NICET EPT study materials
NICET EPT study resources

NICET EPT cheat sheet

NICET EPT · Keep the key ideas within reach.

Quick reference

Electrical Safety, Codes, and Standards

  • NFPA 70E defines the arc flash boundary as the distance from exposed live parts where incident energy equals 1.2 cal/cm², the threshold for second-degree burns.

  • NFPA 70E limited approach boundary for exposed live parts 0–750 V is 10 ft 0 in for movable conductors and 3 ft 6 in for fixed circuit parts.

  • Restricted approach boundary is 1 ft 0 in for 301–750 V and 'avoid contact' below 301 V; crossing it requires shock protection and an energized work permit.

  • OSHA 29 CFR 1910.333(a)(1) requires de-energizing live parts before work unless doing so introduces a greater hazard or is infeasible due to equipment design or operational limitations.

  • OSHA 29 CFR 1910.147 governs lockout/tagout; zero-energy state must be verified by test, not by indicator lamps or relay position alone.

  • Test instrument CAT rating must meet or exceed the location: CAT IV at service entrance and utility, CAT III at panelboards and feeders, CAT II at receptacle branch circuits.

  • Live-dead-live verification: test the instrument on a known live source, test the isolated conductor, then retest the known live source; a non-contact tester alone is not proof of de-energization.

  • IEEE 1584 calculates incident energy empirically from bolted fault current, electrode gap, working distance, and protective device clearing time; clearing time dominates the result.

  • Arc-rated PPE system rating in cal/cm² must equal or exceed the calculated incident energy; non-melting underlayers are required beneath arc-rated outer layers.

Quick reference

Power System Fundamentals and Circuit Analysis

  • Three-phase power: P = √3 × V_LL × I_L × cos θ; apparent power S = √3 × V_LL × I_L; reactive power Q = √3 × V_LL × I_L × sin θ.

  • Wye: V_LL = √3 × V_LN and I_line = I_phase. Delta: V_LL = V_phase and I_line = √3 × I_phase.

  • Per unit: Z_pu = Z_actual / Z_base, where Z_base = V_base² / S_base; using kV and MVA gives Z_base directly in ohms.

  • Capacitor size for power-factor correction: Q_c (kVAr) = P (tan θ₁ − tan θ₂), where θ₁ is the existing and θ₂ the target power-factor angle.

  • Available secondary short-circuit current with an infinite primary bus: I_sc ≈ I_FLA / (%Z / 100); a 5%Z transformer yields about 20 times rated current.

  • Symmetrical components resolve an unbalanced three-phase set into positive-, negative-, and zero-sequence sets so unbalanced faults can be solved with single-phase networks.

  • X/R ratio at the fault point sets the DC offset; a fault at voltage zero gives maximum offset, and the first-cycle peak can approach 2.7 times the RMS symmetrical value at high X/R.

  • Voltage THD = √(Σ V_h² for h ≥ 2) / V_1 × 100%; K-rated transformers are specified where harmonic currents from non-linear loads are significant.

  • Real power flows from the generating source to the load; reactive power oscillates and is controlled locally by capacitors, reactors, and generator excitation.

Quick reference

Transformers, Switchgear, and Distribution Equipment

  • Ideal transformer relations: V₁/V₂ = N₁/N₂ and I₁/I₂ = N₂/N₁; the kVA rating is essentially the same on both windings.

  • Percent impedance fixes both voltage regulation and available fault current; a lower %Z gives better regulation but higher short-circuit duty on downstream equipment.

  • ANSI standard polarity is subtractive: H1 and X1 bushings are diagonally opposite, and when H1 is instantaneously positive, X1 is also positive.

  • Delta–wye transformers introduce a 30° phase shift; paralleling requires matching ratio, polarity, impedance, and phase displacement.

  • Turns-ratio test (TTR) verifies nameplate ratio and polarity; deviations beyond roughly 0.5% of nameplate warrant investigation of taps or shorted turns.

  • Sweep frequency response analysis (SFRA) compares a winding fingerprint to a baseline to detect winding deformation, core movement, or clamping loss.

  • Switchgear interrupting rating is the maximum symmetrical RMS short-circuit current it can clear at rated voltage; close-and-latch (momentary) rating covers peak first-cycle mechanical duty.

  • Basic impulse level (BIL) is the lightning-impulse withstand voltage of the insulation; it must be coordinated with, and exceed, the surge arrester protective level.

  • A Buchholz relay on an oil-filled transformer alarms on accumulated gas and trips on a sudden oil surge caused by an internal fault.

Quick reference

Rotating Machinery and Motor Controls

  • Synchronous speed N_s = 120 f / P; percent slip = (N_s − N_r) / N_s × 100.

