NITC Master Plumber study materials
NITC Master Plumber study resources

NITC Master Plumber cheat sheet

NITC Master Plumber · Keep the key ideas within reach.

Quick reference

Plumbing Systems Design and Layout

  • Fixture units (FU) convert dissimilar fixtures to a common load measure; 1 FU = 1 gpm (0.06 L/s) of drainage or supply demand for sizing purposes.

  • Hunter's curve relates total fixture units to probable peak flow; peak demand is far below the arithmetic sum of fixture flows because of non-coincident use.

  • Minimum building drain slope: 1/4 in per ft (2%) for pipe 4 in and smaller; 1/8 in per ft (1%) for 5 in and larger where solids transport is verified.

  • Horizontal drainage branch length limits: 1-1/2 in pipe = 6 ft, 2 in = 8 ft, 3 in = 12 ft before a vent is required (typical code basis).

  • Water service sizing uses peak demand in gpm plus pressure loss through meter, backflow preventer, and developed length with fittings.

  • Developed length includes all horizontal and vertical pipe plus fitting equivalents; add 50% for fittings in preliminary sizing.

  • Pressure budget rule: minimum 8 psi (55 kPa) residual at the most remote fixture, with 15 psi typical for flushometer valves.

  • Plan layout order: locate fixtures and stacks, route building drain to sewer, then size vents and water mains from the most remote fixture back.

Quick reference

Water Supply and Distribution Systems

  • Velocity limits for sizing: 8 ft/s (2.4 m/s) in general distribution, 4-5 ft/s in basement or high-use runs to limit noise and erosion.

  • Copper type selection: Type L for typical domestic water, Type M only where permitted for above-ground; K for underground and buried service.

  • PEX expansion fittings require ASTM F1960; crimp/clamd rings use ASTM F1807; do not mix fitting systems across manufacturers.

  • Thermal expansion: closed systems with backflow preventers need an expansion tank sized to system volume and temperature rise.

  • Water pressure booster required when street pressure cannot deliver 8 psi residual at the topmost fixture after friction and elevation losses.

  • Static pressure gain: 1 psi per 2.31 ft of elevation drop (0.433 psi/ft); use for multi-story pressure checks.

  • Shock arrestors within 6 ft of quick-closing valves; water hammer arrestors sized by fixture units per ASSE 1010.

  • Minimum main size for a building water service is typically 3/4 in; flushometer systems need larger mains to control pressure drop.

Quick reference

Sanitary Drainage, Waste, and Venting

  • Slope and size together govern capacity; a 4 in building drain at 1/4 in/ft carries about 216 fixture units (typical code table).

  • Vent stack sizing: a 1-1/2 in vent serves up to 8 fixture units; 2 in up to 24 FU; 3 in up to 84 FU (typical code basis).

  • Trap arm limits: developed length from trap weir to vent fitting must not exceed the trap arm length for that pipe size (e.g., 1-1/2 in = 6 ft).

  • Each trap needs a vent; common venting is allowed only when both fixtures are on the same floor and within the vertical distance limits.

  • Horizontal drain fittings: use long-turn (DWV) fittings for horizontal-to-horizontal changes; sanitary tees only for vertical-to-horizontal.

  • Cleanouts required at the base of each stack, at building drain intervals of 100 ft, and at changes of direction over 45 degrees.

  • Air admittance valves (AAV) per ASSE 1051/1050 may replace individual vents where the code adopts them; not for toilet fixture drains in most codes.

  • Backwater valve required on fixtures below the next upstream manhole cover elevation to prevent sewer backup.

Quick reference

Storm Drainage and Special Waste Systems

  • Roof drain sizing uses 100-year, 1-hour rainfall intensity (in/hr) from local data; flow (gpm) = area (ft2) x intensity x 0.0104.

  • Vertical leader capacity exceeds horizontal storm drain capacity for the same diameter; size leaders and horizontal runs separately.

  • Primary roof drains plus secondary/scuppers: secondary system must handle the design storm if primary is blocked.

  • Sump pump and elevator pit drainage discharge to storm or approved receptor, never to sanitary sewer where prohibited.

  • Grease interceptors sized by fixture units or flow rate and retention time; typical 2-hour retention for restaurant waste.

  • Oil/sand separators required for garage and vehicle-wash drainage; sized by flow rate per manufacturer and code.

  • Indirect waste receptors require an air gap of at least twice the effective pipe opening, minimum 1 in.

  • Acid waste systems use corrosion-resistant pipe (glass, polypropylene, PVDF) with neutralization before discharge.

Quick reference

Fixtures, Faucets, and Fixture Fittings

  • Water closet flush volumes: 1.28 gpf (4.8 L) standard; 1.6 gpf older; commercial flushometer valves typically 1.28-1.6 gpf.

  • Urinal flush volumes: 0.125-1.0 gpf; waterless urinals use a sealant cartridge and require special drain maintenance.

  • Fixture spacing: 15 in minimum from centerline of water closet to side wall or partition; 30 in minimum clear width.

  • Lavatory faucet flow limited to 1.5 gpm at 60 psi; showerheads 2.0 gpm; kitchen faucets 2.2 gpm (federal standards).

