Quick reference

Plumbing Code and Regulations

  • A plumbing permit is required before installing, altering, or replacing most plumbing systems; permits are issued by the local authority having jurisdiction (AHJ), and inspections must be requested at required stages.

  • Standard inspections typically include rough-in (before concealment), water supply and DWV pressure/head tests, and final inspection after fixtures are set and tested.

  • A test on the drainage system is commonly a water test with 10 ft (3 m) of head at the highest point, or an air test at 5 psi (34.5 kPa) held for 15 minutes with no drop.

  • A water distribution system is tested at working pressure or a minimum of 100 psi (690 kPa) for at least 15 minutes, or per the adopted code's specified test.

  • Code editions are adopted locally; the applicable edition is whichever the AHJ has adopted, so confirm the edition and local amendments rather than assuming a model code year.

  • A journeyman plumber works under a licensed master or contractor; scope of work allowed without supervision varies by jurisdiction and license class.

  • Common code definitions: fixture unit (drainage/fixture load), developed length (measured along the pipe run including fittings), and trap seal depth (typically 2 to 4 in.).

  • Vent termination must be at least 6 in. above the roof surface and not less than 3 ft from a window, door, or air intake opening, unless local code states otherwise.

  • Where a code requirement and a manufacturer's installation instruction conflict, the more restrictive requirement generally governs; manufacturer instructions must be followed for listed appliances.

Quick reference

Fixtures, Faucets, and Appliances

  • A water closet's water consumption is rated in gallons per flush (gpf); current standard tank-type fixtures are typically 1.28 gpf, with high-efficiency models at 1.28 gpf or less.

  • Fixture clearances: a water closet requires at least 15 in. from its centerline to any side wall and 21 in. of clear space in front of the bowl.

  • A lavatory requires at least 15 in. of clearance from centerline to a side wall and 21 in. from the front edge to a facing wall.

  • Fixture drain trap seal: each fixture needs its own trap, with a liquid seal of 2 to 4 in. depth; a trap must be accessible for cleaning.

  • An air gap or an air gap device provides the highest level of backflow protection at a fixture; a vacuum breaker is used where a hose connection or submerged inlet is possible.

  • A water heater temperature and pressure relief (TPR) valve discharge pipe must be full size, gravity-drained, terminate 6 to 24 in. above the floor or outside, and never be capped or reduced.

  • Fixture units: a water closet is typically 3 fixture units (drainage), a lavatory 1, a bathtub 2, and a kitchen sink 2, per the standard fixture unit table.

  • A floor drain requires a trap and a trap primer or other means to maintain the seal where evaporation can occur.

Quick reference

Water Supply and Distribution

  • Minimum static pressure at a fixture is typically 8 psi (55 kPa) for a flush tank and 15 psi (103 kPa) for a flushometer valve; maximum pressure in the distribution system is 80 psi.

  • Where pressure exceeds 80 psi, a pressure-reducing valve is required; a thermal expansion tank is needed on a closed system to absorb expansion from heating.

  • Water service pipe sizing uses the fixture-unit method: total demand fixture units, developed length, and available pressure determine the pipe size from tables.

  • Developed length includes the actual pipe run plus an allowance for fittings; use the equivalent-length table for elbows, tees, and valves.

  • Common water pipe materials: copper (Type L for underground, Type M for interior), PEX, CPVC, and galvanized steel; each has a maximum temperature and pressure rating that must not be exceeded.

  • Shutoff valves: a main shutoff at the service entry, a valve on each fixture branch, and a valve on the water heater cold inlet and hot outlet.

  • Hot water distribution: hot water should be drawn on the left and cold on the right; the water heater should be located close to the fixtures to reduce wait time and wasted water.

  • Backflow prevention: a reduced-pressure-zone (RPZ) assembly is required where a cross-connection with a high hazard exists, and it must be tested annually.

Quick reference

Drainage, Waste, and Venting

  • Drainage pipe slope: 2 in. and smaller drains at 1/4 in. per ft; 3 in. at 1/8 in. per ft; 4 in. and larger at 1/8 in. per ft, unless the code specifies otherwise.

