ND Journeyman Plumber study materials
ND Journeyman Plumber study resources

ND Journeyman Plumber study plan

ND Journeyman Plumber · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Drainage, Waste, and Venting & Plumbing Code and Regulations

  • Map the drainage, waste, and venting chapters of the applicable plumbing code and list every table and definition you will be tested on

  • Define fixture unit, drainage fixture unit, and developed length from memory and state where each appears in sizing calculations

  • Trace a simple DWV layout from a water closet to the building drain and label trap arm, fixture branch, soil stack, vent stack, and building sewer

  • Explain the difference between a vent stack, stack vent, and individual vent without notes

  • Build a personal glossary of 25 code-defined plumbing terms in your own words

Your checkpoint

A hand-drawn DWV riser diagram of a one-bathroom dwelling with every pipe, fitting, and vent labeled and each component tied to a code section number

Week 2

Drainage, Waste, and Venting

  • Size horizontal fixture branches and building drains using drainage fixture unit tables for at least three worked examples

  • Calculate correct trap arm length and fall limits for a given pipe diameter and demonstrate why an oversized trap arm vents poorly

  • Identify where cleanouts are required by distance, direction change, and pipe size, and mark them on your practice diagram

  • Diagnose five common venting failures (flat vent, crown vent, excessive trap arm, missing vent, wet vent misuse) and state the fix for each

  • Sketch a wet vent arrangement that complies with code and list its restrictions

Your checkpoint

A worked sizing packet with three complete DWV sizing problems showing fixture unit counts, table lookups, pipe sizes, and slope calculations

Week 3

Water Supply and Distribution & Plumbing Code and Regulations

  • Convert between pressure, head, and fixture demand to explain how a water supply system is sized from the meter to the farthest fixture

  • Size water service and distribution piping for a single-family dwelling using demand tables and developed length plus equivalent fitting length

  • List the minimum fixture flow pressures and explain what happens to a system when a flushometer valve is starved

  • Describe backflow prevention requirements and match each device type to the hazard it controls

  • Identify the code provisions governing water heater temperature and pressure relief piping and termination

Your checkpoint

A complete water supply sizing worksheet for a two-bathroom house including demand in fixture units, developed length, equivalent length, and final pipe sizes

Week 4

Water Supply and Distribution & Drainage, Waste, and Venting

  • Explain thermal expansion control and locate the required devices on a closed system

  • Compare PEX, copper, CPVC, and galvanized piping by joining method, pressure rating, and code restrictions

  • Trace a combined water and DWV layout for a two-story house and resolve conflicts between pipe runs and structural members

  • State the required air gap and backflow protection for each fixture type that can create a cross-connection

  • Recite the standard test procedures for DWV and water supply rough-in inspections

Your checkpoint

A two-story rough-in plan with supply and DWV routes drawn on the same sheet and a written inspection test checklist for each system

Week 5

Fixtures, Faucets, and Appliances

  • Classify at least 20 fixtures and appliances by trap requirement, vent requirement, and minimum clearance

  • State the water closet and urinal rough-in dimensions, mounting heights, and required clearances from memory

  • Explain the difference between a fixture outlet, trap seal, and trap arm and demonstrate how each affects installation layout

  • Identify the code requirements for indirect waste, air gaps, and floor drains in food service and mechanical spaces

  • Match common faucet and valve types to their applications, including tempering valves and anti-scald devices

Your checkpoint

A fixture data sheet covering 20 fixtures with rough-in dimensions, trap size, flow or flush rate, clearance, and applicable code reference

Week 6

Plumbing Code and Regulations & Fixtures, Faucets, and Appliances

  • Work through the permit, inspection, and testing sequence for a residential project from rough-in to final

  • State the accessibility and clearance requirements that affect fixture placement in commercial restrooms

  • Explain the code provisions for trap primers, fixture supports, and fixture setting that inspectors commonly cite

  • Answer 40 practice questions on fixtures and code and record the reason for every miss

  • Rewrite each missed question as a one-line rule you can recall on the job

Your checkpoint

A 40-question practice set scored and fully corrected, with a one-page rule sheet of the concepts you missed

Week 7

Safety, Tools, and General Knowledge & Plumbing Code and Regulations

  • Demonstrate safe handling and storage procedures for gas cylinders, solvents, and solder on a job site

  • Explain confined space, trenching, and ladder safety requirements that apply to plumbing work

  • Identify the correct tool for at least 15 common plumbing tasks and describe the maintenance each tool needs

  • State the code rules for pipe support spacing, hangers, and protection of piping from freezing and physical damage

  • Describe the steps for a gas piping pressure test and the safety precautions required before and during the test

Your checkpoint

A safety and tools quick-reference card covering 15 tools, five job-site hazards, and the pipe support spacing table

Week 8

Plumbing Code and Regulations & Fixtures, Faucets, and Appliances & Water Supply and Distribution & Drainage, Waste, and Venting & Safety, Tools, and General Knowledge

  • Take two full-length timed practice exams and score each by domain to find remaining weak areas

  • Re-study only the two lowest-scoring domains and re-test those domains until you exceed 80 percent

  • Recite the top 30 code numbers, tables, and definitions you are most likely to be asked

  • Build a one-page formula and conversion sheet covering pressure, head, fixture units, slope, and developed length

  • Simulate the exam-day routine including timing, breaks, and question-flagging strategy

Your checkpoint

Two scored timed exams with a domain-by-domain score log and a final one-page formula and code reference sheet

Milestones

Week 2: Score at least 75 percent on a 20-question DWV sizing and venting quiz without notes

Week 4: Complete the two-story rough-in plan and pass a self-graded inspection checklist with no unresolved code conflicts

Week 6: Score at least 80 percent on the 40-question fixtures and code practice set after correction

Week 8: Score at least 80 percent overall on both timed practice exams with no domain below 70 percent