Mistake 1

Records final superheat, subcooling, and delta-T numbers from readings taken two or three minutes after the compressor starts, then adds or removes refrigerant chasing those early numbers.

Exam items that walk through a full service call compress time, and candidates transfer that habit to the field, treating the first gauge reading as steady-state data before the evaporator, condenser, and metering device have reached thermal equilibrium.

What to do instead

Run the system 15–20 minutes minimum (longer after a recovery, in high ambient, or with a hot pulldown load) and require suction pressure, liquid pressure, and both airstream temperatures to hold steady within a narrow band across two readings before you use or act on either number. Document the ambient and indoor conditions you stabilized at, because the target values move with them.

Mistake 2

Reads indoor wet-bulb in still room air at the wall thermostat, or simply copies the thermostat's dry-bulb reading into the wet-bulb slot before looking up target superheat.

Wet bulb is the variable candidates are least comfortable with; the thermostat is right there and shows one number, and a sling or digital psychrometer is easy to misuse, so the wrong number gets written down without anyone noticing.

What to do instead

Take wet bulb in the return airstream close to the blower or at the return grille, fully saturate the sock with distilled water and let it stabilize (or use a calibrated digital psychrometer), and record it together with return dry bulb and outdoor dry bulb. If you only have dry bulb, you do not have the inputs for a target superheat chart - say so instead of guessing.

Mistake 3

Applies a fixed-orifice target-superheat charging chart to a system with a thermostatic expansion valve, or chases a subcooling target on a coil with a piston.

Most candidates memorize one charging method and reach for it by reflex; the trick is that the metering device, not the system tonnage or brand, decides which method governs.

What to do instead

Identify the metering device physically at the coil before charging: TXV or EEV means charge to the manufacturer's subcooling target at the liquid line (commonly around 8–12°F, but use the label), while a fixed orifice or piston means charge to the target superheat from the indoor wet-bulb/outdoor dry-bulb chart. On a TXV, high superheat is a valve or airflow complaint, not a low-charge complaint.

Mistake 4

Verifies delivered airflow by multiplying a handheld anemometer's spot velocity reading by the register's nominal face dimensions and accepting the result as CFM.

The arithmetic is simple and produces a number, which feels like verification; candidates do not account for free area being smaller than the grille frame, uneven velocity across the face, or air density changes with altitude and temperature.

What to do instead

Use the register manufacturer's free-area (Ak) factor with a multi-point traverse, or better, measure total external static pressure across the air handler and read CFM off the blower performance table for the actual speed tap, then cross-check with a flow hood or a duct traverse. Target roughly 350–450 CFM per ton of cooling, and note that the blower table assumes standard air.

Mistake 5

Checks a run or dual capacitor with the wires still connected and the meter in resistance or voltage mode, then calls the part good or bad from that reading.

It is faster to touch probes to the terminals in place, and candidates are unsure whether capacitance mode exists on their meter, so they default to the continuity or ohms function they use every day.

What to do instead

Power off, discharge the terminals through an insulated resistor, disconnect at least one lead from each section of a dual capacitor, set the meter to capacitance (µF), and compare against the nameplate within the manufacturer's tolerance (commonly ±6%, sometimes ±10%). Also inspect for bulging, leaking, or a burnt terminal, and verify any start-assist components separately.

Mistake 6

Condemns a compressor from an ohmmeter check made with the leads still landed on the contactor and capacitor, or from a single continuity reading to ground taken on a wet pad.

Winding checks look like the easiest electrical test on the exam and in the field, so candidates skip isolation and forget that parallel paths through start components, wiring, or moisture give readings that have nothing to do with the compressor.

What to do instead

Isolate the compressor terminals, measure common-to-run, common-to-start, and run-to-start with meter lead resistance subtracted, and confirm run-to-start equals the sum of the other two. Use a megohmmeter for insulation resistance to ground and compare with the manufacturer's minimum, then confirm the electrical verdict with amp draw against nameplate RLA and with system pressures before replacing anything.

Mistake 7

Installs a one-inch MERV 13 filter in a slot that was budgeted for a fiberglass mat, leaves the blower on the factory speed tap, and never rechecks static pressure.

Higher MERV is marketed as better air quality, and the filter rating is printed on the package while the filter's pressure drop at design CFM is buried in a table nobody opens; the connection between filter resistance, available static pressure, and delivered airflow is easy to miss.

What to do instead

Look up the filter's pressure drop at design CFM and subtract it, along with the coil, registers, and duct losses, from the blower's available external static pressure for the selected speed. If the budget is exceeded, move to a deeper media cabinet or a larger filter face area rather than a restrictive one-inch pleat, and verify the result with a before-and-after total external static pressure reading.

Mistake 8

Leaves the return air path unverified - solid-core bedroom doors with no transfer grille or jump duct, a single undersized return, or a return chase connected to an unconditioned space - and attributes the resulting hot rooms and high static to the equipment.

Supply-side work is visible and satisfies the installer, while return pathways are invisible after trim-out; candidates also do not connect closed-door pressure imbalances to infiltration, humidity, and indoor air quality complaints.

What to do instead

Confirm return capacity roughly matches supply capacity, add transfer grilles or jump ducts sized for the airflow, and check the pressure difference across closed doors, which should stay small (on the order of 2.5 Pa / 0.01 in. w.c. or less). Seal any return-path leakage from attics, garages, or crawlspaces, since that is where the air quality problem actually originates.

Mistake 9

Installs a draw-through air handler with no condensate trap, or with a shallow prefabricated trap, and runs the drain line nearly level to the outlet.

Trap depth is a calculation tied to the fan's negative static pressure, and many units ship with a shallow trap or none; 'it drains on the first test' seems to confirm the installation even though the fan pulls air through the line under load.

What to do instead

Size trap depth so it exceeds the unit's negative static pressure in inches of water column (for example, a unit running at −0.5 in. w.c. needs at least about 1.5 in. of trap depth, per the manufacturer), slope the line a minimum of 1/4 inch per foot, provide a vent or cleanout, and install a float switch or secondary drain on the auxiliary pan. Verify drainage with the blower running, not off.

Mistake 10

Declares a system evacuated when the manifold gauge set settles near 30 inHg, having pulled through standard charging hoses with Schrader cores still in the service ports.

Analog manifold gauges cannot resolve or hold vacuum accurately below roughly 28–29 inHg, and restricted hoses mean the pump reaches its own limit while the system is still wet; the needle 'looks pinned,' so the step feels finished.

What to do instead

Use a calibrated electronic micron gauge connected at the system, remove Schrader cores or use large-bore core-depressor hoses, and pull to 500 microns or below with a nitrogen sweep or triple evacuation if moisture is suspected. Then isolate the pump and hold for at least 10 minutes - a rise back above roughly 1000 microns indicates a leak or residual moisture, not a completed evacuation.