NCCCO Overhead Crane flashcards
NCCCO Overhead Crane · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Power line approach distance
- Under OSHA crane rules, the minimum distance is 10 feet for lines rated 50 kV or less and increases 0.4 inch per kV above 50 kV; treat all lines as energized.
- Wind shutdown rule
- Stop outdoor lifting when wind exceeds the crane manufacturer's limit or when the load cannot be controlled with tag lines; load charts assume still air unless stated otherwise.
- Lightning safety action
- Land the load, lower the hook, and secure or move the crane according to the site plan; do not resume operation until the lightning threat has passed.
- Floor bearing check
- Before setup, confirm the slab, runway, or ground can support the crane plus its load; look for trenches, voids, soft fill, and uncompacted areas.
- Illumination stop rule
- If the operator cannot clearly see the load, hook, rigging, and signal person because of darkness, glare, or obstruction, the lift must not proceed.
- Daily crane inspection
- Before first use each shift, inspect hook, wire rope, chains, brakes, limit switches, controls, warning devices, rails, bumpers, and record any defects found.
- Hook removal criteria
- Remove a hook from service if its throat opening increased more than 15 percent, it is twisted more than 10 degrees, it is cracked, or its latch is missing or inoperative.
- Hoist brake test
- Lift a load slightly, stop the hoist, and verify the brake holds the load without drift; a brake that slips requires the crane to be taken out of service.
- Limit switch test
- Without a load and at safe speed, test upper and lower hoist limits and bridge and trolley travel limits to confirm they stop motion in the intended direction.
- Wire rope rejection
- Remove wire rope showing broken wires, kinks, birdcaging, corrosion, crushed areas, or diameter loss beyond ASME B30.2 criteria; damaged rope must not be returned to service.
- Gross load calculation
- Gross load equals the weight of the load plus the weight of all rigging, slings, shackles, spreader beams, and attachments; capacity ratings apply to this total.
- Load weight sources
- Determine weight from shipping papers, drawings, manufacturer markings, or a scale; do not rely only on appearance or volume when the actual weight is available.
- Center of gravity rule
- The hook must be positioned over the load's center of gravity; off-center lifts require multiple pick points or a plan to prevent tilt and load shift.
- Sling tension formula
- For a symmetric two-leg lift, tension per leg equals load divided by two times the sine of the angle each leg makes with horizontal: T = W/(2 sin theta).
- Sling angle effect
- As a sling leg moves closer to horizontal, tension increases; at 30 degrees from horizontal each leg carries the load divided by two times 0.5.
- No side pulling
- Hoist vertically over the load's center of gravity; side pulls, dragging, and swinging loads create forces the crane and rigging were not designed to resist.
- Test lift procedure
- Raise the load a few inches, stop, and check load stability, rigging security, brake holding, and crane response before continuing the lift.
- Suspended load rule
- Never leave a suspended load unattended and never allow personnel under or on a load; if the operator must leave the controls, land the load first.
- Power loss response
- If power fails, keep the area clear, set brakes, and lower the load using the crane's controlled lowering or emergency lowering procedure; do not allow free fall.
- Rated capacity meaning
- Rated capacity is the maximum gross load allowed for a specific crane configuration; it includes the load, rigging, and attachments and must never be exceeded.
- Load chart identification
- Before lifting, match the load chart to the crane model, serial number, reeving, trolley position, hook height, and any site-specific restrictions listed by the manufacturer.
- Variable capacity factors
- On cranes with variable ratings, capacity can change with trolley position, hoist reeving, hook height, and bridge or runway configuration; use the chart for the exact setup.
- Two-blocking prevention
- Two-blocking occurs when the hook block contacts the hoist drum or upper block; the upper limit switch and proper operator control prevent rope damage and load loss.
- Overload decision rule
- If the load weight is unknown, the chart is missing or illegible, or the calculated gross load exceeds rated capacity, do not lift until the weight and capacity are verified.
- Designated signal person
- The operator follows signals from one designated signal person; however, anyone may give an emergency stop signal, and the operator must obey it immediately.
- Hoist hand signal
- Arm extended horizontally, forearm vertical, forefinger pointing up, and hand moved in a small horizontal circle tells the operator to hoist the load.
- Stop hand signal
- Arm extended with palm down, moved back and forth horizontally, signals stop; emergency stop uses both arms extended, palms down, moved back and forth.
- Dog everything signal
- Clasp the hands in front of the body to signal the operator to dog everything, meaning secure or lock the crane motions in place.
- Normal shutdown sequence
- Land the load, raise the hook to a safe height, set brakes, neutralize controls, turn off power, and lock out the disconnect when required by site procedure.
- Outdoor crane securing
- Park at the designated location, set rail clamps or brakes, install storm anchors or tie-downs, and follow the manufacturer's wind-securing procedure when leaving the crane.
- Out-of-service tag
- Attach a lock and tag at the disconnect, remove the key, and record the defect; the crane remains out of service until a qualified person repairs it and returns it to service.
- Rigging storage
- After shutdown, inspect slings and rigging, remove them from the crane, and store them in a clean, dry area away from heat, chemicals, and sharp edges.