NATE AC Installation · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Operating Conditions

  • Define design operating conditions for cooling and heating cycles, including entering dry-bulb and wet-bulb, outdoor ambient, and indoor relative humidity targets.

  • Convert between gauge pressure, absolute pressure, and saturation temperatures using a pressure-temperature chart for R-410A and R-32 without a calculator aid.

  • Explain how airflow (cfm per ton), return-air temperature, and condenser ambient shift the operating envelope of a system.

  • Identify the instruments used to establish operating conditions: manifold gauges, digital psychrometer, clamp meter, manometer, and infrared thermometer, and state what each reading proves.

Your checkpoint

A one-page conditions worksheet with 12 practice scenarios; record entering/leaving dry-bulb and wet-bulb, ambient, and target superheat or subcooling for each, scoring at least 10 of 12 correct against the answer key.

Week 2

Operating Conditions & System Components

  • Calculate target superheat from indoor wet-bulb and outdoor dry-bulb using a charging chart, then compare it against measured superheat.

  • Calculate subcooling from condensing saturation temperature and liquid-line temperature, and state the acceptable target range for a TXV system.

  • Describe how a restricted liquid line, an overcharged system, and an undercharged system each move superheat and subcooling in opposite directions.

  • Diagram the refrigeration cycle on a pressure-enthalpy sketch and label the state of refrigerant at four points.

Your checkpoint

Ten worked charging problems showing measured suction pressure, suction-line temperature, liquid-line temperature, and calculated superheat and subcooling, with a written verdict (correct charge, undercharge, overcharge, or restriction) for each.

Week 3

System Components

  • Identify the function and failure signature of the compressor, condenser coil, evaporator coil, metering device, filter drier, and accumulator or receiver.

  • Compare TXV, fixed orifice, and EEV metering devices on how they respond to load changes and where each is applied.

  • Sequence the installation steps for line-set routing, brazing with nitrogen purge, pressure testing, and triple evacuation to 500 microns.

  • Explain the purpose of a filter drier, a liquid-line sight glass, and a crankcase heater, and state what each protects.

Your checkpoint

A labeled system-component diagram plus a written installation sequence of at least 10 ordered steps, checked against a manufacturer's installation manual for a residential split system.

Week 4

System Components & Electrical

  • Read a unit nameplate and extract minimum circuit ampacity, maximum overcurrent protection, rated voltage, phase, and refrigerant charge.

  • Calculate the required conductor ampacity and select the correct breaker size from the nameplate data for three sample units.

  • Identify the function of the contactor, run capacitor, start capacitor and relay, transformer, and disconnect, and recognize their common failure symptoms.

  • Explain proper lockout/tagout and safe capacitor discharge procedure before servicing electrical components.

Your checkpoint

A completed electrical panel for three sample systems listing nameplate MCA and MOP, chosen conductor size, breaker size, and capacitor rating, with each selection justified in one sentence.

Week 5

Electrical

  • Measure line voltage, control voltage, and running amperage on a live circuit and compare each reading against nameplate tolerances.

  • Test a run capacitor with a meter, calculate the acceptable microfarad range from its rating, and diagnose a failed capacitor.

  • Trace a low-voltage control circuit from thermostat through the transformer, contactor coil, and safety switches, and identify where an open circuit stops the call for cooling.

  • Verify equipment grounding, polarity, and bonding requirements at the disconnect and at the unit.

Your checkpoint

A written electrical diagnostic log for five fault scenarios (open control circuit, failed capacitor, low voltage, reversed polarity, blown fuse) listing the meter readings you would expect and the conclusion each supports.

Week 6

System Diagnostics and Performance

  • Calculate temperature split (delta T) across the evaporator and compare against the manufacturer's target range for the measured indoor conditions.

  • Measure external static pressure across the air handler and use it to judge whether airflow is within the blower performance table.

  • Diagnose low airflow, high superheat, and high delta T as a set of correlated symptoms, and separate them from a low-charge pattern.

  • Explain the recovery, recycling, and evacuation requirements for refrigerant handling during service and how to verify a leak-free system.

Your checkpoint

A diagnostic decision tree that starts from three measured values (delta T, superheat, static pressure) and branches to at least five distinct root causes, each with a confirming field test.

Week 7

Air Quality & System Diagnostics and Performance

  • Explain how outdoor air intake, return-air filtration, and duct sealing each affect indoor air quality and total system capacity.

  • Select an appropriate filter MERV rating for a residential application and state the trade-off between filtration and pressure drop.

  • Identify duct leakage, undersized returns, and unbalanced room airflow as causes of comfort complaints, and describe how to measure and correct each.

  • Verify condensate drainage, trap depth, and slope as they relate to humidity control and mold prevention.

Your checkpoint

An air-quality commissioning checklist covering filtration, ventilation, duct leakage, and condensate, with the measurement method and acceptance criterion written next to each item.

Week 8

Operating Conditions & System Components & Air Quality & Electrical & System Diagnostics and Performance

  • Re-take timed practice sets for every domain and log every missed question by domain and root-cause category.

  • Re-study the two lowest-scoring domains from the logged results until error rates drop below 15 percent.

  • Recite from memory the key formulas and target values: superheat method, subcooling method, delta T, MCA and MOP selection, and capacitor tolerance.

  • Simulate a full installation walk-through from rough-in to final performance verification, narrating each measurement and its acceptance criterion.

Your checkpoint

A full-length timed practice exam with a score of at least 85 percent overall and no single domain below 75 percent, plus a one-page personal error log with remediation notes.

Milestones

Week 2: Complete a 25-question practice set on operating conditions and system components with at least 80 percent correct, and correctly calculate both superheat and subcooling from raw readings without notes.

Week 4: Correctly extract MCA and MOP from three real nameplates and select matching conductors and breakers; score at least 75 percent on an electrical fundamentals set.

Week 6: Given a symptom set (low delta T, low superheat, normal static pressure), name the most likely root cause and the test that confirms it, in three out of three scenarios.

Week 8: Score at least 85 percent on a full-length timed practice exam with no domain below 75 percent, with every missed item logged and re-explained in writing.