NC Land Surveyor study materials
NC Land Surveyor study resources

NC Land Surveyor key terms

NC Land Surveyor · Get comfortable with the vocabulary.

Standard of care

The level of skill, diligence, and judgment that a reasonably competent surveyor practicing in the same community under similar circumstances would exercise. It is the legal benchmark used to judge negligence claims.

Related: Statute of limitations
Statute of limitations

A law setting the maximum time after an event, or after its discovery, within which a lawsuit may be filed. For surveyors it limits how long a client may sue over alleged errors.

Related: Standard of care
Surveyor's lien

A statutory claim against a property securing payment for surveying services that improved it. The surveyor must follow state filing, notice, and deadline requirements to keep the lien enforceable.

Related: Plat
Plat

A scaled drawing showing the boundaries, monuments, and related features of a parcel, usually recorded in public land records. Recording gives notice of the boundaries to later purchasers.

Related: Constructive notice, Metes and bounds
Constructive notice

Legal notice imputed to the public by recording a document in the proper office, whether or not anyone actually reads it. Recorded plats and deeds give constructive notice of their contents.

Related: Plat
Easement

A nonpossessory right held by one party to use another person's land for a specific purpose, such as access or utilities. It may be appurtenant to a parcel or held in gross.

Adverse possession

A doctrine allowing a person who openly, exclusively, continuously, and hostilely occupies land for the statutory period to acquire title, subject to state-specific conditions and exceptions.

Related: Boundary by agreement, Senior rights
Riparian rights

Rights of owners of land bordering a watercourse to reasonable use of the water and to accretions, generally limited by reasonable-use rules and public-trust principles.

Related: Meander line
Senior rights

The principle that among overlapping or conflicting boundary claims, the earlier-established boundary or conveyance generally prevails. Later surveys and deeds must respect the senior line.

Related: Rules of construction, Retracement
Metes and bounds

A boundary description that defines a parcel by courses, distances, and called-for monuments, beginning and ending at a known point. It is common in North Carolina deeds.

Related: Monument, Plat
Monument

A physical object, natural or artificial, that marks a boundary corner or line and is called for in a deed or plat. Monuments generally control over stated distances and directions.

Related: Rules of construction, Retracement
Rules of construction

Legal guidelines courts apply to resolve conflicting deed elements, typically ranking natural monuments first, then artificial monuments, then courses and distances, then area.

Related: Monument, Senior rights
Parol evidence

Testimony or documents outside the written deed offered to explain ambiguities or establish the location of boundaries. Courts limit its use to clarifying, not contradicting, the written instrument.

Related: Boundary by agreement, Rules of construction
Boundary by agreement

A doctrine under which adjoining owners who are uncertain about their true line agree on a boundary and treat it as binding. It usually requires uncertainty plus acquiescence or possession.

Related: Adverse possession, Parol evidence
Meander line

A survey line run along a water body to determine its approximate position for computing area. It is not itself the boundary of the upland, which usually extends to the water under state law.

Related: Riparian rights
Aliquot part

A fractional subdivision of a Public Land Survey System section described in halves and quarters, such as the northeast quarter of the southwest quarter. Used to describe land in public-land states.

Related: Plat
Retracement

A survey that follows and re-establishes an existing boundary as originally created, seeking to recover the original monument positions rather than to create a new line.

Related: Monument, Senior rights
Traverse

A series of connected survey lines whose lengths and directions are measured to determine the coordinates of points. A closed traverse returns to its starting point so error can be checked.

Related: Angular closure, Total station
Angular closure

The difference between the sum of measured traverse angles and the geometrically required sum. It indicates angular error and is distributed before coordinates are computed.

Related: Traverse, Blunder
Total station

An electronic instrument combining an electronic distance meter and a theodolite to measure angles and distances to a target, recording the data for later coordinate computation.

Related: Prism constant, Traverse
GNSS RTK

Real-time kinematic satellite positioning in which a base station or correction network sends fixes to a rover, producing centimeter-level coordinates in the field.

Related: Datum, Ellipsoid
Differential leveling

A procedure using a level and graduated rods to determine elevation differences between points by taking backsight and foresight readings and carrying elevations forward from a benchmark.

Related: Benchmark, Blunder
Prism constant

The offset between the effective reflecting point of a prism assembly and its physical mounting point, entered into the instrument to correct measured distances. A mismatch causes systematic distance error.

Related: Total station
Precision and accuracy

Precision describes how closely repeated measurements agree with each other; accuracy describes how close they are to the true value. A precise set of measurements can still be biased.

Related: Blunder, Angular closure
Blunder

A gross, human-caused mistake such as a misread rod or an incorrect target height. Unlike random error, blunders cannot be averaged out and must be detected and removed.

Related: Precision and accuracy
Benchmark

A fixed point of known elevation, often a brass disk set in stable ground or a structure, used as a reference for leveling and vertical control.

Related: Differential leveling, Datum
Geoid

The equipotential surface of Earth's gravity field that approximates mean sea level and is extended through the continents. Orthometric heights are measured relative to it.

Related: Ellipsoid, Datum
Ellipsoid

A mathematically defined, flattened sphere used as the reference surface for geodetic coordinates and satellite positioning. It approximates the shape of the Earth but is not the geoid.

Related: Geoid, Datum
Datum

A defined reference framework, including an ellipsoid and its tie to the Earth, used as the basis for horizontal or vertical coordinates. NAD83 and NAVD88 are common examples.

Related: Ellipsoid, Geoid, State Plane Coordinate System
State Plane Coordinate System

A system of projected coordinate zones designed so that grid distances closely match ground distances. North Carolina uses a single zone based on the Lambert Conformal Conic projection.

Related: Scale factor, Datum
Scale factor

The ratio between a distance on the mapping grid and the corresponding distance on the ellipsoid. Combined with an elevation factor, it converts between grid and ground distances.

Related: State Plane Coordinate System
Topology

In GIS, the set of rules defining spatial relationships such as adjacency, connectivity, and containment among features. It supports quality checking and network analysis.

Related: Metadata
Metadata

Descriptive information about a dataset covering its source, accuracy, coordinate system, and date. It lets users judge whether the data are suitable for a particular purpose.

Related: Topology
Orthophoto

An aerial image geometrically corrected so that scale is uniform and terrain displacement is removed, allowing it to serve as a map base for measuring positions.

Related: Metadata
Cut and fill

The earthwork process of removing soil where existing ground lies above design grade (cut) and adding material where it lies below (fill), balanced to minimize haul distance.

Related: Grade, Stakeout
Stakeout

The field procedure of marking planned points, lines, or grades on the ground from design coordinates so construction can proceed. Also called setting out.

Related: Cut and fill, Horizontal curve
As-built survey

A survey performed after construction to document the actual location and elevation of improvements relative to the design, often required for permitting and record drawings.

Related: Stakeout
Horizontal curve

A circular or spiral transition connecting two tangent alignments in plan view, defined by radius, degree of curve, tangent length, and other elements used for staking.

Related: Stakeout, Grade
Grade

The slope of a line or surface expressed as a percentage, ratio, or decimal, showing vertical change per horizontal unit. It is used to set elevations for drainage and construction.