NETA ETT Level 2 study materials
NETA ETT Level 2 study resources

NETA ETT Level 2 case studies

NETA ETT Level 2 · Put your knowledge to work in context.

The NETA Electrical Testing Technician (ETT) credential is offered by the InterNational Electrical Testing Association (NETA), the trade association whose published site lists a Technician Certification Exam alongside exam preparation, exam reminders, and a practice exam under its Certification section. NETA also maintains the ANSI/NETA ETT standard, which appears among its ANSI/NETA standards family (including ATS, MTS, ECS, and EMW), indicating that the ETT designation is tied to a recognized standard for electrical testing technicians. The NETA ETT Level 2 case studies are 5 cases and about 4,105 words.

1

Stale Arc Flash Label and a Racked Bucket

A 480 V, three-phase MCC in a food plant carries a label reading "Incident Energy 12.0 cal/cm² at 18 in; AFB 8 ft." The study behind it used a utility fault contribution of 22 kA. The utility has just issued a new available-fault letter: 34 kA at the service.

791 words, about 4 min
2

Starter Drops Out and a Phantom Voltage on the Run Light

A 480 V, 25 hp irrigation pump has a 120 V control circuit fed from a 500 VA control power transformer. The print shows: fuse → NC overload contact → NC STOP pushbutton → NO START pushbutton → starter coil, with a holding contact parallel to START.

856 words, about 4 min
3

Falling Polarization Index on a 4.16 kV Motor

A 4160 V, 1500 hp TEFC induction motor comes out of service for its annual shutdown. Leads are disconnected and grounded for 10 minutes.

796 words, about 4 min
4

Acceptance Testing a Relocated 1500 kVA Dry-Type Transformer

A 1500 kVA, 13.8 kV delta–480Y/277 V dry-type transformer is being acceptance tested after being moved from another plant. Nameplate ratio H-X is 28.75:1.

821 words, about 4 min
5

Steady Current on the Grounding Electrode Conductor

A 2000 A, 480Y/277 V double-ended switchboard is fed by two 1000 kVA transformers with a normally open tie. During a site survey, a clamp-on ammeter on the grounding electrode conductor at the main bonding jumper reads a steady 21 A.

841 words, about 4 min