  • NEMA Design B is the general-purpose induction motor design; locked-rotor current is typically 5 to 7 times full-load current.

  • Running overload protection is set from motor nameplate FLA using an inverse-time (I²t) characteristic; branch-circuit short-circuit protection is a separate device.

  • IEEE 43 rule of thumb for minimum insulation resistance: IR_min (MΩ) = rated winding kV + 1, measured at the specified DC test voltage.

  • Polarization index = R at 10 minutes / R at 1 minute; values below 2.0 indicate moisture, contamination, or insulation degradation.

  • Across-the-line starting draws the highest inrush; reduced-voltage methods (star-delta, autotransformer, soft starter, VFD) limit starting kVA and mechanical shock.

  • PWM drive output produces high dv/dt and reflected-wave overvoltage on long motor leads; inverter-duty motors, load reactors, and filters mitigate the stress.

  • Service factor 1.15 permits continuous output up to 115% of nameplate only when voltage, frequency, and ambient are at rated conditions.

  • Voltage unbalance produces negative-sequence current and rotor heating; NEMA MG1 requires derating when unbalance exceeds 1%.

Quick reference

Protective Relaying, Instrumentation, and Control

  • ANSI/IEEE device numbers: 50 instantaneous overcurrent, 51 AC time overcurrent, 87 differential, 27 undervoltage, 59 overvoltage, 21 distance, 86 lockout relay.

  • Coordination sets pickup and time dial so the device closest to the fault clears first; time-current curves must not overlap in the fault-current range.

  • CT performance is defined by accuracy class and burden in VA; a saturated CT distorts secondary current and can cause slow or failed tripping.

  • Transformer 87T differential schemes use second-harmonic restraint to block tripping during magnetizing inrush and fifth-harmonic restraint for overexcitation.

  • Current-loop convention: 4 mA is live zero and 20 mA is full scale; a 250 Ω sense resistor converts the loop to 1–5 V for the input card.

  • Secondary injection verifies relay pickup, timing, and logic at the terminals; primary injection verifies the full CT, VT, and wiring path.

  • Protective zones must overlap at each boundary so no bus, breaker, or conductor is left unprotected.

  • Directional overcurrent (67) requires the correct polarizing quantity and correct CT/PT polarity; reversed polarity makes a forward fault appear reverse.

Quick reference

Cables, Grounding, and Insulation Systems

  • NEC ampacity tables give base values that must be corrected for ambient temperature and adjusted for more than three current-carrying conductors in a raceway or cable.

  • Insulation resistance testing uses DC at a level set by the standard: commonly 500 V DC for equipment rated up to 1 kV and higher voltages for medium-voltage apparatus.

  • IEEE 400.2 identifies 0.1 Hz very-low-frequency AC as the preferred field withstand test for shielded power cable; DC hi-potential testing is not recommended for XLPE.

  • Wenner four-pin soil resistivity: ρ = 2πaR, with pin spacing a in meters and measured resistance R in ohms, giving ohm-meters.

  • Fall-of-potential grounding test places the potential probe at 62% of the distance to the current probe; flat readings at 52% and 72% confirm a valid measurement.

  • NEC 250.53(A)(2): a single rod, pipe, or plate electrode must show 25 Ω or less to ground, otherwise a supplemental electrode is required.

  • IEEE 80 substation grounding design limits step and touch voltages to body-withstand values computed for the actual protective clearing time.

  • Time-domain reflectometry locates a cable fault from the round-trip echo: distance = (propagation velocity × time) / 2.

  • Partial discharge testing detects voids, delamination, and tracking at voltages below breakdown; results are judged against baseline or specified picocoulomb limits.

Quick reference

Field Testing, Commissioning, and Documentation

  • ANSI/NETA ATS specifies acceptance testing for electrical power equipment and systems; ANSI/NETA ETT covers qualifications of electrical testing technicians.

  • As-found data are recorded before any adjustment and as-left data after; the comparison against acceptance criteria drives the accept, repair, or replace decision.

  • Energization sequence: visual and mechanical inspection, insulation resistance, continuity and point-to-point wiring checks, protective device functional tests, then energization.

  • Motor rotation and phase sequence must be verified before the motor is coupled to driven equipment.

  • Factory acceptance testing occurs at the manufacturer's works; site acceptance testing verifies installation, wiring, and interfaces in the field.

  • Loop checks verify the complete measurement path from field sensor through scaling, display, and alarm setpoints in the control system.

  • Infrared surveys are meaningful only under load; a commonly used minimum is about 40% of rated load so loose connections produce detectable temperature rise.

  • Handover documentation includes as-built drawings, O&M manuals, final relay settings, test reports, and calibration certificates for test instruments.