Treats the number read off the load chart as the maximum weight that can be hung on the hook, then lifts a load near that figure without deducting the hook block, spreader beam, and slings.
Chart figures are studied as 'the crane's capacity,' so the subtraction step that happens on a real lift never gets practiced and the candidate answers with the chart value as the allowable load.
What to do instead
Compute allowable load = chart value for the actual radius and reeving minus the total weight of hook block, below-the-hook device, and slings; then compare against the weighed or calculated load weight, and recheck at the farthest radius the load will reach during the move.
Measures radius to the nearest edge of the load, or paces it from the wrong reference point, and reads the chart at that distance.
The edge of the load is visually obvious while the load's center of gravity is not, so the candidate anchors on the closest visible point instead of the geometric reference the chart uses.
What to do instead
Measure the horizontal distance from the crane's center of rotation to the vertical line through the load's center of gravity, and use the larger of the starting radius and the radius at the farthest point of travel.
Estimates load weight by eye or from a single guessed dimension, and leaves sling, shackle, and below-hook weight out of the total when comparing to capacity.
Exam items often describe a stack or fabricated item without a stated weight, and the candidate shortcuts to 'it looks light' rather than doing volume times density or adding rigging.
What to do instead
Use the marked or certified weight when present; otherwise compute volume times material density from a reference table, add every rigging component and attachment, and adjust for center-of-gravity offset before selecting the chart.
Uses a sling's tag capacity as if the sling were vertical when it is in a choker or basket hitch or hanging at a shallow angle, skipping the derating and angle multiplier.
The tag shows vertical capacity prominently, and the hitch derating and angle tension calculation are separate steps that get dropped under time pressure.
What to do instead
Apply the hitch derating first, then divide the load share per leg by the sine of the horizontal angle to get leg tension; keep the horizontal angle at 45 degrees or more and compare the resulting tension to the derated capacity.
Plans the lift and travel path without checking minimum approach distance to bus bars, festoon systems, energized rails, or adjacent structures, and assigns no spotter.
Overhead crane work happens indoors, so candidates conclude that power line clearance 'doesn't apply here' and skip the clearance survey entirely.
What to do instead
During the site survey, list every energized source and hard obstruction, mark the required minimum approach distance, post a dedicated spotter where required, and treat any line whose status is not verified as energized.
Ticks off the pre-shift inspection from memory without physically operating the upper and lower limit switches, checking hook throat opening and latch, or inspecting wire rope for broken wires, kinks, and end connections.
The inspection is repetitive and the candidate confuses 'I looked at the crane' with 'I function-tested each device.'
What to do instead
Follow a fixed walk-around sequence, function-test every limit and brake, and reject specific defects (hook throat opening beyond limit, missing latch, broken wire cluster, kinked rope) with a tag-out rather than a general 'looks fine.'
Drags or side-pulls a load by travelling the bridge or trolley while the load is still on the floor, and jerks loads off the floor instead of taking up slack first.
It is faster and the crane appears to tolerate it, so the candidate never connects side loading and shock loading to structural damage and tipping.
What to do instead
Spot the hoist directly over the load's center of gravity so the rope hangs vertical, take up slack, raise a few inches to verify balance and brake holding, then travel; never use bridge or trolley motion to move a grounded load.
Accepts signals from anyone on the floor, uses improvised gestures instead of the standard signal set, and keeps operating after losing sight of the signalperson or load.
Informal pointing and waving works on a real shop floor, so the candidate carries that habit into questions that test the standard signals and the one-signalperson rule.
What to do instead
Designate a single signalperson, use only the standard hand signals, stop immediately when the signal or the view is unclear, and remember that anyone may give the emergency stop signal.
Ends the shift by cutting the main disconnect with the load still on the hook or the hook at working height, leaving the pendant or key accessible and the bridge unsecured.
Shutdown feels like 'power off and leave,' so the sequence of landing the load, stowing the hook, parking the bridge, setting brakes, and locking out is never rehearsed.
What to do instead
Land the load, raise the hook to its stowed height, park bridge and trolley in the designated location, place controls in neutral or off, set the brakes, lock out and tag, then remove and secure the key.
Goes straight from a slack rope to full hoist, skipping the few-inch trial lift that checks brake holding, load balance, and that the rigging has seated.
Nothing has gone wrong on similar lifts before, so the trial lift is dropped as a formality rather than treated as a required step.
What to do instead
Lift a few inches, stop and hold, and check for load shift, sling slip, brake drift, and crane movement before continuing; re-rig if the load is not level.