  • Air gap for fixture outlets: minimum 1 in or twice the effective opening, whichever is greater, above the flood-level rim.

  • Flood-level rim of a fixture is the point where water overflows; the critical level for backflow protection is measured from it.

  • Fixture carriers support water closets and wall-hung fixtures; floor-mounted carriers must resist 250 lb vertical and 250 lb horizontal loads.

  • Trap seal depth: 2-4 in (50-100 mm); deeper seals risk slow flow, shallower seals risk evaporation and sewer gas.

Quick reference

Water Heaters and Hot Water Systems

  • Storage tank sizing: first-hour rating (FHR) must meet peak-hour demand; FHR depends on tank volume and recovery rate.

  • Recovery rate (gph) = input BTU/hr x efficiency / (8.33 lb/gal x temperature rise x 1 BTU/lb-F).

  • Temperature and pressure relief valve (T&P) set at 210 F and 150 psi typical; discharge to a receptor within 6 in of the floor.

  • T&P discharge pipe must be full size, gravity-drained, and terminate with an air gap; no traps, no reducing fittings.

  • Thermal expansion tank required on closed systems; size to 2-5% of system volume or per manufacturer chart.

  • Combustion air: 50 ft3 per 1,000 BTU/hr input for confined spaces; two openings, one near top and one near bottom.

  • Recirculation systems: demand (on-demand) pumps save energy vs continuous; balance valve required to prevent short cycling.

  • Scald protection: tempering valve or thermostatic mixing valve at 120 F max for domestic hot water at fixtures.

Quick reference

Plumbing Code, Standards, and Permits

  • Permit required before installing, altering, or replacing plumbing; minor repairs may be exempt per local amendment.

  • Inspection sequence: rough-in (before concealment), top-out, final; each must pass before the next stage.

  • ICC IPC and IAPMO UPC are the two dominant US model codes; local jurisdiction adopts one with amendments.

  • ASTM standards cover materials (e.g., ASTM D2665 PVC DWV, ASTM B88 copper tube); ASSE covers backflow and fixture fittings.

  • Code adoption: model code becomes law only when adopted by the authority having jurisdiction (AHJ).

  • Variance/alternate materials request must be submitted in writing to the AHJ with supporting test data or engineering.

  • Certificate of occupancy requires final plumbing inspection sign-off; no occupancy before final approval.

  • Contractor licensing and bonding are separate from code compliance; verify state and local license requirements.

Quick reference

Backflow Prevention and Cross-Connection Control

  • Air gap is the highest protection (RPZ equivalent); minimum 1 in or twice the effective opening.

  • RPZ (reduced pressure zone) assembly: testable, protects against both backpressure and backsiphonage; check valve differential typically 5 psi.

  • Double check valve assembly (DCVA) protects against backpressure only; not for health hazards.

  • Pressure vacuum breaker (PVB) protects against backsiphonage only; cannot be used where backpressure exists and must be installed 12 in above highest downstream outlet.

  • Atmospheric vacuum breaker (AVB) is non-testable; used on hose bibbs and irrigation, must be 6 in above highest downstream point.

  • Annual testing of testable assemblies by a certified tester; records kept and submitted to the water authority.

  • Cross-connection survey identifies actual and potential connections; hazard classification (health vs non-health) drives assembly selection.

  • Thermal expansion control needed downstream of any backflow preventer because it creates a closed system.

Quick reference

System Testing, Inspection, and Troubleshooting

  • DWV water test: fill system with water to 10 ft head above highest tested point, hold 15 minutes minimum before inspection.

  • DWV air test: 5 psi (35 kPa) for 15 minutes with gauge not dropping; use only where water test is impractical.

  • Water supply test: hydrostatic at 100 psi or working pressure plus 50 psi, whichever is greater, for at least 1 hour.

  • Final inspection verifies fixture operation, trap seals, vent termination height (6 in above roof, 10 ft from openings), and labeling.

  • Smoke test locates sewer gas leaks in DWV; blow smoke into system and observe for escape at joints.

  • Pressure drop diagnosis: if gauge drops, isolate sections with test plugs to localize the leak before cutting.

  • Trap seal loss causes: evaporation, capillary action, wind effect, momentum, backpressure; each has a different fix.

  • Water hammer diagnosis: check arrestor charge, valve closure speed, and pipe support spacing before adding devices.

Quick reference

Project Management, Estimating, and Safety

  • Labor unit estimating: labor hours = quantity x labor unit (hr/unit); apply productivity factor for site conditions.

  • Material takeoff includes pipe, fittings, hangers, valves, and 5-10% waste allowance for cuts and breakage.

  • Critical path method (CPM) identifies the longest sequence of dependent tasks; plumbing rough-in usually precedes drywall and follows framing.

  • Change order must document scope, cost, and schedule impact; no work without written authorization.

  • Trench safety: protective system required at 5 ft depth or deeper; spoil pile at least 2 ft from edge.

  • Confined space entry requires atmospheric testing (O2, LEL, H2S, CO), attendant, and rescue plan.

  • Soldering and brazing require fire watch, hot work permit, and clearance from combustibles; PPE includes gloves and eye protection.

  • Ladder and scaffold safety: 4:1 ladder angle, 3-point contact, and fall protection above 6 ft in construction.