NCCCO Overhead Crane key terms
NCCCO Overhead Crane · Get comfortable with the vocabulary.
- Rated Capacity
- Related: Load Chart, Overload Limit Device
The maximum load a crane or hoist is designed to lift under a specific set of conditions, as published by the manufacturer in the load chart.
- Load Chart
- Related: Rated Capacity
A manufacturer-supplied table or graph showing the maximum allowable load for an overhead crane or hoist under stated conditions, such as trolley position or hoist configuration.
- Bridge
- Related: Runway, Trolley
The horizontal structural beam that spans the runway and carries the trolley and hoist. It travels along the runway rails to position loads across the bay.
- Runway
- Related: Bridge, Daily Inspection
The elevated rails or tracks, usually mounted on building columns, along which the crane bridge travels. Runway alignment and condition affect tracking and safe load handling.
- Trolley
- Related: Bridge, Load Swing
The frame and wheel assembly that rides along the bridge and supports the hoist, allowing the load to be moved horizontally across the bridge span.
- Hoist
- Related: Load Block, Upper Limit Switch
The lifting mechanism, consisting of motor, drum or chain, and reeving, that raises and lowers the load. Hoists may be electric or air powered and are rated separately from the bridge.
- Load Block
- Related: Two-Blocking, Wire Rope
The assembly of sheaves and hook suspended below the hoist by wire rope. It multiplies lifting force through reeving and must never contact the hoist drum or upper block.
- Two-Blocking
- Related: Anti-Two-Block Device, Load Block
A condition in which the load block is pulled up until it contacts the hoist's upper block or drum, which can snap wire rope, damage sheaves, and drop the load.
- Anti-Two-Block Device
- Related: Two-Blocking, Upper Limit Switch
A sensing device that stops hoisting or warns the operator before the load block contacts the upper block, preventing two-blocking damage.
- Upper Limit Switch
- Related: Anti-Two-Block Device, Function Test
A device that automatically stops the hoist when the load block reaches a set upper travel point, preventing overtravel and two-blocking.
- Overload Limit Device
- Related: Rated Capacity, Function Test
A sensor that detects when the load exceeds the hoist's rated capacity and prevents or warns against further lifting, protecting the crane structure and hoist.
- Hook Latch
- Related: Hook Throat Opening
A spring-loaded gate on the hook that closes the throat opening so slings, rings, and shackles cannot slip off during lifting.
- Hook Throat Opening
- Related: Hook Latch, Daily Inspection
The inside distance between the hook's tip and shank. It must be measured during inspection; stretching or opening beyond the manufacturer's limit requires removing the hook from service.
- Center of Gravity
- Related: Sling Angle, Load Swing
The point where a load's weight is balanced in all directions. Rigging must be arranged so the hook is above this point to keep the load level and stable.
- Sling Angle
- Related: Sling Tension, Center of Gravity
The angle measured between a sling leg and the horizontal load surface. As this angle gets smaller, the tension in each sling leg increases sharply.
- Sling Tension
- Related: Sling Angle, Rated Capacity
The pulling force carried by each sling leg. It increases as the sling angle becomes shallower and must not exceed the sling's rated capacity.
- Shackle
- Related: Hook Latch, Wire Rope
A U-shaped piece of rigging hardware closed with a pin or bolt, used to connect slings to hooks, eyes, or lifting points on a load.
- Wire Rope
- Related: Load Block, Daily Inspection
Strands of steel wire twisted into a rope used for hoisting. It must be inspected for broken wires, kinks, corrosion, and wear before each shift.
- Load Weight Determination
- Related: Center of Gravity, Rated Capacity
The process of finding a load's weight before lifting, using shipping papers, markings, calculations from material and volume, or a scale.
- Side Pull
- Related: Load Swing, Hoist
Pulling or lifting a load at an angle off the vertical, which places forces on the hoist and structure that were not designed for and can cause failure or load swing.
- Shock Loading
- Related: Sling Tension, Wire Rope
A sudden application or release of load force, as when a slack sling snaps tight or a load is dropped, producing forces far greater than the static weight.
- Load Swing
- Related: Tag Line, Side Pull
The pendulum motion of a suspended load after starting or stopping travel. It can strike people or objects and must be controlled with smooth, gradual movements.
- Tag Line
- Related: Load Swing
A rope attached to a load so a worker standing clear can control rotation and swinging without touching the load.
- Pendant Station
- Related: Function Test, Emergency Stop
The handheld control box suspended from the crane by a cable, with pushbuttons for bridge, trolley, and hoist motions. It must be kept dry, undamaged, and clearly labeled.
- Minimum Approach Distance
- Related: Barricade
The closest distance a crane, load, or rigging may come to an energized power line, set by tables based on voltage. It is measured in every direction.
- Pinch Point
- Related: Barricade
Any place where a body part or object could be caught between moving and stationary parts, such as between the load block and drum or the bridge and runway.
- Wind Loading
- Related: Load Swing
The force wind exerts on a load and crane structure. Large, light, or high-surface loads catch more wind, and lifting must stop when wind exceeds the manufacturer's limit.
- Barricade
- Related: Pinch Point, Load Swing
A physical barrier or marked boundary that keeps people out of the area beneath and around a suspended load or crane travel path.
- Daily Inspection
- Related: Wire Rope, Function Test
The visual and functional checks performed before each shift on hooks, wire rope, controls, limit devices, and runway, with any deficiency corrected or the crane locked out.
- Lockout/Tagout
- Related: Out-of-Service, Daily Inspection
The procedure of isolating a crane's power source with a lock and tag so it cannot be energized while someone inspects, repairs, or clears a fault.
- Function Test
- Related: Daily Inspection, Upper Limit Switch
Operating each motion, including bridge, trolley, hoist, and each safety device, without a load at the start of the shift to confirm controls and limit devices work.
- Standard Hand Signal
- Related: Dedicated Signal Person, Stop Signal
A prescribed hand movement used by a signal person to direct the operator. Signals are standardized so everyone on the site interprets each motion the same way.
- Dedicated Signal Person
- Related: Standard Hand Signal, Stop Signal
The person assigned to give signals to the operator for a lift. Only one person signals at a time, and the operator follows that person unless anyone gives a stop signal.
- Stop Signal
- Related: Dedicated Signal Person, Emergency Stop
A hand signal or verbal command that halts crane motion immediately. Anyone on the site may give it, and the operator must obey it regardless of who is directing the lift.
- Emergency Stop
- Related: Stop Signal, Pendant Station
A control or command that immediately cuts power to crane motions. It is used when a person or property is in danger and must be tested and kept unobstructed.
- Securing the Crane
- Related: Out-of-Service, Pendant Station
Placing the crane in a safe resting condition at the end of operation, including landing the load, raising the hook, setting controls to off, and applying brakes and locks.
- Out-of-Service
- Related: Lockout/Tagout, Securing the Crane
The condition in which a crane is removed from use because of a deficiency or planned idleness; it is locked, tagged, and reported so no one operates it.