  • A building drain is the lowest pipe receiving soil and waste inside the building; it becomes the building sewer when it exits the foundation.

  • A trap arm length is limited by pipe size: 1-1/4 in. trap arm 5 ft, 1-1/2 in. 6 ft, 2 in. 8 ft, 3 in. 12 ft, 4 in. 16 ft, measured to the vent.

  • Each trap requires a vent; a vent must rise vertically at least 6 in. above the fixture's flood-level rim before offsetting horizontally.

  • A wet vent may serve only fixtures on the same floor and must be sized per the vent table; a dry vent is a vent that carries no waste.

  • A cleanout is required at the base of a stack, at the building drain, at changes of direction greater than 45 degrees, and at intervals not exceeding 100 ft in horizontal runs.

  • A backwater valve is required where a fixture is below the level of the public sewer or where the sewer can back up into the building.

  • Vent stack and stack vent sizing depends on the total fixture units and the developed length; an undersized vent causes slow drainage and gurgling.

Quick reference

Safety, Tools, and General Knowledge

  • Before soldering or brazing, purge the line and remove all combustible material; a fire watch and a fire extinguisher are required where open flame is used.

  • Confined space entry requires atmospheric testing (oxygen, combustible gas, hydrogen sulfide) and a permit; never enter a sewer or vault without testing and a standby person.

  • Backflow and cross-connection control protect the potable supply; a hose bibb without a vacuum breaker is a common cross-connection hazard.

  • Personal protective equipment for plumbing work includes safety glasses, gloves, hearing protection when using a hammer drill, and knee pads for prolonged kneeling.

  • Common hand tools: pipe wrench (stillson), basin wrench for tight spaces under sinks, tubing cutter, deburring tool, and a spud wrench for fixture work.

  • A pressure gauge, a manometer, and a leak-detection method (soap solution or electronic detector) are used to test gas and water lines.

  • A gas leak is detected with a soap-and-water solution or an electronic detector, never with an open flame; shut off the gas before repairs.

  • Hot work near wood framing requires a heat shield and a minimum clearance from combustibles; a water heater flue must maintain clearance from combustibles per the listing.

Quick reference

Plumbing Code and Regulations

  • A plumbing permit is required before installing, altering, or replacing most plumbing systems; permits are issued by the local authority having jurisdiction (AHJ), and inspections must be requested at required stages.

  • Standard inspections typically include rough-in (before concealment), water supply and DWV pressure/head tests, and final inspection after fixtures are set and tested.

  • A test on the drainage system is commonly a water test with 10 ft (3 m) of head at the highest point, or an air test at 5 psi (34.5 kPa) held for 15 minutes with no drop.

  • A water distribution system is tested at working pressure or a minimum of 100 psi (690 kPa) for at least 15 minutes, or per the adopted code's specified test.

  • Code editions are adopted locally; the applicable edition is whichever the AHJ has adopted, so confirm the edition and local amendments rather than assuming a model code year.

  • A journeyman plumber works under a licensed master or contractor; scope of work allowed without supervision varies by jurisdiction and license class.

  • Common code definitions: fixture unit (drainage/fixture load), developed length (measured along the pipe run including fittings), and trap seal depth (typically 2 to 4 in.).

  • Vent termination must be at least 6 in. above the roof surface and not less than 3 ft from a window, door, or air intake opening, unless local code states otherwise.

  • Where a code requirement and a manufacturer's installation instruction conflict, the more restrictive requirement generally governs; manufacturer instructions must be followed for listed appliances.

Quick reference

Fixtures, Faucets, and Appliances

  • A water closet's water consumption is rated in gallons per flush (gpf); current standard tank-type fixtures are typically 1.28 gpf, with high-efficiency models at 1.28 gpf or less.

  • Fixture clearances: a water closet requires at least 15 in. from its centerline to any side wall and 21 in. of clear space in front of the bowl.

  • A lavatory requires at least 15 in. of clearance from centerline to a side wall and 21 in. from the front edge to a facing wall.

  • Fixture drain trap seal: each fixture needs its own trap, with a liquid seal of 2 to 4 in. depth; a trap must be accessible for cleaning.

