NABCEP SHI · Keep the key ideas within reach.

Quick reference

Safety and Hazard Control on Solar Water and Pool Heating Job Sites

  • OSHA construction fall protection is required at 6 ft (1.8 m) above a lower level; roof edges, skylights, and open penetrations need guardrails, covers, or personal fall arrest.

  • A roof-access ladder must extend 3 ft (0.9 m) above the landing and be secured; maintain three-point contact and a 1:4 ladder angle.

  • PV source circuits remain energized whenever exposed to light; treat DC conductors as live, use a CAT III meter, and verify zero voltage after isolation.

  • Stored solar hot water can stratify above 160°F (71°C); isolate and drain before opening, and use a tempering valve to limit domestic delivery to about 120°F (49°C).

  • Glycol and pool chemicals require SDS access, chemical goggles, gloves, and ventilation; chlorine products must not contact acid or ammonia.

  • Collectors commonly weigh 80–150 lb (36–68 kg); use two-person lifts or a hoist and verify roof staging load limits before moving them.

  • Soldering and torch work require a fire watch, shielding from combustible roof materials, and a charged extinguisher within reach.

  • Heat illness risk rises with WBGT; use acclimatization, water, rest, and shade, and stop work for confusion, collapse, or severe cramping.

  • Lockout/tagout applies to line-voltage pumps, controllers, and pool equipment; isolate all sources, including dual-supply PV and grid.

Quick reference

Site Assessment, Design Package Review, and Pre-Installation Planning

  • In the northern hemisphere, true south is the reference azimuth; correct compass readings for magnetic declination before setting collector orientation.

  • Year-round domestic hot water collectors typically tilt near latitude; winter-biased designs add 10–15°, while summer pool heating may subtract 10–15°.

  • A solar window of about 9 a.m. to 3 p.m. year-round is the usual shading criterion; check winter solstice because shadows are longest then.

  • Roof structural review must compare collector dead load, rack, and fluid weight with existing dead, live, snow, and wind loads; do not assume rafter capacity.

  • Confirm roof covering age and remaining service life; mounting over deteriorated shingles can void warranties and create leak callbacks.

  • Measure pipe route length, elevation gain, and fitting count to estimate pump head; short, insulated runs reduce heat loss and pump energy.

  • Freeze design uses the lowest expected ambient temperature, not the average; select drainback, recirculation, or glycol protection from that value.

  • Water quality tests should include hardness, pH, chloride, and total dissolved solids; hard or high-chloride water affects scaling and corrosion.

  • Design package review checks collector SRCC rating, array area, flow rate, pipe size, pump curve, controller sensors, relief valve, and wind/snow attachments.

Quick reference

Collector and Array Mounting and Structural Attachment

  • Collector arrays add dead load from collector, rack, fluid, and snow; calculate pounds per square foot over the tributary roof area and compare to structural capacity.

  • Lag screws or structural screws must engage rafters or trusses at manufacturer-specified embedment; decking alone is not a structural attachment.

  • Every roof penetration needs flashed and counter-flashed detailing; sealant is a secondary weather barrier, not the primary flashing.

  • Rail and standoff spacing must follow the rack manufacturer's span table and the project's wind uplift and snow load calculations.

  • Wind uplift is highest at roof corners and edges; add attachments there per ASCE 7 or local code and manufacturer engineering.

  • Ground-mount piers must extend below frost depth and be designed for overturning from wind; concrete must cure before loading.

  • Row spacing to avoid winter shading: D = H / tan(alpha), where H is collector height above the row and alpha is the minimum solar altitude at the critical time.

  • Isolate dissimilar metals with dielectric bushings or washers; copper-to-aluminum contact causes galvanic corrosion.

  • Seismic bracing and flexible connections are required where code or manufacturer dictates; rigid piping can transfer movement to collectors.

Quick reference

Hydronic Piping, Plumbing, Storage Tanks, and Pool Loop Installation

  • Typical flat-plate collector design flow is about 0.05 gpm per square foot (0.002 L/s per m²); verify the exact value in the collector manual.

  • Keep pipe velocity generally below 5 ft/s (1.5 m/s) in copper and below 4 ft/s in plastic to limit erosion, noise, and pressure drop.

  • Drainback piping must slope continuously to the drainback tank, typically at least 1/4 in per foot (2%), with no traps or high points.

  • A pressure relief valve must protect the solar loop and tank; typical settings are 150 psi (1,034 kPa) for the loop and 210°F (99°C) temperature relief.

  • Glycol freeze protection must cover the lowest ambient plus margin; 30–50% propylene glycol is common, and concentration above 60% reduces heat transfer.

  • Expansion tank precharge and size depend on system volume, maximum temperature, and glycol expansion; undersizing causes relief valve discharge.

  • Potable water connections need backflow prevention and a thermal expansion tank; a check valve alone does not protect the potable supply.

  • Use high-temperature, UV-rated insulation on solar loop piping; butt insulation tightly and protect it from roof traffic and UV.

  • Pool loops use a heat exchanger or direct collector loop with corrosion-resistant materials; interlock solar flow with pool filtration and add a check valve.

Quick reference

Controls, Sensors, Pumps, and Electrical Interconnections

  • Differential control turn-on is typically 8–12°F (4–7°C) above tank temperature; turn-off is about 4°F (2°C) to prevent short cycling.

  • The collector sensor belongs at the collector hot outlet, and the tank sensor at the lower tank; both must be thermally coupled and shielded.

  • Freeze protection recirculation usually starts near 38–40°F (3–4°C); drainback systems instead rely on pump-off draining and slope.

  • High-limit control stops the pump near 180–200°F (82–93°C) or per manufacturer; stagnation must be planned, not treated as a fault.

  • Pump selection must use the system curve and collector manufacturer's flow rate; a valve balances flow and an isolation flange allows service.

  • Line-voltage solar equipment needs a disconnect, overcurrent protection, and GFCI where required; pool pumps require GFCI protection per code.

  • Keep low-voltage sensor wiring separate from line-voltage conductors; use shielded cable and grounded shielding where noise is present.

  • A PV-direct pump has no battery; its flow varies with irradiance, so commissioning must verify performance at design solar noon.

  • Pool solar controls should run only when the filter pump is on and freeze protection is active; a flow switch or pressure switch confirms flow.

Quick reference

Commissioning, Troubleshooting, Maintenance, and Customer Handover

  • Pressure-test the solar loop at 1.5 times the maximum operating pressure or per code, hold the test, and record the result before insulation.

  • Commissioning records should include cold fill pressure, pump current, flow rate, collector and tank temperatures, delta-T, and glycol concentration.

  • Purge air from the loop at the highest point and verify the air eliminator; air locks cause high outlet temperature and low flow.

  • A no-heat complaint is checked in order: pump operation, controller sensor readings, flow, air lock, freeze protection, and collector isolation valves.

  • Glycol should be tested annually for pH and inhibitor; many propylene glycol systems need replacement every 3–5 years or per test results.

  • Maintenance includes collector cleaning, relief valve exercise, insulation inspection, sensor calibration, and pump/check valve checks.

  • Handover must include manuals, warranties, freeze protection instructions, controller settings, shutoff locations, and emergency procedures.

  • Scald protection at the point of use is verified at handover; a tempering valve should limit hot water delivery to about 120°F (49°C).

  • Pool system handover covers filter operation, solar bypass valves, freeze protection, and the expected temperature rise per day.