NITC Master Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plumbing Systems Design and Layout & Sanitary Drainage, Waste, and Venting

  • Draft a one-page schematic of a two-story single-family DWV system showing every fixture, trap, and vent connection, then annotate each pipe with its required size and slope.

  • Compute the drainage fixture unit (dfu) load for the whole building and for each branch, and verify the building drain and building sewer sizes against a locally adopted code table.

  • Calculate the required vent stack and stack-vent sizes for the same layout and explain in writing why each wet vent is or is not permitted.

  • List the horizontal-to-vertical and vertical-to-horizontal drainage fitting rules that apply at each transition on your schematic, citing the code section number for each.

Your checkpoint

A single annotated DWV isometric drawing with a dfu load table, pipe-size schedule, and code citations for every sizing decision.

Week 2

Sanitary Drainage, Waste, and Venting & Plumbing Systems Design and Layout

  • Redraw the week-1 layout for a three-story mixed-use building with stacked toilet groups and a pumped discharge, and identify every place a relief vent, yoke vent, or vent header is required.

  • Size the water service, main, and branches for the same building using both the fixture-unit method and the probable-demand method, and explain the difference in results.

  • Solve ten trap-arm distance problems from memory using the trap-arm length table, and check each answer against the code.

  • Write a short comparison of a combined vs. separate storm and sanitary system and state which the local authority having jurisdiction (AHJ) requires in your area.

Your checkpoint

A three-story riser diagram plus a water-supply sizing worksheet showing fixture units, developed length, pressure loss, and final pipe sizes.

Week 3

Water Supply and Distribution Systems & Water Heaters and Hot Water Systems

  • Build a pressure-loss budget for a cold-water system from the meter to the topmost fixture, accounting for static head, friction, and fixture minimum pressure, and show the residual pressure at the most remote outlet.

  • Select a water heater type (storage, tankless, heat-pump, or indirect) for three different building scenarios and justify each choice with recovery rate, first-hour rating, and demand calculations.

  • Size the gas or electrical supply for the selected water heater and list the venting, relief-valve, and expansion-control requirements for a closed system.

  • Explain how thermal expansion, water hammer, and pressure-reducing valves interact in a tall building and describe where each control device is installed.

Your checkpoint

A water-supply pressure budget spreadsheet and a one-page water-heater selection memo covering three scenarios with sizing math shown.

Week 4

Storm Drainage and Special Waste Systems & Backflow Prevention and Cross-Connection Control

  • Size roof drains, scuppers, and leaders for a 1,000 m2 flat roof using a given rainfall intensity, and check the result against both the plumbing code and the local storm-drainage manual.

  • Design a secondary (emergency) roof drainage system and calculate the required overflow capacity for a 100-year storm.

  • Identify every cross-connection in a typical commercial kitchen and irrigation riser, classify each as a high or low hazard, and select the correct backflow preventer type (air gap, RPZ, double check, or vacuum breaker).

  • Draw the test procedure for a reduced-pressure zone (RPZ) assembly and list the five field-test readings a tester must record.

Your checkpoint

A storm-drainage sizing sheet with rainfall intensity, roof area, and drain counts, plus a cross-connection survey table listing each hazard, its degree, and the approved device.

Week 5

Fixtures, Faucets, and Fixture Fittings & System Testing, Inspection, and Troubleshooting

  • List the minimum fixture clearances, water closet compartment dimensions, and lavatory spacing for a public restroom and verify a sample floor plan against them.

  • Explain the difference between a fixture outlet, trap, and fixture fitting and identify the code requirement that governs each in a typical sink and flushometer installation.

  • Write a step-by-step hydrostatic and air-pressure test procedure for a new DWV system, including test pressure, duration, and what constitutes a failure.

  • Diagnose five common troubleshooting scenarios (gurgling trap, slow drain, fluctuating pressure, sewer odor, water-hammer noise) and state the most likely cause and the confirming test for each.

Your checkpoint

A restroom plan compliance checklist and a written test-and-inspection procedure that could be handed to an inspector.

Week 6

Plumbing Code, Standards, and Permits & Project Management, Estimating, and Safety

  • Assemble a permit submittal package for a small commercial project listing every required drawing, calculation, and form, and name the code edition and local amendments that apply.

  • Map the inspection sequence (underground, rough-in, top-out, final) to the work stages that must be complete before each inspection can pass.

  • Prepare a takeoff for a 20-fixture commercial restroom, including pipe, fittings, hangers, and fixtures, and price it with current local material costs.

  • Write a job-hazard analysis for a trench excavation and for confined-space entry into a sewer manhole, naming the required protective equipment and permit conditions.

Your checkpoint

A permit submittal checklist and a costed material takeoff with a one-page safety plan for excavation and confined-space work.

Week 7

Plumbing Systems Design and Layout & Sanitary Drainage, Waste, and Venting & Backflow Prevention and Cross-Connection Control

  • Redo one full building layout from scratch under timed conditions, sizing the water, DWV, and backflow protection without reference notes, then grade it against the code.

  • Review every wrong answer from weeks 1-6 and write a corrected rule statement for each mistake.

  • Explain to a mock apprentice, in plain language, how a vent protects a trap seal and why an improperly installed air admittance valve can fail.

  • Confirm the local amendments and licensing requirements for your jurisdiction, including continuing-education hours and exam format.

Your checkpoint

A timed practice layout scored against a self-built answer key, plus a personal error log with a corrected rule for every miss.

Week 8

Water Supply and Distribution Systems & Storm Drainage and Special Waste Systems & Fixtures, Faucets, and Fixture Fittings & Water Heaters and Hot Water Systems & Plumbing Code, Standards, and Permits & System Testing, Inspection, and Troubleshooting & Project Management, Estimating, and Safety

  • Take two full-length timed practice exams covering all ten domains and record the score per domain.

  • Drill only the two weakest domains until each reaches at least 75 percent on a fresh set of questions.

  • Rehearse the code-book index: locate ten random requirements within two minutes each without prior knowledge of the section number.

  • Finalize an exam-day plan covering allowed references, calculator, identification, and time allocation per question.

Your checkpoint

Two scored practice exams with a per-domain score chart and a written exam-day logistics plan.

Milestones

Week 2: Can size a full DWV system and a water service from scratch, with code citations, in under 90 minutes without notes.

Week 4: Scores at least 70 percent on a self-made 30-question quiz covering storm drainage and backflow prevention, including correct device selection for high- and low-hazard cross-connections.

Week 6: Produces a complete, inspection-ready permit submittal checklist and a costed takeoff with totals within 10 percent of a supplier quote.

Week 8: Scores at least 75 percent overall on two full-length timed practice exams and at least 70 percent in every individual domain.