  • An air gap or an air gap device provides the highest level of backflow protection at a fixture; a vacuum breaker is used where a hose connection or submerged inlet is possible.

  • A water heater temperature and pressure relief (TPR) valve discharge pipe must be full size, gravity-drained, terminate 6 to 24 in. above the floor or outside, and never be capped or reduced.

  • Fixture units: a water closet is typically 3 fixture units (drainage), a lavatory 1, a bathtub 2, and a kitchen sink 2, per the standard fixture unit table.

  • A floor drain requires a trap and a trap primer or other means to maintain the seal where evaporation can occur.

Quick reference

Water Supply and Distribution

  • Minimum static pressure at a fixture is typically 8 psi (55 kPa) for a flush tank and 15 psi (103 kPa) for a flushometer valve; maximum pressure in the distribution system is 80 psi.

  • Where pressure exceeds 80 psi, a pressure-reducing valve is required; a thermal expansion tank is needed on a closed system to absorb expansion from heating.

  • Water service pipe sizing uses the fixture-unit method: total demand fixture units, developed length, and available pressure determine the pipe size from tables.

  • Developed length includes the actual pipe run plus an allowance for fittings; use the equivalent-length table for elbows, tees, and valves.

  • Common water pipe materials: copper (Type L for underground, Type M for interior), PEX, CPVC, and galvanized steel; each has a maximum temperature and pressure rating that must not be exceeded.

  • Shutoff valves: a main shutoff at the service entry, a valve on each fixture branch, and a valve on the water heater cold inlet and hot outlet.

  • Hot water distribution: hot water should be drawn on the left and cold on the right; the water heater should be located close to the fixtures to reduce wait time and wasted water.

  • Backflow prevention: a reduced-pressure-zone (RPZ) assembly is required where a cross-connection with a high hazard exists, and it must be tested annually.

Quick reference

Drainage, Waste, and Venting

  • Drainage pipe slope: 2 in. and smaller drains at 1/4 in. per ft; 3 in. at 1/8 in. per ft; 4 in. and larger at 1/8 in. per ft, unless the code specifies otherwise.

  • A building drain is the lowest pipe receiving soil and waste inside the building; it becomes the building sewer when it exits the foundation.

  • A trap arm length is limited by pipe size: 1-1/4 in. trap arm 5 ft, 1-1/2 in. 6 ft, 2 in. 8 ft, 3 in. 12 ft, 4 in. 16 ft, measured to the vent.

  • Each trap requires a vent; a vent must rise vertically at least 6 in. above the fixture's flood-level rim before offsetting horizontally.

  • A wet vent may serve only fixtures on the same floor and must be sized per the vent table; a dry vent is a vent that carries no waste.

  • A cleanout is required at the base of a stack, at the building drain, at changes of direction greater than 45 degrees, and at intervals not exceeding 100 ft in horizontal runs.

  • A backwater valve is required where a fixture is below the level of the public sewer or where the sewer can back up into the building.

  • Vent stack and stack vent sizing depends on the total fixture units and the developed length; an undersized vent causes slow drainage and gurgling.

Quick reference

Safety, Tools, and General Knowledge

  • Before soldering or brazing, purge the line and remove all combustible material; a fire watch and a fire extinguisher are required where open flame is used.

  • Confined space entry requires atmospheric testing (oxygen, combustible gas, hydrogen sulfide) and a permit; never enter a sewer or vault without testing and a standby person.

  • Backflow and cross-connection control protect the potable supply; a hose bibb without a vacuum breaker is a common cross-connection hazard.

  • Personal protective equipment for plumbing work includes safety glasses, gloves, hearing protection when using a hammer drill, and knee pads for prolonged kneeling.

  • Common hand tools: pipe wrench (stillson), basin wrench for tight spaces under sinks, tubing cutter, deburring tool, and a spud wrench for fixture work.

  • A pressure gauge, a manometer, and a leak-detection method (soap solution or electronic detector) are used to test gas and water lines.

  • A gas leak is detected with a soap-and-water solution or an electronic detector, never with an open flame; shut off the gas before repairs.

  • Hot work near wood framing requires a heat shield and a minimum clearance from combustibles; a water heater flue must maintain clearance from combustibles per the listing.