractor, and material information.
Certificate on site
A copy of each worker's and supervisor's current certification must be available at the work site during abatement for inspection.
Unlicensed abatement penalty
Performing abatement without the required license can lead to stop-work orders, civil penalties, license denial, and criminal charges under state law.
Negative pressure requirement
Containment must be kept under negative pressure, typically about -0.02 inches of water column, with at least 4 air changes per hour.
Wet removal method
Asbestos material is saturated with amended water before and during removal and kept wet through bagging to prevent fiber release.
Glove bag use
A sealed bag attached around pipe or duct for small removals; tools stay inside and waste is goosenecked into a labeled disposal bag.
Waste packaging
Removed ACM is double-bagged in 6-mil leak-tight bags or wrapped in 6-mil poly, labeled with the asbestos warning, and handled as regulated waste.
Decontamination sequence
Workers pass from the work area through an equipment room and shower into a clean room, showering before leaving containment.
Final visual inspection
Before clearance sampling, the containment is inspected for dust and residue; any visible debris requires re-cleaning and re-inspection.
Clearance air sampling
Aggressive air sampling after cleaning confirms fiber levels are at or below the clearance limit before the area is released for occupancy.
HEPA filtration
High-efficiency particulate air filters capture asbestos fibers; HEPA vacuums and negative air machines are required for cleanup and pressure control.
Critical barriers
Plastic sheeting sealing openings, vents, and surfaces in the work area to prevent fiber migration outside the containment.
Friable definition
Material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry; friable ACM poses the greatest fiber-release risk.
Category I non-friable
Non-friable materials such as asphalt roofing, flooring, and gaskets that generally do not release fibers unless sanded or damaged.
Category II non-friable
Cementitious products such as transite, cement pipe, and shingles that can become friable when cut, broken, or demolished.
Six regulated minerals
Chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite are the regulated asbestos minerals; chrysotile is the serpentine form.
PACM definition
Presumed asbestos-containing material: thermal system insulation and surfacing materials in older buildings assumed to contain asbestos until sampling proves otherwise.
Thermal system insulation
Insulation on pipes, boilers, tanks, and ducts; a common ACM category and a presumed ACM in pre-cutoff buildings.
Surfacing material
Spray-applied or troweled material on ceilings, walls, and structural members for fireproofing or acoustics; often friable ACM.
Bulk sampling protocol
An accredited inspector collects the required number of samples per homogeneous area, and an accredited lab analyzes them by PLM or TEM.
AHERA scope
The Asbestos Hazard Emergency Response Act requires all public and private K-12 schools to inspect for asbestos and prepare management plans.
Designated person
The school official responsible for ensuring AHERA compliance, including inspections, management plan updates, notifications, and recordkeeping.
Management plan contents
A written plan describing inspection results, response actions, O&M procedures, and schedules, kept at the school and the local education agency.
Triennial reinspection
Schools must re-inspect all known and assumed asbestos-containing material every three years using an accredited inspector and update the plan.
Annual notification
Schools must notify parents, teachers, and employee organizations each year about the management plan and any planned or ongoing abatement.
School clearance limit
After abatement in a school, air sampling must show fiber levels at or below 0.01 fibers per cubic centimeter by PCM before reoccupancy.
Response action types
AHERA response actions include repair, encapsulation, enclosure, removal, and operations and maintenance, selected based on material condition and disturbance potential.