ND Journeyman Plumber study plan
ND Journeyman Plumber · Give each week a clear focus.
8 weeks · About 6 hours per week
Drainage, Waste, and Venting & Plumbing Code and Regulations
Map the drainage, waste, and venting chapters of the applicable plumbing code and list every table and definition you will be tested on
Define fixture unit, drainage fixture unit, and developed length from memory and state where each appears in sizing calculations
Trace a simple DWV layout from a water closet to the building drain and label trap arm, fixture branch, soil stack, vent stack, and building sewer
Explain the difference between a vent stack, stack vent, and individual vent without notes
Build a personal glossary of 25 code-defined plumbing terms in your own words
Your checkpoint
A hand-drawn DWV riser diagram of a one-bathroom dwelling with every pipe, fitting, and vent labeled and each component tied to a code section number
Drainage, Waste, and Venting
Size horizontal fixture branches and building drains using drainage fixture unit tables for at least three worked examples
Calculate correct trap arm length and fall limits for a given pipe diameter and demonstrate why an oversized trap arm vents poorly
Identify where cleanouts are required by distance, direction change, and pipe size, and mark them on your practice diagram
Diagnose five common venting failures (flat vent, crown vent, excessive trap arm, missing vent, wet vent misuse) and state the fix for each
Sketch a wet vent arrangement that complies with code and list its restrictions
Your checkpoint
A worked sizing packet with three complete DWV sizing problems showing fixture unit counts, table lookups, pipe sizes, and slope calculations
Water Supply and Distribution & Plumbing Code and Regulations
Convert between pressure, head, and fixture demand to explain how a water supply system is sized from the meter to the farthest fixture
Size water service and distribution piping for a single-family dwelling using demand tables and developed length plus equivalent fitting length
List the minimum fixture flow pressures and explain what happens to a system when a flushometer valve is starved
Describe backflow prevention requirements and match each device type to the hazard it controls
Identify the code provisions governing water heater temperature and pressure relief piping and termination
Your checkpoint
A complete water supply sizing worksheet for a two-bathroom house including demand in fixture units, developed length, equivalent length, and final pipe sizes
Water Supply and Distribution & Drainage, Waste, and Venting
Explain thermal expansion control and locate the required devices on a closed system
Compare PEX, copper, CPVC, and galvanized piping by joining method, pressure rating, and code restrictions
Trace a combined water and DWV layout for a two-story house and resolve conflicts between pipe runs and structural members
State the required air gap and backflow protection for each fixture type that can create a cross-connection
Recite the standard test procedures for DWV and water supply rough-in inspections
Your checkpoint
A two-story rough-in plan with supply and DWV routes drawn on the same sheet and a written inspection test checklist for each system
Fixtures, Faucets, and Appliances
Classify at least 20 fixtures and appliances by trap requirement, vent requirement, and minimum clearance
State the water closet and urinal rough-in dimensions, mounting heights, and required clearances from memory
Explain the difference between a fixture outlet, trap seal, and trap arm and demonstrate how each affects installation layout
Identify the code requirements for indirect waste, air gaps, and floor drains in food service and mechanical spaces
Match common faucet and valve types to their applications, including tempering valves and anti-scald devices
Your checkpoint
A fixture data sheet covering 20 fixtures with rough-in dimensions, trap size, flow or flush rate, clearance, and applicable code reference
Plumbing Code and Regulations & Fixtures, Faucets, and Appliances
Work through the permit, inspection, and testing sequence for a residential project from rough-in to final
State the accessibility and clearance requirements that affect fixture placement in commercial restrooms
Explain the code provisions for trap primers, fixture supports, and fixture setting that inspectors commonly cite
Answer 40 practice questions on fixtures and code and record the reason for every miss
Rewrite each missed question as a one-line rule you can recall on the job
Your checkpoint
A 40-question practice set scored and fully corrected, with a one-page rule sheet of the concepts you missed
Safety, Tools, and General Knowledge & Plumbing Code and Regulations
Demonstrate safe handling and storage procedures for gas cylinders, solvents, and solder on a job site
Explain confined space, trenching, and ladder safety requirements that apply to plumbing work
Identify the correct tool for at least 15 common plumbing tasks and describe the maintenance each tool needs
State the code rules for pipe support spacing, hangers, and protection of piping from freezing and physical damage
Describe the steps for a gas piping pressure test and the safety precautions required before and during the test
Your checkpoint
A safety and tools quick-reference card covering 15 tools, five job-site hazards, and the pipe support spacing table
Plumbing Code and Regulations & Fixtures, Faucets, and Appliances & Water Supply and Distribution & Drainage, Waste, and Venting & Safety, Tools, and General Knowledge
Take two full-length timed practice exams and score each by domain to find remaining weak areas
Re-study only the two lowest-scoring domains and re-test those domains until you exceed 80 percent
Recite the top 30 code numbers, tables, and definitions you are most likely to be asked
Build a one-page formula and conversion sheet covering pressure, head, fixture units, slope, and developed length
Simulate the exam-day routine including timing, breaks, and question-flagging strategy
Your checkpoint
Two scored timed exams with a domain-by-domain score log and a final one-page formula and code reference sheet
Milestones
Week 2: Score at least 75 percent on a 20-question DWV sizing and venting quiz without notes
Week 4: Complete the two-story rough-in plan and pass a self-graded inspection checklist with no unresolved code conflicts
Week 6: Score at least 80 percent on the 40-question fixtures and code practice set after correction
Week 8: Score at least 80 percent overall on both timed practice exams with no domain below 70 percent